1 I

'~ ~ ~~

  • wo es j

Vogde Flectr6c Genetting Plant 22408.C

[e,I*

NUCLEAR OPERADONS

,% s on so.

0 Dm COMON i

Georgia Power e.

~..

Unit 2 g 77 1 Of 7 1

l i

<?

i

\\

I 4

1 CIRCUIT BOARD RDtOVAL AND r

REINSTALLATION Y

4

.w WORKING COk vtMPV 10 t#tST C:8(M ELK.R.E "

sno wrung OAm W m,W 05 _

J/lidsman ahda i,_

l

.e m.

t 9002210456 920116 PDR ADOCK 0D000^24

_B

.PDR :

1 J octov- %~

~~"

a t v.sion not %o VEGP 22408-C 0

2 of 7 1.0 PURPOSE The purpose of this procedure is to provide specific instructions for removal and reinstallation of Circuit Boards.

2.0 PPECAUTIONS AND LIMITATIONS 2.1 All steps in this procedure ara to be performed in sequence as noted.

[]

2.2 Performance of precedure steps, as indicated by a double asterisk (~*/*), shall be initialed on

" Checklist".

()

~

2.3 For Non-Safety Related systems q' C Hold Points may be Larked Not Applicable (N/A) on Checkliet".

[]

2.4 For Safety Related

'! systems, the following

1. hall be performedi a.

Independent Rt'forstte VMi>>ication (SR).

[]

b.

EQDP steps (EQDP)

[]

2.5 If during performance of t%l.a procad:are, any of the following occur, immediata.y notify 142 Foremsn.

2.5.1 Any personnel error, procedure inadequacy, or malfunction is identified which could prevent fulffilment of " Acceptance criteria".

Il 2.6 Minimize entry of foreign materials or dirt into sorking parts of circuit board.

(j 2.7 Circuit board may be located in a radiation area, eervice a contaminated process fluid, or be contaminated.

If so, follow instructions on " Radiation Work Permit".

[]

2.0 Ensure that each lead (s' ire; to be lifted is marked with a completed and installed Jump"er and Lifted Wire tag.

Inscead of " Control No." the Procedure No."

should be identified on the trg,

()

2.9 If this procedure is complated and temporary jumper (s) must remain installed and/or lifted wire (s) cannot be reconnected, a Jumper and Lif ted Wire Clearance must be obtained per Procedure 00306-C, " Temporary Jumper And Lifted Wira Control".

Il i

'!)..l

pacctOWE NC K'E venioN PAGE No

~~

vgcP 22408 C

-0 3 of 7 3.0 PREREQUISITES OR INITIAL CORDITIONS 3.1 Notify' Shif t Su1ervisor, or designee, of work to be

  • /*

perforaed and ostained signature authorization.

()

3.2 Notify Reactor Operator of equipment that may be

  • /*

erratic or inoperable duritig perforwance of this

~ ~ * '

procadure and obtain RO signatures

()

-3.3 MINIMUM PARTS REQUIRED 3.3.1 Replacement Circuit Board

()

3.4 Circuit Board-and parts shall be tagged with proper

  • f*

identification and terienability.

()

3.5 Verify all Prerequisites or initial conditions are

  • L*

met.

[]

4.0 CIRCUIT BOARD _ PROVAL AND REPLACDelff 4.1 RACK HOUNTED CIRCUIT BOARD 4.- l.1 Remove retaining screws or clips.

(;

4.1.2 Remove circuit board by pulling out until clear of rack guide's.

()

4.1.3 QC Hold Point Obtain QC authorization to procaed before continuing []

with procedure.

NOTE Refer to Fuse List and/or Vendor. Inferination (samaal) to determine fuse size and type.

6.1.4 Verify all, fuses on circuit board are of appropriate

  • /*

' size and type.

(Indepqndent Verification required).!)

(EQDP)'

4.1.5.

Install circuit board.

()

  • /*

age.k l

[

+.ipc. tov. we cu evow n t,,A

]

e VECP 22408-C 0

4 of 7 4.1.6 1.isert into rack guides slide straight into rack until

  • f*

fully inserted fasten screws or ellps.

[]

A.2 CIPCUIT BOARDS NOT RACR MOUNTED 4.2.1 Remove viring connectors and/or terminals.

