ML20107D608

From kanterella
Jump to navigation Jump to search
Advises That Sanction Proposed by Region for Util Changed from Civil Penalty to Nov,Based on Listed Reasons
ML20107D608
Person / Time
Site: Oyster Creek
Issue date: 10/21/1975
From: Ellis W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Snyder G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18039A986 List: ... further results
References
FOIA-95-258 NUDOCS 9604180378
Download: ML20107D608 (2)


Text

.. -.

}.

g

.a y,y e

  1. UNITdD STATES

,)

NUCLEAR REGULATORY COMMISSION

,WAStilNGToN D..C. 20055

.DCT. 2.119.75 f

TO: - G$ry Snyder

, Enforcement Coordinator, Region I

SUBJECT:

CHANCE IN ENFORCEMENT SANCTION' LICENSEE: JE2SEY CEITPRiL F0ER /dQ LIGHT COMPldPI The sanction prop (osed by the Region for the subject licensee was

) Notice of Violation'

( x) NoticeofViolation) changed from a '< (x ) Civil Penalty 1

to a

<(

) Civil Penalty 4

( ) Order

( ')

Order for the following-reasons:

1.

(' ) The case does not involve an imediate-health, safety, public interest, or comon defense and security consideration.

2.

( ) The case does not meet the folloying criteria for the proposed sanc:-fon:

3.

( ) *fhe case does meet the following criteria for the sanction imposed:

4.

(x )' The case does not have sufficient' action points to support the proposed sanction.

^

5.

( ) The case has sufficient

' action. points to support the sanction selected.

6.

( ) Adequate Regional action (Enforcement conferences, Im ediate Action Letters, etc.) was (was not) initiated to warrant the sanction (taken, proposed).

l 7.

( )

Items of noncompliance were not supported by facts.

1

( x). A 'QA^ breakdown xtss (vas notl)liance appear to.the following 8.

)

established for Most of the iter.c of. noncoup ce procedural an:

.not subatantive in nhture. Fct exsupo, sc: e of.no proce ure-s i

w ere not properly reviewed nr.a apprcyca cut :nera 10 nc innc_ :g;n that the procedures were ceficient or contricatea to an incluent s

with health and safety consideraticns.

Ae tio9%,

u h

At$)).

be.s16 l

.s 9604180378 960213 PDR FOIA

-DEKOK95-258 PDR J

o:

4

^

2 f

()

o oct z iM

9.. () Other reasons as follows:

y5%) f&2,'

W. P. Ellis, Enforcement Specialist Field Coordination and Enforcement r.

Office of Inspection and Enforcemens cc: DF0 Chief, FS&EB Regional Director

'S e

0 0

l 1

1 3

1 e

4 3

l

\\

f i

O I

e.

e t

  • 4 s

=**m,

.i.

...... * +,..

w

-~ ~. j l

,