Rev 2 to 14210-2, Containment Bldg Penetrations Verification - Refueling
ML20113G546
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/08/1989
From: Cash J
GEORGIA POWER CO.
To:
Shared Package
ML20092F288 List: ... further results
References
CON-IIT05-279-002-90, CON-IIT5-279-2-90, RTR-NUREG-1410 14210-2, NUDOCS 9202210458
Download: ML20113G546 (8)


Text

-

e

'[Abw,.i

=

=

~

1 cos.,w 1

fj Vogtla Electric Generating Plant 14210-2 (qq fJUCLEAR OPERATIONS 6

g,g yo.

2 g g gc/

unn __2 Geoigla Power N.T of 6 D 'i ? " I l ~ 2 b CollTAINMENT BUILDING PENETRATIONS VERIFICATION - REF_UELING l

1.0 PURPOSE 1.1 The purpose of this procedure is to verify Containment Building Fenetrations status prior to and during refursling or core alterations or movement of irradiated fuel within the Containment.

1.2 This surveillance satisfies Technical Specification 4.9.4 1.3 The frequency of this surveillance is within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />

)

prior to the start of and at least once every seven days during core alterations or movement of irradiated fuel in the Containment Building.

2.0 APPLICABILITY This surveillance is required prior to and during core alterations or movement of irradiated fuel within the Containment Building.

3.]

PRECAUTIONS /LIMITATI0t{S Notify the Unit Shift Superviror (USS) irmy if a

any condition of this procedure is not sat 6.L S.

gex;4. 0 PREREO,UISITES/ INITIAL CONDITIONS _

W d 4.1 The U$S shall ensure this surveillance o

test does not affect other testa e

pren antly in progress or jeopardize z

plant operation prior to granting approval to perform this surveillance o

test.

]

DSS APPROVAL Ct:4.2 CONTACT Work Planning and ENSURE there are no outstanding Maintenance Work Orders (IN0s) which could affect.

Containment (CNMT) integrity and TAKE appropriate action, i.e. clearance, on any penetration determined to pr,., vide a direct path from inside CNMT to A

outside environment.

I 1

USS ~

~

9202210450 920116 gDR ADDCK0500g4 g

,,, m

wa 4

P" *iC[ DVH L N O HL ViEON PAULteu VEGP 14210-2 2

2 of 6 INITIALS 5.0 INSTRUCTIONS TEST STARTED Date

~ Time Mode 5.1 COMPLETE Data Sheet to verify Containment Building penetration status.

5.2 COMPLETE 14928-2, " Containment Ventilation Isolation Refueling".

5.3 VERIFY that Steam Generator secondary manways ara installed or no direct l

access patn from CNMT exists through main steam, feedwater or blowdown.

6.0 ACCEPTANCE CRITERIA 6.1 The Containment Equipment Door is closed and held in place by a minimum of four bolts.

6.2 A minimum of one door in each airlock is closed.

6.3 Each penetration providing direct access from the Containment atmosphere to the outside atmosphere shall be either a.

Closed by an Isolation Valve, Blind Flange, or Manual Valve, or, b.

Be capable of being closed by an operable automatic Containment Ventilation Isolation valve.

7.0 REFERENCEJ; 7.1 P& ids 7.1.1 2X4DB110 Post Accident Sampling System 7.1.2 2X4DB132 Miscellaneous Leak Detection System 7.1.3 2X4DB213-1,2 Containment Air Purification and Cleanup System 7.1.4 2X2D01J013 Containment k'all Liner Pla te Penetration Schedule 7.2 PROCEDURES 14928-2,

" Containment Ventilation Isolation Refueling" END OF PROCEDURE TEXT

.u.o

g-,.

l Procedure W We Page No VEGP 14210-2'

_2 3 of 6-Sheet 1 of 4 DATA SHEET 1

-CONTAINMENT BUILDING PENETRATIONS VERIFICATION - REFUELING REQUIRED COMPONENT DESCRIPTION PENETRATION STATUS BLDG /LVL INITIALS FLANGE MISC LEAK DET FLANGE 64A INSTALLED FHB RA01 UPPER MEZZ FLANGE MISC LEAK DET FLANGE 64B INSTALLED FHB RADI "PPER MEZZ 2-1222-U4-051 MISC LEAK DET CNMT TEST 68 LOCKED CLOSED AUX /B GAS FILL CONN INLET

& CAPPED ROOM B131 l

2-1222-U4-026 MISC LEAK DET CONTAINMENT 68 LOCKED CLOSED AUX /B LEAK TEST ISOLATION ROOM B131 2-1505-U4-001 PREACCESS PURGE SPLY-83 LOCKED CLOSED EQUIP BLDG TEST CONN

& CAPPED LEVEL 1 2-1506-U4-001 PREACCESS PURGE EXH 84 LOCKED CLOSED ORC BY TEST CONN

& CAPPED PERSONNEL AIRLOCK I1ANGE SLUDGE LANCE / EDDY' 5

INSTALLED AUX /B SG PEN CURRENT HOSE / CABLE ROOM B131 OUTAGE CNMT PENT X-017 TEST CONN

~,

LOCKED CLOSED AUX /B SC PEN ROOM B131 FLANGE SLUDGE IANCE/ EDDY 90 INSTALLED AUX /B SG PEN CURRENT HOSE / CABLE ROOM B131 OUTAGE CNMT PENT-

.w o

~.

