Ack Receipt of in Response to Ltr Re Calibration of Radiation Protection Instruments.Informs That Commitment to Do two-point Calibration of Radiation Protection Instruments Initially at two-yr Intervals
ML20107G987
Person / Time
Site: Oyster Creek
Issue date: 09/24/1975
From: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
Shared Package
ML18039A986 List: ... further results
References
FOIA-95-258 NUDOCS 9604240004
Download: ML20107G987 (2)


Text

,
Q' ?

-~~~ "~~--

i -

?

g.) p

'" A ~

)

UNITED ' STATES,

NUCLEAR _ REGULATORY COMMISSION '

  • ~

' i,

.J W ASHINGTo N. D.'C. 2055 5 1 B SEP 2 IWS 4

~

Docket No. 50-219 Docket No.'DPR.

-Jersey Central Power.6 Light Company.

ATTN: Mr. Ivan R. Finfrock, Jr.

Vice President Madison Avenue at Punch Bowl Road Morristown. New Jersey 07960 Gentlemen:

i Your letter dated June 27, 1975, in response to the letter dated May 27, 1975, which was sent to you by our Region I Office in

. King of Prussia, Pennsylvania, regarding calibration of radiation

' protection instruments, hac been referred to this office.

We note and confirm your commitment to do a two-point calibration j

of radiation protection instruments initially and at two-year

]

intervals. This type of calibration at' intervals of two years may be adequate for instruments used in routine surveys of low le gl radiation areas.similar to those found in a laboratory-type Prudence dictates, however, that careful cali-radfation program.

bration checks be made at more frequent intervals when instruments are subject to conditions, among others, of daily use in relatively high radiation levels under out of the' ordinary ranges of temper-4 ature and humidity; conditions often found in nuclear power plants.

In any event, it is expected that a forthcoming standard, ANSI N323, I

of'the American National Standards Institute will specify an annual frequency for this type of calibration. Tha standard will also I

cover the other basic requiremente of an adequate instrument main-tenance program.

e I

J e

y t

2 96d424'OO 4 960213 PDR FOIA

- DEKOK95.-2_58,

,P, DR p,

1

/

, ()

.)

\\

\\

v g_.

a Jersey Central-Power.& Light Co. SEP 2 41975 Frequent and careful e.alibrations of radiation protection instruments

- are an important part of overall radiat!.on safety and personnel pro-tection programs. :We trust you will reevaluate your calibration procedures and program when the ANSI standard is. issued. We will' review the matter again at that time.

Sincerely, A

hf./ % '

John G. Davis, Deputy Director Office of Inspection and Enforcement 9