Discusses Special Insp Conducted at Facility on 730213-16 & Provides List of Types of Violations Identified by RO I Inspectors
ML20107B294
Person / Time
Site: Oyster Creek
Issue date: 02/26/1973
From: Caphton D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: James Keppler
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML18039A986 List: ... further results
References
FOIA-95-258 NUDOCS 9604160192
Download: ML20107B294 (2)


Text

I

~

, - 4

.gc-g UNITED STATES

.gt;r q p

h,,

ATOMIC ENERGY COMMISSION T*

DIRECTOR ATE OF RESUL.ATORY OPER ATIONS g

REGION 9 970 SROAD STREET Y,

[

NEWARK. NEW JERSEY 07102 i

FEB 2 61973

'J. G. Keppler, Chief, Reactor Testing & Ope rations Br.

Directorate of Regulatory Operations, HQ.

SPECIAL INSPECTION REGARDING ALLEGATION OF POOR RADIOLOGICAL CONTROL PRACIICES AT OYSTER CREEK, DOCKET No. 50-219*

RO:I' inspectors completed a special inspection at the Oyster Creek BWR f acility during February 13 - 16, 1973. -Although up to 30 violations and/o*. safety items were identified, the inspectors' preliminary conclusions at the facility on February -16,1973 were that no i:nmediate threat to the health and safety of the public appeared to exist.

The Director of Region I personnally contacted the cognizant Jersey Central Power & Light Company Vice President regarding our concerns in thf1 matter on February 14, 1973. RO:I is currently completing an e taluhtion of the violations and plan to meet with the licenset's corporace management on or about March 1,1973 to discuss these matters.

The licensee at the facility began completing some corrective actions during the time of the R0:1 inspection. This was visually observed by our inspectors.

The licensee's corporate level management reported via telephone on February 23, 1973 that approximately 70*/. of the violations had been corrected. We intend to verify the licensee's telephone report during planned RO:I followup inspections at the site.

  • Reference to letter, J. P. O'Reilly to R. H. Engelken, dated February 14, 1973 regarding " Anonymous Allegations - Jersey Central Power & Light Co.,

Oyster Creek Nuclear Generating Station".

I

'9604160192 9602'13 PDR FOIA DEKOK95-258 PDR

e-

?

(,

1 Types of violations identified by RO:I inspectors included:

a.

Failure to properly post (approximately 8) low radiation and (approximately 7) high radiation areas, b.

Failure to properly label (approximately 8) radioactive material containers and/or locations, c.

Excessive radiation levels in unrestricted areas, d.

Failure to make adequate surveys, e.

Failure to provide personnel monitoring, f.

Failure to inform personnel of the occurrence of radioactive materials or radiation levels in a restricted area, g.

Failure to report, within 30 days, exposure to personnel to excessive air concentrations, h.

Violation of Technical Specification requirement 6.2.B.2 relating to radiation control procedures, 1.

Failure to control radiation exposure to one individual within the limits specified by plant procedures.

Types of safety items include:

Failure to establish a radiological protection retraining program for a.

plant personnel, b.

Failure to make dose rate surveys prior to capping high level vaste

drums, Failure of extended radiation work procedures to reflect the existing c.

conditions, covering routine work in the reactor building, d.

Poor radiological housekeeping practices relative to storage and control of radioactive materials.

An inspection report is being prepared covering these matters. The report is being given Regional priority.

j s

D. L. Caphton Senior Reactor Inspector

{

Facility Operations Branch j

)

Issued by facstmile on 2/26/73 j

-