~\\o6lDO 3o'J-
.~S~ o)(.,
DISJRIB!!j~:
c:::.r>QC k e t Fi _
NRC PDR L PDR TERA Docket No. 50-312 Mr. J. J. Mattimoe NSIC ORB#4 Rdg DEisenhut DELO IE-3 ACRS-10 AEOD MPadovan Rlngram Assistant General Manager and Chief Engineer Sacramento Municipal Utility District 6201 S Street P. o. Box 15830 Sacramento, California 95813 Gray Fi 1 e AS LAB RDiggs CMi 1 es AS LAB BScharf JWetmore GDeegan OGC
SUBJECT:
RE:
EMVIRONt-1ENTAL QUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT
\\...._,.....At f.-. Iv pt* 910 G, IOO!Otl Rancho Seco Nuclear Generating Station - Operating license Mo. DPR-54 Reference (a) - Order for Modi f i ca ti on of license Concerning the En vi ronmenta l Qualification of Safety-Related Electrical Equip1nent dated October 24, 1980.
Dear Mr. Mattimoe:
-~-~-'~
This letter transmits the Safety Evaluation for the Environmental Qualification of Safety-Related Electrical Equipment at your facility. This evaluation i-Jas
-based on your submittals dated r1arch 3, May 5, October 31 t 1980 and January 13, 1931.
Our letter of March 17, 1981, which fon-1arded our preliminary results, indicated that an item-by-item reevaluation would be required at a later date.
This Safety Evaluation identifies the specific information required by the staff and the actions, on your part, necessary to comply with Reference (a).
t,Je request that you provide the information identified in Sections 3 and 4 of this Safety Evaluation to us within 90 days. of receipt of our letter.
This Safety Evaluation addresses only the safety-related electrical equipment exposed to a harsh environment resulting from an accident (i.e., the IEB 79-018 review).
Reference (a) requires that all safety-related electrical equipment be qualified by June 30, 1982.
The !
1!RC review effort for the equipme*nt in mild environments will be addressed by separa.te correspo~dence.
Your response may present alternatives to the staff positions in the evaluation.
The staff will consider alternative approaches if these methods are within fi~
the DOR Guidelines or NUREG-0588, as appropriate. For example, an acceptable A
alternative to the NRC staff's temm~rature criterion used for the servi co conditions (i.e. Section 3.3) must base that service condition on the FSAR analysis or other NRC approved analysis, provided that the specific analysis, together ~*Ji th reference to the previous HRC acceptance of that analysis, accompanies the 90 day response.
In addition, some of the information in the Safety Evaluation may require cl ari fi ca ti on.
Contact your project manager for A.ssistr.nce in these matters.
- ~
- ~
(..;::-;' ' '
Mr. J. It remains your responsibility to assure that the qualification dea.dline is met for all safety-related electrical equipment.
The staff's review of your response to this letter should not delay any action v1hich is required in order to meet the deadline.
Enclosures:
- l.
- 2.
TER cc w/o enclosures:
See next page Sincerely, John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing su:::::: :~~
- ~W=:
DATE~ ** ~(
1
.~.(.~~********* Jl)'t~*-*~**
NRG FORM 318 (10-80) NRG; -ff:,~
.f\\
-L-0-F_F_I C-IA-L--L.R_E_C_O_R_D __
C_,_O_P_Y ___
_..__U_SG_P_0:-19-81---33-5--960
~10R1nfft....
~-
~
~i I
~!
Mr. J. It remains your responsibility to assure that the qualification deadline is met for al 1 safety-related electrical equipment.
The staff's review of your response to this letter should not delay any action which is required in order to meet the deadline.
Enclosures:
- 1.
- 2.
TER cc w/enclosures:
See next page.
- See previous 318 for concurrences.
Sincerely, John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing
'\\
I ; \\\\
i '\\..
'. \\
\\
. <\\
\\.
\\
~
\\
\\
\\
. \\
OFFICE. ORB#4: DL '
ORB#4: DL C-ORB#4: DL JRB#2: DL i
\\
- .... *...... ft/"... * *.. *........ *...... *.............................................,....................... !...................................... 1..* L....
. SURNAME.~-~~.~:.?.~........ ~~?.?.9~Y.~~(~~~.. :.. ~?.~?.1?:~........ ~~4.!.l.~.~~~.~-~..... :............ ~........ :.......... ;....,..... ;....... ;......\\~..
DATE~. 5/;}1/81 5/19/81*
. 5/21(81 5/20/81
'\\.L\\!~:;
..................... *********************l ********************* *********************~*~*********************' *****************************\\*********~~***.
