1 UNITED STATES AT0t!IC ENERGY COMMISSION DOCKET N0'. 50-219 JERSEY CENTRAL POWER AND LIGHT COMPANY f
ACCEPTANCE CRITERIA FOR E:IERGENCY CORE COOLING SYSTriS FOR LIGHT WATER-COOLED NUCLLAR POWER REACTORS NOTICE OF REQOEST FOR EXTENSION IN SUDMITTING EVALUATIONS i
As required by 10 CFR E 50.46(a), certain licensees and applicants must submit, consistent with 10 CFR I 50.46(a)(2)(ii), an evaluation of the performance of emergency core cooling systems (ECCS) by August 5,1974, unless an extension thereto has been obtained from the Director of Regulation pursuant to I 50.46(a)(2)(iii). As required by B 50.46(a)(2)(111),
notice is hereby given that the Director of Regulation has received and is condciering a request. from the Jersey Central Pouer cnd Light Ccs; ny (JC"L)
'(the licensee) for a twenty (20) week extencion of the submittal date for the i
Oyster Creek ECCS evaluation. The request for extension is accompanied by l
affidavits outlining the reasons why the evaluation is not complete and the l
minimum time necessary to complete it.
The licensee is authorized by Facility Operating License No. DPR-16 to cperate the Oyster Creek plant located in Lacey Township, Ocean County, New Jersey, at steady-state power levels up to 1930 MWt.
1 Jersey Central Power and Light Company states that the reactor vendor, General Electric Company (GE), will provide the evaluations to the Jersey Central Power and Light Company no earlier than September 30, 1974, and that,
)
[
upon receipt of the completed GE ECCS evaluation, it must provide' EXXON Nuclear Company (EXXON) the GE blowdown model for EXXON to evaluate the Performance of the EXXON. fuel, which requires 6 weeks.
The licensee states 9604180091 960213 PDR FOIA t
--~,l DEKOK95-258 PDR
un '
~
y s[,
Q
- 5 o
a 2-
-e also that it must prepare proposed Technical Specification revisions; the Plant Operations Review Committee is required to review and approve proposed Technical Specification' revisions; and the company's General Office Review e
It Board is required to review proposed Technical Specification revisions. The l'
licensee states that until completion-of the reviews of both the GE and Exxon analyses, it cannot provide a comprehensive evaluation.
The extension may be granted upon a finding that' good cause has been shown for granting of the extension. The Director of Regulation will consider and issue a determination with respect to the request for extension as required by 10 CFR 50.46(a)(2)(iii).
In that connection, the Director of Regulation invites the. submission of views and comments by any interested persons.
Such views and comments should be suomitted in writ:ing, addressed to the Director of Licensing, USAEC - Regulation, Washington, D. C.
20545, not later than J
JUL 2p1974, A copy of the request for extension dated June 19, 1974, and related correspondence and documents are available for public inspection at the Commission's Public Document Room, 1717 H Street, N. W., Washington, D.
C.,
i and at the Ocean County Library, 15 Hooper Avenue Toms River, New Jersey day of. c4b f.
)
ted at Bethesda, Maryland, this FOR THE ATOMIC ENERGY COMMISSION 1
1 4
9
~
Lu%
wre Dennis L. Ziemann Chief Operating Reactors Branch #2 Directorate of Licensing q