ML20107C088
Text
-
- v. <e..
i Jersey Central Power & Light Company U MADISON AVENUE AT PUNCH BOWL ROAD
- MORRISTOWN, N. J. 07960
- 201-539-6111
.a =, e va General Public Utilities Corporation enn.
June 7, 1974 Office of Plans 4 Schedules Directorate of Licensing United States Atomic Commission
' Washington, D. C. 20545
Dear Sir:
Subject:
Oyster Creek Station Docket No. 50-219 Monthly Generation Summary In response to your letter of February 18, 1974 to Mr. I. R. Finfrock, Jr., I am enclosing the information for May 1974 which you requested.
Also I wish to correct an error that was reported in the April submittal by our letter dated May 6,1974.
Item 9, " Net Electrical Power Generated", should read 178,260 MWil, resulting in a " Year to Date" total of 1,280,266 MWil and a " Cumulative to Date" total of 16,615,648 MWii.
Very truly yours, j
- { hL,ulcfk -i
. ~L&
'~
Donald A. Ross Manager, Nuclear Generating Stations Cs Enclosure
' Mr. J. P. O'Reilly, Director /
cc:
Directorate of Regulatory Operations, Region I 9604170216 960213 PDR FOIA DEKOK95-258 PDR
]
4
's.
A
-w a
ENCLOSURE A q
i UNIT Oyster Creek #1 DATE June 7,1974 COMPLETED BY.
R. L. Foor, Jr.
' DAILY PLANT PORER OUTPUT t
MONul May 1974
--g AVERAGE DAILY We-net DAY AVERAGE DAILY We-net l
I 1
0 25 0
2 0
26 0
3 0
27 0
4 0
28 0
5 0
29 0
6 O
30 0
7 0
31 0
8 0
9 0
'10 0
.11 0
12 0
13 0
1 14 0
l l
15 0
16 0
i 17 0
18 0
i
+
19 0
20-0 21 0
22 O
s 23
-0 24 0
0 w
y y
_-w-3 u.
o l
.._.._._G.~
UNIT NfeZ
,,,0yster C9 'k #1 DATE June 7, 1974 l
COMPLETED BY R. L. Foor, Jr.
l OPERATING STATUS 1.
REPORTING PERIOD:
0001,740501 TO 2400,740531 GROSS HOURS IN REPORTING PERIOD:
744 2.
CURRENTLY /.WCORIZED PWER LEVEL We.1930 We-NET 620 (summer); 650 (winter) 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY):
4.
PEASONS FOR RESTRIC1:0NS (IF ANY):
THIS CUMULATIVE MONTH YR-TO-DATE TO DATE 5.
HOURS REACTOR WAS CRITICAL......
0 2.158.984 30.376.038 6.
HOURS CENERATOR ON-LINE.
0 2,121.567 29,666.620 7.
CROSS THERMAL POWER GENERATED (Mm).... 0 3,823,489 46,998,950 8.
CROSS ELECTRICAL PWER CENERATED (Mm)...
0 1,325,180 17,234,150 9.
NET ELECTRICAL POWER CENERATED (WH).... -2772 1,277,494 16,612,876
- 10. REACIOR AVAILABILITY FACTOR (1)...... 0.0%
59.6%
78.1%
- 11. PLANT AVAILABILITY FACTOR (2)..
0.0%
58.6%
76.3%
12.
PLANT CAPACITY FACTOR (3)..........
56.9%
73.8%
13.
FORCED OUTAGE RATE (4)......
0 4.8%
5.1%
- 14. SHUTDWNS SCREDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH):
15.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: June 17,1974 16.
PLANTS IN TESI $1ATUS (PRIOR TO COMMERCIAL OPERATION) PIPORT THE FOLLWING:
DATE LAST DATE REASON FOR FORECAST ACHIEVED DIFFEFINCE INITIAL CRITICALIIY INITIAL ELECTP.ICAL POWER CENERATIOM C0KCRCIAL CPER.'. TION (1) RZACTOR AVAILA3ILITY FACTOR = tinUFS REA_CTOR WAS CRITICAL
- 100 GROSS HOURS IN REPO.tTING PERIOD (2) PLANT AVAI. ABILITY ' FACTOR = 110VRS CENERATOR ON-LTNE
- 100 C'lo.35 1100r.S IN nEORTING PERIOD (2) PLANT CAPACITY FACTOR = NET ELLCrnICAL P(Vit't CCNERATED
- 100 CURRENTLY LICENSED POUCR LEVEL
- GROSS Il0URS IN REPORTIUC PERIOD (4) FORCED CUT ACE RATF = Fem'n C'T W "' 'd
- 100
S L*'JtARY :
UNIT NMIE Cyster Creek fI DATE June 7. 1974 CaiPLETED BT R. L. Foor. Jr.
REPORT MC*fIH May 1974 PLANT SHUTD0WN5 TTPE METHOD OF pg F-FORCED DURATION SHUTTING DOWN NO.
DATE S-SQlEDULED (HOURS)
REASON (1)
IHE REACTOR (2)
COMMENTS 3
740501 S
744 C
A Extended Outage (1) REASON:
(2) METHOD:
A-EQUIPMENT FAILURE (EXPLAIN)
A-MANUAL B-MAINT. OR TEST B-MANUAL SCRAM C-REFUELING C-AUTOMATIC SCRRi D-REGULATORT RESTRItT. ION E-OPERATOR TRAINING AND LICENSE EXM41 NATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)
-