Discusses 730912 Telcon Between Dl Caphton & D Ross Re Recent Power Outage on 730908.Informs That Jcp&L Recognize Seriousness of Incident & Have Proceeded to Take Measures to Further Improve Reliability of DGs
ML20107A206
Person / Time
Site: Oyster Creek
Issue date: 09/12/1973
From: Caphton D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Ross D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18039A986 List: ... further results
References
FOIA-95-258 NUDOCS 9604120184
Download: ML20107A206 (2)


Text

j jl '*

f-'

j~

UNITED sVATES ATOMIC ENERGY COMMISSION d

oenscvonats or naeus.avony oesnatio es ns. o.

' 'I MieSRO*0 SPRsET NSWAMMrNEW N a@P4es Memorandum to File September 12, 1973 TELEPHONE CALL TO MR. DON ROSS, MANAGER OF NUCLEAR GENERATOR STATIONS, JERSEY CENTRAL POWER & LIGHT COMPANY - DOCKET NO. 50-219

~

D. L. Caphton stated at about 8:20 a.m. - 9/12/73 - to Mr. Don Ross that he wished to convey his large concerns in the matter of the recent power outage that occurred on 9/8/73, and which was reported an an Abnormal Occurrence.

It was further stated to Mr. Ross that the fact that the diesel generators were the only power source remaining at times during this incident, and in light of the number of prior problems with diesel generators failing to start, or inoperative diesel generators; this entire matter was considered to be very, very serious.

Mr. Ross stated that he recognized the seriousness of the incident, and that Jersey Central had already proceeded to take measures to further improve the reliability of the diesel generators. He stated that at this very moment their GORB, off-site Safety Review Committee, was holding a meeting (note, this was-a scheduled meeting), and discussing. ways in which to improve the re-liability and dependability cf the diesel generators. It was stated to Mr. Ross that I personally consider 00-1 very, very lucky that they had two diesel generators operating at the time of this incident, par-ticularly in view of the fact that the generators were jockeyed on an off-line and subjected to fault tripouts; the fact that both generators did not fault at the same time (except for one instance of about 15 seconds) during this specific incident was a fortuitous event. Mr. Ross stated that he did not consider it luck -- that there were other factors 1

involved.

D. L. Caphton further stated to Mr. Ross that he was very, very concerned in the matter of the differential relay taps being connected incorrently by out of plant relay people.

Mr. Ross stated that action was being taken to cor-rect this situation. He further added that he would suspect that other plants had this same situation of using outside relay people. It was stated that this was a clear example of the lack of a Quality Assurance & Control Program at this plant.

D. L.Caphton stated that he was very much concerned that this facility appeared to be not meeting their requirements under the law of 10 CFR 50, Appendix B, QA criteria. It was further stated that these statements of opinion were based upon my visit to their plant two weeks ago, plus information that I am currently receiving from our inspector who is at the plant today. Mr. Ross spoke of having a staff now actively working on h

9604120184 960213 PDR FOIA DEKOK95-258 PDR

e

{

(m,i -

d the QA Program and thought that they would have a program by next year.

D. L. Caphton stated to NW. Ross that the implementation of a QA Program was needed today and should be available within days.

Mr. Ross stated that-he would make a memorandum of Mr. Caphton's cr=ments and see to it that his management receives a copy of it, plus the personnel working on the QA Pro-gram. Mr. Ross added he reckoned that he would be hearing from us as a result of the inspection at their facility. I stated that this would be n fact.

The conversations with Mr. Ross were congenial and friendly; however, businesslike. Mr. Ross seemed to be responsive to the concerns raised..

He also subsequently learned from our inspector at the site that the plant superintendent had been subsequently informed about this telecon.

,/') n 4 e

t D. L. Cap ton, Senior Reactor Inspector, BWR cc: James P. O'Reilly R. T. Carlson Edward G. Greenman P. Nelson M. Howard j