()

4.2.2 Remove circuit board mounting hardware and circuit board.

()

4.2.3 QC Hold Point sje

~~~'

Obtain QC authorization to proceed before continuing ()

with procedure.

NOTE Refer to Tuse List and/or Vendor. Information (manual) to determine fuse size and type.

4.2.4 Verify all fuses on circuit board are of appropriate

  • /*

size and type.

(Indapendent Verificati.en required).[]

(EQDP) 4.2.5 Install circuit board and tighton mounting hardware.[]

  • /*

4.2.6 QC Hold Point

  • /*

Obtain QC authorization to ptoceed before continuing ()

with procedure.

4.2.7 Reconnect wiring connectors and/or terminals.

(1

  • /*

(SR) 4.2.8 Have an Independent Restoration Verification performed

  • /.*,

by designatad personnel.

()

4.2.9 Notify Shift Supervisor, or designee, of completion

  • /*

of work and obtain signature on Completion Sheet". []

5.0 ACCEPTANCE CRITERIA 5.1 The Acceptance Criteria for this procedure is that the circuit board has been installed as indicated on

" Checklist".

"k4

=. _

i A.,..s.*,

u t,+.us p.o a,,o VECP 22408 C 0

5 of 7 p

3.2

$adsfactory completion of this procedure has been met whms-ILC Foreman has evaluated data obtained per Aceeptance Criteria of this procedure, reviewed, and siped " Checklist" and " Completion Sheet".

{

6.0 RErtRENCES 6.1 Vendor Manuals l

6.2 Ep Spec. AX3AD01, X5AB01, X6AA75, X3AE01, X3AE'J3, X3aE06 6.3 PROCEDUR ES 6.3.1 20004-C

" Control of In-Process Meterial" 6.3.2 00853-C, " Material Idantification,. Control And Issue" 6.3.4 00M6-C, " Temporary Jumper And Lif ted Vire Control" i

r 4

END OF PkOCEDITRE TEXT i

9 i

t 9

e l

9 9

)

k een

"!)441 1,,,-.,...,,,--,.

.-,...,.4.-

..L.......-,,._.-

~

s

o

" ~ ^

eaccthen a,o et visios s u.a o WCF 2248.C 0

6 of 7 4

FORT SE WITH CONTROL NO. *em CHECKLIST SHEIT 1 _OF 1 3.1 Shif t Supervisor Mthorization M INSOL p ? 4 07 Signature Date 3.2 Reactor Operator (RO) Notified -

ry 1.,[.,

22940 N

Signature Date STEP VERITICATION 5tep/5ubstep Initial 5tep/5ubstep Initials 3.4 Boards Tagged O.AI 4.2.3 QC Notified M/A-3.5 Prerequisites are met fAf 4.2.4 Correct fuses installed

///4 4.1.3 QC Notified W/A-4.2.4 Independent Verification

///,k 4.1.4 Correct fuses kA' inaealled (EQDP) 4.1.4 Independent 4.2.5 Beard Verification

.6///h installed A//d-(EQDP) 4.2.6 QC Notified M/4-4.1.5 Board installed EAT 4.2.7 Wiring

,fg 4.1.6 Clips /screwr -

connected

///f d A*I, fastened KE5TOKATION VLKIFICATIUM INITIAL INITIAL N

l.-

Board installed and secured 2.

Connections / connectors g/L installed Performed by: (,'ejl

.'Ide cA Date

'). - 1. 4 - D Reviewed by: N Date L' L Y

'Tb g

n..,

l.l

._ _ _ _ ____ _ __ _ __ _ __.___ _ ____ __ ____ _ ________ ___ _ J

~~

GOOct'Ov t NO l Lt vil'ON not 80 VEGP 21408 C 0

7 of 7 Sheet 1 of 1 COMPLETICN SHEET FROCEDURE TITLE CIRCUIT BOARD REMOVAL AND REINSTALLATION TEST EQUIPMEMT USED ID NO.

MODEL NO.

CALIBRATION DUE DA,T_E k

Ns

..,/

M[ N N

N DEFICIENCIES OCCUR. LED AND ACTIONS TAKT.N Alcen c e.nues

. esp 9

% f.

  • T 8% O 8k O4 snIrr SUPERVISOR NOTIFIED 7C b.d
  1. M'/ak 2.20d s"ignature nme Date REVIEVED BY h/ _c, DATE h2 O70 APPROVED BYi d,s1 f,

.DATE i' <> V o g

i

'i)ef %

1

__