ML20106J896
Text
.
'O 9-%i-73 c
C 631 Park Avenue King of Prussia, Pennsylvania 19406 D. L. Caphton, Senior Reactor inspector, Facility Operations Branch Directorate of Regulatory Operations, Region I RO Inspection Report No. 50-219/73-11 Jersey Central Power & Light Company Oyster Creek It appears to ine that Jersey Central has made great strides in their management controls at the site. In addition, there seems to be more of a desire to keep us informed of unusual events.
The requested information was obtained or action initiated, as appropriate for the following items:
1 Request Information or Action MRS 1/31/73 Procedure written but not reviewed by PORC (Proprietary)
MRS 3/5/73 Very fine pitting observed in the discharge area of the cylinder (P 19)
HRS 3/6/73 Liquid poison level is measured by float.
Letter Knuth to llave had occasion of rods failing to fully Regional Director -
insert; however, evaluation indicated 5/24/73 seal leakage.
FACF RO:I/73-8 The problem with the CORB Minutes was discussed with Mr. Don Ross, Manager, Nucicar Generating Stations.
I was assured that copies of
" draft" and " official" minutes would be placed promptly in a file.
EW at the site so that they would be available for our review.
p;p According to Mr. Carroll, Jersey Central is actively interviewing for a Radiation Protection Supervisor, but has not had success in locating a certified h. P.
OFTICE >
Greenman:eby so-- >
- p..
[
OATE >
Forse ASC-Sl0 (Rev,943) AECM 0240 9604120054 960213 PDR FOIA DEKOK95-258 PDR
,4 O
.: e i 1 i
Aaserding to Mr. Carroll, Oyster Creek has a handwritten procedure for a i,od threat." However, this preendure itsu not been reviewed by the j'
PORC. He plans to present the procedure to PORC, but maintain a very limited distribution.
i s
a i
j F. S. Centre 11 Beastor Inspector Faatlity Operations Branch 4
i W4:
1 i
1 l$
J l
a i
?
4 4
9 f
4 I.
. _ _