Responds to to IR Finfrock Re Insp on 740121-25. Items 7 & 9 Addressed
ML20107J950
Person / Time
Site: Oyster Creek
Issue date: 04/23/1974
From: Ross D
JERSEY CENTRAL POWER & LIGHT CO.
To: James O'Reilly
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML18039A986 List: ... further results
References
FOIA-95-258 NUDOCS 9604250327
Download: ML20107J950 (2)


Text

.-

l

~

f I

I Jersey Central Power & Lig1t Company MADISON AVENUE AT PUNCH BOWL ROAD e MORRISTOWN, N.J. 07960

  • 201-539-6111 Nimann OfTHE Public Utilities Corporation General {

SYSTEM April 23, 1974

~~

Mr. James P. O'Reilly, Director Directorate of Regulatory Operations, Region I United States Atomic Energy Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. O'Reilly:

This letter is in reply to your letter of April 2,1974 to Mr. Ivan R. Finfrock J

regarding the inspection conducted by Mr. Greenman on January 21-25,1974 at the Oyster Creek Nuclear Generating Station. As per your instructions, this response addresses only Items 7 and 9 of the enclosure to your letter.

Item 7:

Frequency of Testing the Diesel Generators' Starting B.tteries Several actions have been taken to preclude the recurrence of this type of violation.

On January 29, 1974, new controls were established for the review and disposition of completed surveillance test records. More specifically, these new controls more clearly delineated responsibilities for the routing of completed test records and reduced the number of individuals involved in the data review without compromising review quality. These surveillance program improvements have reduced the time interval between surveillance test performance and the completion of test data review to one or two days. This time period rarely exceeds three days.

Additional. corrective action involved the development of a new surveillance test data sheet for exclusive use in the weekly testing of the station and diesel generator batteries. Test data from this weekly testing had previously been recorded on data sheets which were used to satisfy several different surveillance requirements. The elimination of the confusion associated with the use of the

" multi-purpose" data sheets should further contribute to the timely performance of the weekly station and diesel generator battery surveillance testing.

Full compliance has been achieved.

Item 9: Tardiness in Abnormal Occurrence Reporting Abnormal Occurrence No. 73-23 dated September 25, 1973 was verba11/ reported by telephone on Monday, September 24, 1973 at 6:00 PM.

The follow-up preliminary 9604250327 960213

~

PDR FOIA DEKOK95-258 PDR

1

'f, '"

1 o.

1 L

4 i

Mr. O'Reilly April 23, 1974 written notification was sent by telecopier on Tuesday, September 25, 1973 a't 3:00 PM. The station superintendent was advised of the abnormal occurrence on -

Monday and therefore provided the reports in the time frame required by the Technical Specifications.

2 The delay, if any, associated with this event, occurred between the occurrence (2:40 PM,. September 22, 1973) and the time it was recognized as an abnormal occurrence and reported to the station superintendent on September 24, 1973.

In an effort to minimize the possibility of this type delay in the future, a

. system was established whereby each surveillance test has attached a surveil-lance back sheet.

This form requires, among other things, the signature of the shift foreman who will acknowledge if a possible abnormal occurrence is associated

}

.with surveillance test results and, if so, he notifies the operations supervisor immediately, i

'To ensure that ten-day reports are submitted in a timely manner, definitive

{

time periods from the discovery of an abnormal occurrence to its final reporting j

have been reestablished by the manager of nuclear generating stations.

In addition, should the manager be absent at a time when a report is due, it will in the future be submitted by an alternate.

The alternates selected are the Oyster Creek Station Superintendent and the Oyster Creek Chief Engineer.

i Very truly yours, D

L-c i

Donald A. Ross Manager, Nuclear Generating Stations cs I