ML20128Q656
ML20128Q656 | |
Person / Time | |
---|---|
Issue date: | 09/06/1979 |
From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
To: | Grier B, James Keppler, James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
Shared Package | |
ML20126K036 | List: |
References | |
FOIA-85-301 IEB-79-14, NUDOCS 8507270026 | |
Download: ML20128Q656 (4) | |
Text
- *
,i ,
September 6, 1979 HEMORANDUM FOR: 8. H. Grier, Director, Region !
i* J. P. O'Reilly, Director, Region II J. G. Xeppler, Director, Region III K. V. Seyfrit, Director, Region IV R. H. Engelken, Director, Region V FROM:
- N. C. Moseley, Director, Division of Reactor Operations Inspection, Office of Inspection and Enforcement
SUBJECT:
SUPPLEMENT 2 TO IE BULLETIN N0. 79-14. SEISMIC ANALYSES FOR AS-8UILT SAFETY-RELATED PIPING SYSTEMS Inspectors, licensees, and architect engineers have asked a number of questions about the intent of requirements in Bulletin 79-14. To provide for uniform implementation by licensees and uniform inspection by NRC, a second supplement to the bulletin was prepared and is enclosed. Positions set forth in this supplement were discussed with the field staff on August 30, 1979. Supplement 2 should be dispatched on September 7,1979, to all power reactor facilities with an operating license or a construction permit.
As indicated in Supplement 2, a number of Itcensees are inspecting their safety-related piping systems against revisions of drawings other than those used as input to the seismic analysis. Architect-engineers are then comparing the marked-up drawings to the model used in the seismic analysis. To obtain
, assurance that these evaluations are competently done, we expect to ask for inspection of each architect engineer doing this work. To scope the inspection offort, we need to know which licensees are using this approach and which architect-engineer organizations are doing the evaluations. Each region is requested to obtain this information and relay it to the headquarters contact by September 14.
Norman C. Moseley, Director Division of Reactor Operations Inspection Office of Inspection and Enforcement
Enclosures:
- 1. Oraft Letter
- 2. Supplement 2 to IE Bulletin No. 79 14 f ,, g CONTACT: R uff, I
- f' WPU/SM Office R0!!IE NRR T I: E 8 01IIE 9/5/79 Surname RWopdruff SHosford ELJ CMoseley Job M Date 9/f /79 9/s/79 9/ /79 9/)3rdan
/79 g72 g 6OD0610 MMMMANUS-301 l'DH
e (Draft Letter to all facilities with an operating license or a construction >
permit)
IE Bulletin No. 79-14 Supplement 2 Addrespee:
The enclosed supplement to Bulletin No. 79-14 is forwarded to you to provide added guidance on the intent of the Bulletin. If you desire additional information regarding this matter, please contact this office.
Sincerely, Signature (Regional Director)
Enclosures:
- 1. Supplement 2 to IE Bulletin No. 79-14
- 2. List of IE Bulletins Issued in the Last Six Months
- e e
e
,p"'%,
irjj UNITED STATES
['heu t,
- e..*
/
/*f NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20S55 I
_ A <~ .s J t
A -
I
- l l
l l
l 1
E
a ,a - -- - --..-_-= _ -_. .___.J -
- _w. m J a . , _
e e g 6
N o T e-RENG l I *IS HAtqDLtnq
'l 3 - ( 4 F o /d kMA(c
- 2947G ,
l 1
jy/3
- __ -- _ - - - --_ - . - _. . . .