Forwards Monthly Generation Summary for 740531
ML20107C088
Person / Time
Site: Oyster Creek
Issue date: 06/07/1974
From: Ross D
JERSEY CENTRAL POWER & LIGHT CO.
To:
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML18039A986 List: ... further results
References
FOIA-95-258 NUDOCS 9604170216
Download: ML20107C088 (4)


Text

-

v. <e..

i Jersey Central Power & Light Company U MADISON AVENUE AT PUNCH BOWL ROAD

  • MORRISTOWN, N. J. 07960
  • 201-539-6111

.a =, e va General Public Utilities Corporation enn.

June 7, 1974 Office of Plans 4 Schedules Directorate of Licensing United States Atomic Commission

' Washington, D. C. 20545

Dear Sir:

Subject:

Oyster Creek Station Docket No. 50-219 Monthly Generation Summary In response to your letter of February 18, 1974 to Mr. I. R. Finfrock, Jr., I am enclosing the information for May 1974 which you requested.

Also I wish to correct an error that was reported in the April submittal by our letter dated May 6,1974.

Item 9, " Net Electrical Power Generated", should read 178,260 MWil, resulting in a " Year to Date" total of 1,280,266 MWil and a " Cumulative to Date" total of 16,615,648 MWii.

Very truly yours, j

{ hL,ulcfk -i

. ~L&

'~

Donald A. Ross Manager, Nuclear Generating Stations Cs Enclosure

' Mr. J. P. O'Reilly, Director /

cc:

Directorate of Regulatory Operations, Region I 9604170216 960213 PDR FOIA DEKOK95-258 PDR

]

4

's.

A

-w a

ENCLOSURE A q

i UNIT Oyster Creek #1 DATE June 7,1974 COMPLETED BY.

R. L. Foor, Jr.

' DAILY PLANT PORER OUTPUT t

MONul May 1974

--g AVERAGE DAILY We-net DAY AVERAGE DAILY We-net l

I 1

0 25 0

2 0

26 0

3 0

27 0

4 0

28 0

5 0

29 0

6 O

30 0

7 0

31 0

8 0

9 0

'10 0

.11 0

12 0

13 0

1 14 0

l l

15 0

16 0

i 17 0

18 0

i

+

19 0

20-0 21 0

22 O

s 23

-0 24 0

0 w

y y

_-w-3 u.

o l

.._.._._G.~

UNIT NfeZ

,,,0yster C9 'k #1 DATE June 7, 1974 l

COMPLETED BY R. L. Foor, Jr.

l OPERATING STATUS 1.

REPORTING PERIOD:

0001,740501 TO 2400,740531 GROSS HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY /.WCORIZED PWER LEVEL We.1930 We-NET 620 (summer); 650 (winter) 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):

4.

PEASONS FOR RESTRIC1:0NS (IF ANY):

THIS CUMULATIVE MONTH YR-TO-DATE TO DATE 5.

HOURS REACTOR WAS CRITICAL......

0 2.158.984 30.376.038 6.

HOURS CENERATOR ON-LINE.

0 2,121.567 29,666.620 7.

CROSS THERMAL POWER GENERATED (Mm).... 0 3,823,489 46,998,950 8.

CROSS ELECTRICAL PWER CENERATED (Mm)...

0 1,325,180 17,234,150 9.

NET ELECTRICAL POWER CENERATED (WH).... -2772 1,277,494 16,612,876

10. REACIOR AVAILABILITY FACTOR (1)...... 0.0%

59.6%

78.1%

11. PLANT AVAILABILITY FACTOR (2)..

0.0%

58.6%

76.3%

12.

PLANT CAPACITY FACTOR (3)..........

56.9%

73.8%

13.

FORCED OUTAGE RATE (4)......

0 4.8%

5.1%

14. SHUTDWNS SCREDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH):

15.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: June 17,1974 16.

PLANTS IN TESI $1ATUS (PRIOR TO COMMERCIAL OPERATION) PIPORT THE FOLLWING:

DATE LAST DATE REASON FOR FORECAST ACHIEVED DIFFEFINCE INITIAL CRITICALIIY INITIAL ELECTP.ICAL POWER CENERATIOM C0KCRCIAL CPER.'. TION (1) RZACTOR AVAILA3ILITY FACTOR = tinUFS REA_CTOR WAS CRITICAL

  • 100 GROSS HOURS IN REPO.tTING PERIOD (2) PLANT AVAI. ABILITY ' FACTOR = 110VRS CENERATOR ON-LTNE
  • 100 C'lo.35 1100r.S IN nEORTING PERIOD (2) PLANT CAPACITY FACTOR = NET ELLCrnICAL P(Vit't CCNERATED
  • 100 CURRENTLY LICENSED POUCR LEVEL
  • GROSS Il0URS IN REPORTIUC PERIOD (4) FORCED CUT ACE RATF = Fem'n C'T W "' 'd
  • 100

S L*'JtARY :

UNIT NMIE Cyster Creek fI DATE June 7. 1974 CaiPLETED BT R. L. Foor. Jr.

REPORT MC*fIH May 1974 PLANT SHUTD0WN5 TTPE METHOD OF pg F-FORCED DURATION SHUTTING DOWN NO.

DATE S-SQlEDULED (HOURS)

REASON (1)

IHE REACTOR (2)

COMMENTS 3

740501 S

744 C

A Extended Outage (1) REASON:

(2) METHOD:

A-EQUIPMENT FAILURE (EXPLAIN)

A-MANUAL B-MAINT. OR TEST B-MANUAL SCRAM C-REFUELING C-AUTOMATIC SCRRi D-REGULATORT RESTRItT. ION E-OPERATOR TRAINING AND LICENSE EXM41 NATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

-