Jersey Central Power & Light Company %d MADISON AVENUE AT PUNCH BOWL ROAD
- MORRISTOWN, N.J. 07960
- 201-539-6l11
.a.,a. a r,
g,.Z., Public Utilities Corporation oenersi 4
1 January 20, 1975 Mr. James P. O'Reilly, Director l
Directorate of Regulatory Operations, Region 1 United States Atomic Energy Commission 631 Park Avenue King of Prussia, Pennsylvania 19406
Subject:
Oyster Creek Station Docket No. 50-219 4
I RO Inspection Report No. 50-219/74-18 This letter is in reply to your letter of December 26, 1974 to Mr. Ivan R. Finfrock regarding the inspection conducted by Mr. Greenman on i
November 19-22, 1974.
In response to the apparent violation of Technical Specification 3.3.C.1, listed as Item 1 of Enclosure 1, we wish to advise you of the i
following:
As noted in Details 6.b, a review of two recirculation pump suction temperature recorder traces yicided temperature changes of 110*F and 120*F for a measured one hour interval following the reactor scram on September 25, 1974. The temperature changes determined from wide range reactor pressure recorder data are considered to be much more significant, however, since reactor pressure yelds a more accurato indication of reactor coolant temperature.
A cooldown of 104*F was determined for the one hour period in question when steam tables were used to convert the wide range reactor pressure recorder data.
In addition, a 99'F/ hour cooldown rate was determined for this time interval when the wide range reactor pressure recorder data was converted with the saturation temperature curve utilized by the reactor operators.
In ' view of this discrepancy, it is extremely difficult to state whether or not the 100*F/ hour limit was, in fact, exceeded, llowever, it is clear that the cool-down rate for the one hour period in question was very close to the limit.
In order to preclude any future instauces of questionably high heatup or cooldown rates, reactor operators have been instructed to plot reactor heatups and cooldowns on special data sheets which graphically t
0
\\
9604230268 960213 PDR FOIA DEKOK95-258 PDR e
w
-an m-arer
i
... January 20, 1975 Mr. O'Reilly It is felt that these new re-indicate the limits for heatup and cooldown.
- quirements will further ensure compliance with Technical Specification 3.3.C.,1.
truly yours, s
Donald A. Ross Manager, Generating Stations-Nuclear es 0