yr DEC 2 41975 l
Jersey Central Power and Light Company License No. DPR'16 (m
Attenties: Mr. Ivsa R. Fiafroek Jr.,
Inspection No. 75-26
- 7g Vise President Docket No. 50-219
~ i' Madison Avenue at Punch Bowl Road Morristown, KJ 07960 Gentlemen 1
This refers to the inspection conducted by Mr. R. Greemsen of this offies on November 17-21, 1975 at Oyster Creek Nuclear Generating Station, Forked River, New Jersey of activities authorised by NRC License No. DPR-16 and to the discussions of our findings held by Mr. Greenman with Mr. Carroll 1
and others of your staff at the comelusion of the inspection, and to a i
I subsequent telephone discussion between Mr. Gr - a and Mr. Ross on Desember 15, 1975.
i Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this 4
2 meter. Within these areas, the inspection consisted of selective esaminations of procedures and representative records, interviews with personnel, and observations by the inspector.
4 Based on the resulte of this inspection, it appears that certain of your activities were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.
These items of noncompliance have been categorised into the levels as described in our correspondence to 3
you dated December 31, 1974. This notice is sent to you pursuant to the provfsions of section 2.201 of the NRC's " Rules of Practice",
Part 2 Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within twenty (20) days of your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2) corrective steps which will be taken to avoid further items of noncompliance; and (3) the date when full compliance will be achieved.
l As indicated in Appendix A, we note that you have completed corrective action concerning Item No. B, consequently in your reply you need only address corrective steps which will be taken to avoid further items of noncompliance.
WPC
{M'
[
Gree n
Caphton Haynes Ga I Car.sgn O'
M
- j P
12/18/75 g@M M
j 7g
[
u.
Ql 9604220190 960213 PDR FOIA DEKOK95-258 PDR
. i i
In accordance with Section 2.790 of the NBC's " Rules of Practice", Part
.,c 2, Title 10, Code of Federal Regulations, a copy of this letter and the
+
anelaeares will be placed in the NRC's Public Document Room..If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identifiod in the application is contained in a separate part of the document. If we do not hear from you in this regard within the speci-i fled period, the report will be placed in the Public Document Rpon.
j l
4 Should you have any questions concerning this inspection, we will be i
pleased to discuss them with you.
l Sincerely, Robert T. Carlson, Chief j,
Reactor Construction and Engineering hq Support Branch Reclosures 1.
Appendix A, Notice of Violation 2.
Region I Inspection Report No. 50-219/75-26 cca J. T. Carroll, Station Superintendent A. Z. Roisman, Counsel for Citizens Committee for Protection of the Environment (Without Report) bcci j
IE Mail & Files (For Appropriate Distribution)
]
REG:I Reading Room Region Directors (II, III, IV) (Report Only)
State of New Jersey
+
i A. Z. Roisman, Counsel for Citizens Committee for
- r Protection of the Environment f
?