ML20107A285

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 730910-12.Violation Noted: Dept Work Performed on Differential Relays for Startup Transformers at Facility on 730730
ML20107A285
Person / Time
Site: Oyster Creek
Issue date: 10/26/1973
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18039A986 List: ... further results
References
FOIA-95-258 50-219-73-15, NUDOCS 9604120220
Download: ML20107A285 (1)


Text

.- -.

i.e e

i i

i ENCIAstRE l

Description of violations Jersey Central Power and Light Casysay Doekat No. 50-219 j

License No. CFR-16 certain activities under your 11eense sypear to be in violation of AEC I

regulatsses and liomise requir e s.

This syparet violation is een-2 sidered go be of category II severity.

1.

Techateal specificatist 3.7.A.2 states, in part..."That the reactor shall not be made critical unless... switch gaar and both startup transformers are energised to carry power to the station 4160 volt AC buses and carry power to or away from the plant." Further, Technical Specification 6.2.A.4 states, in part..." Detailed written procedures with appro-j priate check-off lists and instructions shall be provided for... preventive or corrective maintenance operations which i

could have an effect on the safety of the reactor."

1 i

contrary to the above, Relay Department work was performed on the differential relays for the startup transformers at the Oyster Creek facility on July 30, 1973, yet ---

a) records indicated both startup transformers were effectively inoperable from July 30 to September 8,1973 due to ingroper settings on the "C" phase differential monitoring relays, and i

the reactor was made critical and operated at power; and 4

b) no detailed written procedures with appropriate check-off lists and instructions existed for the above stated relay work performed.

I 4

4 t

9604120220 960213 PDR FOIA DEKOK95-258 PDR

- -