ML20128Q618
| ML20128Q618 | |
| Person / Time | |
|---|---|
| Issue date: | 08/15/1979 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Grier B, James Keppler, James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20126K036 | List: |
| References | |
| FOIA-85-301 IEB-79-14, NUDOCS 8507270018 | |
| Download: ML20128Q618 (2) | |
Text
__ _ _ - _
i
.y pnec
~
A y,_
fo,j UNITED STATES y
v, g
NUCLEAR REGULATORY COMMISSION 2
. a was eincrow o.c.rosss
(
k-i August 15, 1979 i
MEMORANDUM FOR:
- 8. H. Grier, Director, Region I J. P. O'Reilly, Director, Region II i
J. G. Keppler, Director, Region III X. V. Seyfrit, Director, Region IV R. H. Engelken, Director, Region V l
FROM:
N. C. Moseley, Director, Division of Reactor Operations
?-
Inspection, Office of Inspection and Enforcement i
SUBJECT:
SUPPLEMENT TO IE BULLETIN N0c 79 SEISMIC ANALYSES FOR AS-BUILT SAFETY-RELATED PIPING SYSTEMS i
The subject supplement should be dispatched today to all power reactor facilities with an operating license or a construction permit.
i t
Th1 text of the supplement and draft letter to licensees are enclosed for this purpose.
/
%.f i+ g'Moseley, Director e
ah
" Divi'i n of Reactor Operations Inspection Offi of Inspection and Enforcement i
i
Enclosures:
1.
Supplement to IE Bulletin 79-14 i
j 2.
Draft Letter i
)
?
CONTACT:
R..ldoodruff, IE I
H. Wong, IE 49-28180 i
I f
l 0
g72 9 950618 t
i HERNM S-301 PDR
o (Draft letter to all facilities with an operating license or a construction d
' permit)
Supplement IE Bulletin 79-14 Addressee:
The enclosed supplement to.Bulletin 79-14 is forwarded to you to provide added guidance on the intent of the Bulletin.
If you desire additional inform $itionregardingthismatter,pleasecontactthisoffice.
Sincerely, Signature (Regional Director)
Enclosure:
Supplemen:,IE Bulletin No. 79-14 w
e e
..