~.

,, ~

+

..., _,. - _ ~ _ _ _ - -

~

g

,7

=

i l

meeoure no.

%s.or-e.g. m VEGP 14210 2 4 of 6

. DATA SHEET 1 CONTAINMENT BUILDING PENETRATIONS VERIFICAT'j.3 - REFUELING REQUIRFJ COMPONENT.

DESCRIPTION PENETRATION STATUS BLDG /LVL INITIALS X-019 TEST CONN

~

90 LOCKED CLOSED AUX /B SG PEN ROOM B131 FLANGE SLUDGE LANCE / EDDY 55 INSTALLED AUX /A MFW l

CURRENT HOSE / CABLE PEN ROCM Alb>

l)

OUTAGE CNMT PENT X-018 TEST CONN 55 LOCKED CLOSED AUX /A MFW PEN ROOM A105 2-HV-8212 PASS GAS SAMPLE RTN-ORC 86A CLOSED 2-1222-U4-052 MISC LEAK DET CNMT TEST 87 LOCKED CTESED AUX /B ll GAS FILL CONN INLET

& CAPPED ROOM B131 2-1222-U4-027 MISC LEAK DET CONTAINMENT 87 LOCKED CLOSED AUX /B LEAK-TEST ISOLATION-ROOM B131 l

2-1508-U4-012 POST-LOCA EXH CTB PURGE 100 LOCKED CLOSED AUX /3 FILTER EXH ISO (Roof) 2-1508-U4-001 CAPCS POST-LOCA PURGE 100 LOCKED CLOSED AUX /3 SUCTION TEST CONN ISO

& CAPPED (Roof) 2-HV-2791A H2 MONITOR B SPLY ISO ORC 70A CLOSED 2-HV-2791B H2 MONITOR A SPLY ISO ORC 71A CLOSED

  • Verify position at QPCP

,n.

.m

. ~. -..

s IPnneMe No Msam

% No VEGP 14210-2 2

5 of 6 Sheet 3 of 4 DATA SHEET 1 CONTAINMENT BUILDING PENETRATIONS VERIFICATION - REFUELING REQUIRED COMPONENT DESCRIPTION PENETRATION STATUS BLDG /LVL INITIALS 2-HV-2793A H2 MONITOR B RTN ISO ORC 70B CLOSED 2-HV-2793B H2 MONITOht A RTN ISO ORC 71B CLOSED COIEAINMENT EQUIPE NT HATCH CLOSED / HELD BY MIN OF 4 BOLTS **

PERSONNEL AIRLOCK ONE DOOR CLOSED EMERGENCY AIRLOCK ONE DOOR CLOSED Ii I

Verify position at QPCP

    • Must be verified inside Containment L

A

enoctpunt90 ntvision not,,o VEGP 14210-2 2

6 of 6 Sheet 4 of 4 DATA SHEET 1 CONTAINMENT BUILDING PENETRATIONS VERIFICATION - REFUELING EVALUATION AND REVIEW l

TEST PURPOSE

[ ] Surveillance

[ ] Maintenence Retest

[ ] Other (explain)

Results obtained through performance of this procedure meet l

ACCEPTANCE CRITERIA of Section 6.0.

[ ]=YES

[ ] No If NO was checked, NOTIFY the Unit Shift Su and REFER to Technical Specification 3.9.4.pervisor (USS) a.

b.

Comments-(include any abnormal conditions and corrective

-actions taken):

t c.

USS notified of test completion and results.

/

/

-1 Initial Date Time Test Completed By

/

/

Signature Date Time

-Supervivory Review

/

/

31gnature Date Time t

P

)

OVERSIZE 1

DOCUMENT PAGE PULLED SEE APERTURE CARDS f

NUMBER OF OVERSIZE PAGES FILMED ON APERTURE CARDS e

9202260 Y/S~

I 920e ecso yt7

~

l APERTURE CARD /HARD COPY AVAILABLE FROM 92622.6C h3[

RECORDS AND REPORTS MANAGEMENT BRANCH I,[.g>

f k

--e.

,-e.y-,,

-,.,+.--c.

..ms.

-c,,,,

e-

.-,,_m-w.i....

..,s... -.

...-r.,+e.v...---

e

=.e.,-

-e e

N.

1 OVERSIZE DOCUMENT PAGE PULLED SEE APERTURE CARDS NUMBER OF OVERSIZE PAGES FILMED ON APERTURE CARDS 7202 a 7c +sb scr APERTURE CARD /HARD COPY AVAILABLE FROM RECORDS AND REPORTS MANAGEMENT BRANCH f

/

/

,g-

.se i s

Tf L J a

-___-____..__-----__~----.----.._.-__-___-._.__-.__---__-___--___________m__._.___--_________s_________--