Notice of Violation from Insp on 751117-21.Violation Noted: Work Completed W/O Required Design Review & Written SE or Formalized Work Authorization on or About 751101
ML20107F060
Person / Time
Site: Oyster Creek
Issue date: 12/24/1975
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18039A986 List: ... further results
References
FOIA-95-258 50-219-75-26, NUDOCS 9604220207
Download: ML20107F060 (2)


Text

--

e AFFENDIX A i

NOTICE OF VIDIATION l

Jersey Central Power and Light Company Madison Avenue at Punch Bowl Road Morristown, New Jersey 07960 Docket No. 50-219 License No. DPR-16 4

Based on the results of an NRC inspection conducted on November 17-21, l

i 1975, it appears that certain of your activities were not coeducted in full compliance with conditicas of your license as indicated below:

A.

Contrary to 10 CFR 50.59, " Changes, Tests and Experissets,"

i 10 CFR 50, Appendix B, Criterion V, " Instructions, Procedures and Drawings," the Operational Quality Assurance Plan, Section Y j

and reference Procedure No. 105, "Maint===are Repair and 1

l Modification control," and/or Procedure No. 2006 "Modificat3da, Neuroutine Maintenance and Repair," two (2) penetrations providing for cable runs servicing computer banks were drilled adjacent to I

the reactor control room and into the cable spreading room, a i

vital area. This work was completed without required design review and written safety evaluation or formalized work author-ization on or about November 1, 1975.

l This is an infraction.

1 B.

Contrary to Technical Specification 6.2.A.1 and 6.2.0 and Operating

' pg Procedure No. 304, Revision 0 issued January 22, 1975, Standby Liquid Control valve V-19-24 was observed on November 20, 1975 l

not locked as required and was in addition verified by the cog-nizant shift foreman to be in the open position whereas procedure

{

304 requires the referenced valve to be closed and locked.

We note that corrective action was taken in that the valve was restored to its proper position and locked, and a revised valve i

lineup checklist was completed November 20, 1975.

e i

This is an infraction.

4 k

4 4

t i

I a

9604220207 960213 PDR FOIA DEKOK95-258 PDR

j

.- 2--

i C.

Contrary to 10 CPR 50, Appendix B, Criterion 11 " Quality Assurance 3

Program," and Criterion V, " Instructions, Procedures and Drawings,"

the implementing provisions of the Oyster Creek Operational Quality 4

i - -

1 Assurance Plan,Section II, (Raference JCP41 letter to Division of Reactor Licensing dated May 2, 1974) and ANSI M45.2.3-1973 Section i'

3.2.3 "Pire Protection and Prevention," fire watches had not been specified during and immediately following welding operations.

l Additionally, procedures do not specifically address the usage and control of combustible materials or special work controls to be effected during welding, nor are provisions specified to provide i

portable or installed fire suppression equipment in work areas where welding or'other ignition processes are conducted.

This is an infraction.

,i Other items of noncompliance identified through your internal audit program and which were reported in a timely manner and corrected, or corrective action was initiated, are set out in the attached inspection report. No additional information is needed for these items at this time.

i i

,:iin-I i