i NAY 2 1975 Memo to File i
Thru D. L. Caphton, Senior Reactor Inspector-Reactor Operations Branch I
l OfSTER CREEK CONTROL ROD DRIVE InffERFERENCE WITR OFERATING SOURCE j
J. T. Carroll, Station Superintendent, santacted as at about 11:00 a.m.,
May 1,1975, to discuss a problem regarding a brohta operating 4
soures at.ieore location 16-41. While-making control rod drive interference checks, it was disclosed that the referenced source holder had broken off.and pieces were located in the guide tube.
Ac -Carroll described it, ens large pinee was hanging at an angle that precluded removal. Control rod blade'14-43 and the four fuel bundles in the 4tffected call were removed to facilitate access to I
the source. Subsequent attempts at retrieving indicated that fuel bundles located on the corners of the empty cell were preventing d
removal.
The remainder of the conversation involved Oyster Creek's intent l'
to request a temporary Technical Specification change to permit grapple useage for withdrawal of three additional fuel bundles.
Grapple ussage is precluded with a control rod withdrawn. This l
matter was discussed with OIEtHQ (Dreher and Seyfrit) and I then informed Walt Paulson, the RL Project Manager, of the problem.
\\
I was subsequently informed that the cource was successfully removed after repeated attempts and that no action would be requested from licensing.
I intend to review this area during the next routine inspection.
j i
)
Edward C. Greenman, Reactor Inspector Raastor OperaRdeas Branch cci J. P. O'Reilly E. J. Brunner D. L. Capheon l