Forwards Tables I & II Providing Data by Listing Insp Dates for Snubbers in Drywell & Reactor Bldg Since Jul 1974
ML20107D616
Person / Time
Site: Oyster Creek
Issue date: 10/20/1975
From: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
To: Lear G
Office of Nuclear Reactor Regulation
Shared Package
ML18039A986 List: ... further results
References
FOIA-95-258 NUDOCS 9604180384
Download: ML20107D616 (4)


Text

~(

r#T f

[

Jersey Central Power & Light Company %(J MADISON AVENUE AT PUNCH BOWL RO AD

  • MORRISTOWN, N.J.07960
  • 201539 61

.a a.a m y g, Puthe Utilities Corporation

- seneret

,,m.

October 20, 197S jdD-75-007

,,,i*

Mr. George Lear, Chief

/xC 4fh Operating Reactors Branch #3

/

\\

Division of Reactor Licensing fg.

~

, /)Da gC i.

United States Nuclear Regulatory Commission l

D

^ /-8 s/

Washington, DC 20555 N[A

/

Dear Mr. Lear:

\\

q)

Subject:

Oyster Creek-Nuc+ ear Generating Station

' ;.. if,\\,

Docket No.-50-219 J HydraulicTeTs~mic Restraint Inspection Data In Support of Proposed Technical I

Specification Change No. 38 I submitted to you Proposed Technical Speci-On September 12, 1975, fication Change No. 38, which proposed Limiting Conditions for Operation and Surveillance Requirements for the hydraulic seismic restraints (snubbers) at the Oyster Creek Nuclear Generating Station. The proposal was consistent with the model specifications included in your letter of July 8,1975, except for requests that a twelve-month inspection interval be assumed for the initial inspection and that the requirement that the initial inspection be within six-We based months from the date of issuance of the specifications be waived.

these requests upon the extensive surveillance and analyses of the snubbers at the Oyster Creek Station (

Reference:

Our September 12, 1975 submittal).

submittal, your staff indicated Subsequent to our September 12, 1975 that an initial twelve-month inspection period may be assumed if appropriate The attached Tables I and II provide these data by data were documented.

listing the inspection dates for the snubbers in the drywell and reactorTh building since July, 1974.

are sixty-five Bergen-Patterson Type liSSA-10 and twenty-five Grinnel type onh the primary containment piping and ninety.Bergen-Patterson Type HSSA-10 on t e reactor building piping.

No inoperable snubbers were found during these inspections over the I

Some snubbers were replaced for various reasons, but past fifteen months.

Since these data show fifteen months those replaced were not inoperable.

of service without failure, we request that the initial assumed twelve-month interval be allowed.

D bN r o-

/

/

d 9604180384 960213 PDR FOIA DEKOK95-258 PDR 1

7;

y g'

Mr. Georgs Lest.

Paga II

- a These data also show justification for, waiver of the initial inspec-tion within six months from issuance of the specifications.

We, therefore, request that an inspection performed during the six months prior to the issuance of the specification be credited as the initial inspection.

If no such inspection has been performed, we will inspect the-drywell snubbers

.the next time the drywell must be entered for reasons other than snubber inspection, and the reactor building snubbers will be inspected within six months from issuance of the specifications.

This inspection schedule would supersede the schedule prescribed in,my letter of Febrpa,ry 7,1975 to Mr. Karl.Goller of the NRC.

Very tru19 yours,

{}

hlYl I

- # Ivan R. Finfrocky Jr.

Vice Preside'nt pk Attachments 1

i b

3 e

e 4

?

4 E

e d

a e

I

' j eo.-. o..

i TABLE I DRYWELL INSPECTIONS

  • 4.

Inspection Date July,.1974 October,1974 November, 1974 February, 1975 April, 1975 May, 1975

)

June, 1975 September, 1975

  • All of the snubbers replaced following the inspection were stroke tested satisfactorily in their as-found condition, i.e., no failed i

snubbers since July,1974.

1

)

4 4

S e

2 e

m n-

w l

s-

~

TABLE II REACM R BUILDING INSPECTIONS

  • Inspection Date July, 1974 August, 1974 September, 1974 October, 1974 November, 1974 December, 1974 January, 1975

' February, 1975

\\

June, 1975:

July, 1975

\\

l August, 1975 September, 1975

  • All of the snubbers replaced after the inspections were determined to be operable by'either fluid level or stroke testing, i.e., no failed snubbers since July,1974.

t i