ML20107J234
Text
-
~ p :.
I UNITED GTATE3 ATOMIC ENERGY COMMISSION DIRECTOR ATE OF REGU6.ATORY OPER ATIONS h
(a l REGION t
! *l 431 PARK AVENUE KING OF PRUS$1 A.PsNNsYLVANI A 19406 APR p gg-4 i. h;.
Directorate of Regulatory Operations, RO:I D.~L. Caphton, Senior Reactor Inspector J.
x-JERSEY CENTRAL" POWER AND LIGHT COMPANY 4
OYSTER CREEK (DN-50-219) 50-219/74-02 This inspection was conducted primarily to close out on a substantial i
1 number of AO's and violations dating back to the last routine inspection
-(August 1973).
Inspection results indicate 9 violations - including several multipart violations. -Nine violations were reported by the l'icensee. Vi~oTations i
resulting from the inspection' included late reporting, both 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and-
~
- 10 day reports, failure to utilize procedures (jumper installation) and a surveillance test frequency violation.
The following action item was closed out during this inspection I 73-91 and Reinmuth memorandum to Carlson dated October 30, 1973 related to the Oyster Creek diesel generator restart problem. Testing appears adequate, and TAB (Thomas) informs me that the OC diesel generator fix appears to be one of the better ones. The licensee in adopting this fix has not considered OSHA applications.
The OC Abnormal Occurrence frequency is increasing markedly (10 so far in 1974).
This is partially attributable to the attention RO has focused on review and audit on the part of JCP&L. I do not feel that large numbers of AO's are necessarily indicative of poor vs. good performance.
The licensee has assigned two (2) personnel, internal audit respon-sibilities.
The following areas continue to be of concern:
1.
MSIV test spool valve problem - Insufficient residue was available for analysis. The licensee's proposed fix is valve replacement and aN2 atmosphere for outside valves.
2.
Chromate Water Storage - JCP&L has no approved plans to get rid of this water in " temporary storage."
- 3. 'The slow response from JCP&L concerning commitments-(1.e., RBCCW' leak).
My limited. review of health physics related items indicates that the new health physics supervisor is effective. This represents a significant
!O '
~
L p
.DEKOK95-258 PDR
D.* L. C:pht:n improvement. During discussions with maintenance personnel the maintenance supervisor received "four complaints" about IIP trying to "run the jobs'.'.
aul~h,..'fJ O
. YAward G. Greenman Reactor Inspector B
l l
i j
s s
l 4