ML20107J782
Jump to navigation
Jump to search
Text
- _ _
t j
i i
t'MI 14 974 J. Tillou l
, senior Remeter Isopector Construstica Bransk
)
Of8TER CREEK (DN 50-219)
JCP6L has identified vessel, head clad indications which are surrently being j
' investigated, prior to returning the reactor to power on,Nay 27.
I It is requested that you provide technical support to determine the safety signif tsance, causative mechanism and extent of these indications and j
determine the status of other reactor internals with respect 60 this problem.
t j
l D. L. Cephton Senior Reactor Inspector 4
BWR Projects
)
Reactor Operations Branch cc:
J. P. O'Reilly R. Carlson E. Greenman
. {.
B. Davis Greenman Caphton 7-i i
~ 9604250260 960213 PDR FOIA j
DEKOK95-258 PDR
_