' James P. O'Reilly Directorate of Regulatory Operations Region I.,
631 Park Avenue 1
King of Prussia, Pennsylvania 19406' Pion:
Jersey. Central Power 4 Light Company Oyster Creck Nuclear Generating Station, Docket #50-219 j
Perked River, New Jersey 08731
)
'e.
, ' ';l ;;c
(
- i
- t
Subject:
1he following report is being semitted for i'
your information as per phone conversation 1
of April 25, 1974.
- )$tt#W.
4 i
i YAkWh
/
/
4/25174 i
h/T. Carroll, Jr. f Date i
i cc: Mr. A. Giambusso 3
k i
t y,
960'42402'65 960213 PDR FOIA DEKOK95-258 PDR
((~~
Initici Written Time cf 4
f,.
Repost.Datos d/2' T4.
Occurrence 3
1100 w
M8111R CRBEK NUCLEAR' GEN 5 RATING STATI(W
]
PORKBD.. RIVER, NBW'JBR$2Y 08731
.. _._.p4; y.
-e g,,,g lf.4,,,.lL
..~-
i
_....,...=/..,,e*
Malw
- P-i b
IDENTIFICATION -
Cracking of torus to drywell vacuum. breaker valve V-26-2 disc j
OF OCWARBNG:
j at junction of disc bo# and stem. 1his failure coupletely separated the stem from the disc body and would have rendered j
j' the vacuum breaker valve inoperative had it occurred teder nonsal operating conditions.
i 1 l
Dis event is considered to be an abnormal occurrence as de-l l
' fined in the Technical Specifications, paragraph 1.15D.
CONDITI(MS PRIOR Stes # State Power Routine Shutdown j,
10 OCCURRENCB:
Hot Standby Operation
[l,
~
Refueling Shutdown Routine Power Operation Cold shutdown Imad Changes During l
X Routine Startup Other (Specify)
Operation 4
he reactor mode switch was in the REPUBL position and i
j reactor coolant temperaturw was approximately 103'F.
l DBSCRIPTION At approximately 1100'on April 24, 1974, while contractor OP OCCURRENCE:
l' personnel were. disassembling torus to drywell vacuum breaker i
valve V-26 2 for inspection and maintenance work, the valve disc cracked at the junction of the disc body and' stem.
no-disc body and stem are made of cast aluminus and cast as one-9 piece.
This failure completely separated the ste' n from the-disc body. At the time of the failure, the cont setor hi 1
j' /\\ '1 '[ f D
d hfvu(
)
v 'uv
1
..)
(
persaisial w:n tapping the associated disc nut in an effart r
ii '
to free and ultimately remove the nut from the disc stem.
his tapping was also used to free disc nuts on ninefpre-viously disassepled torus to drywell vacuum breaker valves.
! }l APPARluff CAUSE-Design Procedure OP OCCURRENCE:-
Manufacture thiusual Service Condition j
, Installation /
Inc. Environmental-Const metion Component pailure j
Operator Other (Specify) s y
1 j
' Initial visual examination of the crack surfaces revealed that 1
i most of this area was clean. Mcwever, some darkened (dirty)
!l areas were observed around the edges of the crack surfaces.
ji his would indicate that the cracking started sometime before j*
I, the complete disc failure on April 24, 1974. 1he apparent
- l l
cause of this occurrence is mder investigation at this time.
l f
!1 ANALYSIS OP.
1his valve disc failure is considered to have minimal safety j :
OCCURRENCE:
significance. Although the valve (V-26-2) would have been s
rendered inoperative had the failure occurred under normal operating conditions, the applicable requimments for torus to drywell vacuum bmaker valve operability specified in paragraph 3.5.A.3 of the Technical Specifications would have j,-
been-satisfied. However, the drywell-torus vacuum breaker 1 ;
1 valves are also rhuivis"to'be ' closed;during pipe break acci-
}
dents (particularly small breaks) to assure proper steam
[i condensation and prevent torus overpressure. 1he safety
- )
,J r significance of this event is that valve,V-26-2 might not have performed this function had the disc failum occurred s
I i
m-i.e== +m nl -
i
,e e
w
- _._. - - - ~ - _ _
N o
- pyy....as&fq:C :.y L
r%* *
^
i-l )
3
/
,[
during normal operating conditions and the disc been.subse--
[
quently removed fna its seat (by torus overpussure, weekly i
I I
operability testing, etc.).
ODMCriVB'l '
The discs of the other thirteen torus to drywell vaasum i
ACTION:
l betaker valves will be laspected for cracking in the sua li
. l of the disc body-stes junction. Additional items of cor-i rective action will be determined following nylew of this i
i incident by the Plant Operations Review Committee.
I j
FAILURE DATA:
Basic valve data are as follows:
Manufacturer: Atwood. 4 Norrill t
Type: Oseck Valve j
Disc Material: Cast Aluminum i.
Vent Area:.1.75 square feet per valve l
l
'l i
t.
iN i!
ll i
a bI r
i i
e e
' Pawpared by.'
i-Dau k/25/74' y