7 Vogtl] E!cetric Gener; ting PI:nt YO[o.t g
NUCLEAP OPERATIONS i
Date 4
1
// _ gp Geoigia Power
% 7,, 3 unit
^ qg '[ - j. 'f d CONTAINMENT BUILD.ING PENETRATIONS, VERIFICATION - REFUELING h3 1.0 PURPOSE CC
$3 1.1 The purpose of this procedure is to verify Containment ua Building Penetrations status prior to and during C3 refueling or core alterations or movement of irradiated c3 fuel within the Containment.
25
<C 1.2 This surveillance satisfies Technical Specification a
4.9.4 C5 1.3 The frequency of this surveillance is within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> CC prier to the start of and at least once every seven days during core alterations or movement of irradiated fuel in the Containment Building.
2.0 APPLICABILITY This surveillance is required prior to and during core alterations or movement of irradiated fuel within the Containment Building.
3.0 PRECAUTIONS / LIMITATIONS Notify the Unit Shift Supervisor (USS) immediately if any condition of this procedure is not satisfied.
INITIALS 4.0 PREREQUISITES / INITIAL CONDITIONS 4.1 The USS shall ensure this surveillance test does not affect other tests presently in progress or jeopardize plant operation prior to granting approval to perform this surveillance
- test, USS APPROVAL 4.2 CONTACT Work Planning and ENSURE there are no outstanding Maintenance Work Orders (MW0s) which could affect Containment (CNMT) integrity and TAKE appropriate action, i.e. clea ran ce,
on any penetration determined to provide a direct path from inside CNMT to l
outside environment.
U55 9202210455 920116 PDR ADOCK 05000424
- n a v.
g p9p
.,, ~~
-: t.
PROCEDURE No..
8Ey$lON
~YGL No.
~~~
~
'VEGP!
_'14210-1 4
2 of 5 2 _,,, -
l.
INITIALS 5i0 INSTRUCTIONS TEST STARTED'
lia t"e7 "TT6F ~ Mode
~'
5.1 COMPLETE Data Sheet 1 to verify Containment huilding penetration status.
5.2 COMPLETE 14928-1, " Containment Vent.ilation Isolation Refueling".
-5.3-VERIFY that Steam Generator secondary manways are installed or no direct acces's path from CNMT exists through main steam, feedwater or blowdown.
6.0 ACCEPTANCE CRITERIA 6.1 The Containment Equipment Door is closed and held in place by a minimum of four bolts.
6.2 A minimum of one door in each airlock is closed.
6.3 Each penetration providing direct access from the Containment atmosphere to the outside atmosphere shall-be either:
a.
Closed by an Ioolation Velve,-Blind Flange, or Manual Valve, or b.
Be capable of being closed by an operable -
automatic Containment Ventilation Isolation Valve.
7.0-REFERENCES _
7.1 P& ids 7.1.1 1X4DB110 Post Accident Sampling _ System 7.1. 2 IX4DB132 Miscellaneous Leak Detection System 7.1.3 1X4DB213-1,2 Containment Air ' Purification and cleanup System
- l 7.1.4 IX2D0lJ013 Containment Wall Liner Plate Penetration Schedule 7.2 PROCEDURES 14928-1,
" Containment Ventilation Isolation Refueling" END OF PROCEDURE TEXT we
~5
.v 7
Procecure No, Revisiori PageNoc VEGP' 14210 4 3 of 5
^
l Sheet 1'of 3 DATA SHEET 1
.t.
CONTAINMENT BUILDING PENETRATIONS VERIFICATION - REFUELIN_G REQUIRED COMPONENT DESCRIPTION PENETRATION STATU$ _
BLDG /LVL INITIALS-1 FLANGE "tfISC LEAK-DET FLANGE
'64A INSTALLED
-FHB RA10' s
UPPER MEZ
)
I FLANGE MISC LEAK DET' FLANGE 64B INSTALLED FHB RAIO
-l UPPER MEZ-1-1222-U4-051 HISC LEAK DET Clinf TEST 68 LOCKdD CLOSED AUX /B GAS FILL CONM INLET
& CAPPED ROOM B08 1-1222-U4-026 MISC LEAK DET CO2TTAINMENT 63 LOCKED CLOSED AUX /B LEAK TEST ISOLATION ROOM B08 1-1505-U4-001 PREACCESS PURGE SPLY 83 LOCKED CLOSED EQUIP BLDG
-TEST CONN
& CAPPED LEVEL 1 1-1506-U4-001 PREACCESS PURGE EXH 84 LOCEED CLOSED ORC BY TEST CONN
& CAPPED PERSONNEL-AIRLOCK ii
- I
-.c
Prcredure No.
Revisiori Page No.
VEGP 14210-1 4
4 of 5 Sheet 12 of 3 DATA SHEET 1 CONTAINMENT BUILDING PENETRATIONS VERIFICATION
-REFUELING REQUIRED COMPONENT DESCRIPTION PENETRATION STATUS BLDG /LVL INITIALS-l 1-HV-8212 PASS GAS SAMPLE RTN-ORC 86A CLOSED 1-1222-U4-052 MISC LEAK'DET CNMT TEST 87 LOCKED CLOSED AUX /B GAS FILL CONN INLET
& CAPPED ROOM B08 l
1-1222-U4-027 MISC LEAK DET CONTAINMENT 87 LOCKED CLOSED AUX /B LEAK TEST ISOLATION ROOM B08
-l 1-1508-U4-012 POST-LOCA EXH CTB PURGE 100 LOCKED CLOSED AUX /3 FILTER EXH ISO (Roof) i 1-1508-04-001 CAPCS POST-LOCA PURGE 100 LOCKED CLOSED AUX /3 SUCTION TEST CONN ISO
& CAPPED (Roof) 1-HV-2791A H2 MONITOR B'SPLY TSO. ORC 70A CLOSED 1-HV-2791B H2 MONITOR A SPLY ISO ORC 71A CLOSED 1-HV-2793A H2 MONITOR,B RTN ISO ORC 70B CLOSED 1-HV-2793B
'H2 MONITOR A RTN ISO ORC 71B CLOSED CONTAINMENT EQUIPMENT HATCH CLOSED / HELD BY MIN OF 4 BOLTS **
PERSONNEL AIRLOCK ONE DOOR CLOSED EMERCENCY AIRLOCK ONE DOOR CLOSED Verify position at QPCP
- Must be verified inside Containment se,r
PROCEDURE No.
REvtSION ME NO i
LVEGP 14210-1 4
5 of 5 Sheet 3 of 3 DATA SHEET 1 CONTAINMENT BUILDING PENETRATIONS VERIFICATION - REFUELING EVALUATION AND REVIEW TEST PURPOSE
[ ]' Surveillance
[-] Maintenance Retest
[ ] Other (explain)
Results obtained through performance of this procedure meet ACCEPTANCE CRITERIA of Section 6.0.
[ ] YES
[-] NO If NO was checked, NOTIFY the Unit Shift Su and REFER to Technical Specification 3.9.4.pervisor (USS) a.
b.
- Comments-(include any abnormal conditions and corrective actions taken):
d I
c.-
USS notified of teat completion and results.
U
/
/
Initial Date Time Test Completed By
/
/
Signature Date.
Time Supervisory Review
/
/
Signature Date Time p
?
e mws