- NRCFORM-31s1rn1801NRCMe24o OFFICIAL RE.CO-RD COPY
~usi3i>o19ao-32~.'B24
- \\.\\...._
- e.
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 May 29, 1981 Docket No. 50-312 Mr. J. J. Mattimoe Assistant General Manager and Chief Engineer Sacramento Municipal Utility District 6201 S Street P.O. Box 15830 Sacramento, California 95813
SUBJECT:
ENVIRONMENTAL OUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT RE:
Rancho Seco Nuclear Generating Station - Operating License No. DPR-54 Reference (a) - Order for Modification of License Concerning the Environmental Qualification of Safety-Related Electrical Equipment dated October 24, 1980.
Dear Mr. Mattimoe:
This letter transmits the Safety Evaluation for tne Environmental Qualification
. of Safety:..Related Electrical Equipment at your facility.
This evaluation was based on your subr:iittals dated.March 3, May 5, October 31, 1980 and January.13, 1981. Our letter of Marcp 17, 1981, which for.wa*rded our preliminary results, indicated that an item-by-item reevaluation would be required at a later date.
This Safety Evaluation identifies the specific informa.tion required by the staff and the actions, on your part, necessary to comply with Reference (a).
We request that you provide the information identified in Sections 3 and 4 of this Safety Evaluation to us within 90 days of receipt of our lette.r.
This Safety Evaluation addresses only the safety-related electrical equipment exposed to a harsh environment resulting from an accident (i.e., the IEB 79-018 revie1>1).
Reference (a) requires that all safety-related electrical equipment be qualified by June 30, 1982.
The NRC review effort for the equipment in mild environments will be addressed by separate correspondence.
Your response may present alternatives to the staff positions in the evaluation.
The staff will consider alternative approaches if these methods are within the DOR Guidelines or NUREG-0588, as appropriate.
For example, an acceptable alternative to the NRG staff 1 s temperature criterion used for the service conditions (i.e. Section 3.3) must base that service condition on the FSAR analysis or other NRC approved analysis, provided that the specific analysis, together with reference to the previous NRC acceptance of that analysis, accompanies the 90 day response.
In addition, some of the information in the Safety Evaluation may require clarification. Contact your project manager for assistance in these matters.
Mr. J. It remains your responsibility tb assure that the qualification deadline is met -for all safety-related electrical equipment.
The staff's r.eview of your response to this letter should not delaj any action which is required in order to meet the deadline.
Enclosures:
'-'i*
- 1.
- 2.
TER cc w/enclosures:
See next page
/
Sincerely, *
.. ~q;,M ohra
. Stolz, Chief
~-
p 1ating Reactors Branch #4 Division of Licensing
Sacramento Municipal Utility District cc w/enclosure(s):
David S. Kaplan, Secretary and General Counsel 6201 S Street P. 0. Box 15830 Sacramento, California 95813 Sacramento County Board of Supervisors 827 7th Street, Room 424 Sacramento, California 95814 Business and Municipal Department Sacramento City-County Library 828 I Street Sacramento, California 95814 U. S. Environmehtal Protection Agency Region IX Office ATTN:
EIS COORDINATOR 215 Fremont Street San Francisco, California 94111 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 420, 7735 Old Georgetown Road Bethesda, Maryl and 20014-Thomas Baxter, Esq.
Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D. C.
20036 Herbert H. Brown, Esq.
Lawrence Coe Lanpher, Esq.
Hill, Christopher and Phillips, P.C.
1900 M Street, N.W.
Washington, D. C.
20036 He 1 en Hubba rd P. 0. *Box 63 Sunol, California 94586 Rancho Seco, Docket No. 50-312 Christopher Ellison, Esq.
Dian Grueuich, Esq.
California Energy Commission 1111 Ho1t1e Avenue Sacramento, California 95825 Ms. Eleanor Schwartz California State Office 600 Pennsylvania Avenue, S.E., Rm. 201 Washington, D. C.
20003 Docketing and Service Section Office of the Secretary U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Resident.Inspector/Rancho Seco cf o U. S. N
- R. C.
14410 Twin Cities Road Herald, CA 95638 Dr. Richard f. Cole
.t\\tomic Safetv & Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Mr.
Frederi~k J~ Shon Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Elizabeth S. Bowers, Esq.
Chai rrnan, Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Mr. Michael R. Eaton Energy Issues Coordinator Sierra Club Legislative Office 1107 9th Street, Room 1020 Sacramento, California 95814 Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D. C.
20555
r,'J
- Sacramento Municipal Utility District Atomic Safety and Licensing Appeal Board Panel U.S. Nuclear Regulatory Commission Washington, D. C.
20555 cc w/enclosure(s) and incoming dtd.:
California Department of Health ATTN:
Chief, Environmental Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, California 95814