Rev 2 to 22332-C, Temp Switch Calibr
ML20092H819
Person / Time
Site: Vogtle  
Issue date: 08/30/1989
From:
GEORGIA POWER CO.
To:
Shared Package
ML20092F288 List: ... further results
References
CON-IIT05-110-000D-90, CON-IIT5-110-D-90, RTR-NUREG-1410 22332-C, NUDOCS 9202210371
Download: ML20092H819 (10)


Text

,

7 y;& ~ J.

{

nucain enneces

.a 2

5 p y.fj un,g C0tMON-Georgia PDWer Peepg,9 MAh UA, SET j

N O.

I-i TEMPERATURE SWITCH CALIBRATION

f ; 6 jN Ceg

~

[(

\\\\

!j$l V

j Vl

'\\ S

\\/ -

l-

/ h \\..!,I 3

n, 4

e' s

e

.~

9202210371 920116 PDR ADOCK 05000424-S.

PDR _

nmoi.

m

(

VEGP 22332-C 2

2 of 10 1.0 PURPOSE jf

(/

The purpose of this procedure is to provide instructions for Calibration of a Temperature Switch.

2.0 PRECAflTIONS AND LIMITATIONS 2.1 All steps in this procedure are to be performed in sequence except as noted.

()

2.2 Performance of procedure step, as identified by a double asterisk (*/*),

shall be initialed on

~

" Checklist" except when recording data on Data Sheet.()

2.3 The instrument may be located in a radiation area, service a contaminated process fluid, or be contaminated.

If so, follow instructions on " Radiation Work Permit".

()

2.4 For Safety-Related Systems, an Independent Restoration Verification shall be performed after completion of Test / Calibration and initialed in " Restoration Veri.fication" section of " Checklist".

()

2.5 Any calculations necessary for the performance of this proceoure shall be shown on " Calculation Sheet".

()

(_))

i 2.6 Ensure that each lead (wire) to be lifted is marked with a completed and installed jumper and lif ted wire tag.

Instead of " Control No.", the " Procedure No."

should be identified on the tag.

()

2.7 If this procedure is completed and temporary jumper (s) must remain installed and/or lifted wire (s) cannot be reconnected, a Jumper and Lifted Wire Clearance must be obtained per Procedure 00306-C, " Temporary Jumper And Lifted Wire Control".

()

2.8 Minimize entry of foreign materials or dirt into the working parts of the instrument.

()

2.9 If, during performance of this procedure, any of the following occur, immediately notify I&C Foreman.

2.9.1 Any perscnnel error, procedure inadecuacy, or malfunction is identified which coulc, prevent fulfillment of " Acceptance Criteria".

()

2.9.2 Any test exceeds spe.cified limits.

()

OV i

i

    • )4J%

q y

VEGP 22332-C 2

.1 o f 10 2.10 This procedure may be performed in any plant i

f-operational mode.

()

l 3.0 PREREQUISITES OR INITIAL CONDITIONS 3.1 Notify Shift Saservisor, or designee, of work to be

  • /*

performed and o'atain signature authorization.

[]

3.2 Notify Reactor Operator (RO) that instruments

  • /*

associated with switch may be erratic or inoperable during performance of this procedure and obtain RO t

signature.

()

.._7 3.3 TEST EQUIPMENT REQUIRED

$9 y

"* g 3.3.1 Temperature Bath 9

> 4 j7

[]

3.3.2 Fluke 2175A Digital Thermometer or equivalent

()

3.3.3 Triplett Model 630 VOM or equivalent

()

3.4 Verify all Prerequisities or Initial Conditions are

  • /*

met.

()

4O MAIN BODY 4.1 CALCULATIONS 4.1.1 Obtain instrument setpoint Data from appropriate

  • /*

controlled document (s) and record document number (s) in "Consnents" section of " Data Sheet".

()

4.1.2

" Input" and " Expected" put and expected values in Calculate and record insections of " Data Sheet".

()

  • /*

4.1.3 Calculate Hi and Lo Limits and record in "Hi Limit" and

  • /*

"Lo Limit" sections of " Data Sheet".

()

4.2 REMOVAL FROM SERVICE NOTE The length of capillary insnersed in temperature bath must be the same as length of l

capillary immersed in process.

4.2.1 Close isolation valve (if applicable).

[]

l LO i

i Mj i.)

~ _ -.. ~..,

22332-C 2

4 of 10 i

.2.2 Disconnect lead wires from switch as required.

()

</ *

(Independent Verification required for safety-related O

systems) 4.2.3 Remove temperature sensing element from thermowell

()

and/or holding apparatus as necessary.

</

4.3.

CALIBRATION

" v;

-J, 4.3.1 Place temperature sensing element and Fluke digital

()

(

thermometer in temperature bath.

'[ '

4.3.2 Connect VOM across appropriate terminals to monitor

()

~~

contact action of switch under test.

4.3.3 Adj us t temperature bath to a point at which VOM M."

indicates contacts are in reset condition.

()

i t

/

NOTE As setpoint is approached

~

temperature bath should

/t

P]i4 be. adjusted in smaller F increments, allowing 3

temperature to stabilize F

after each adjustment of p,

temperature bath and prior 4Q to obtaining data and i

switch conditions.

4.3.4 Adjust-temperature bath to point at which required trip point it indicated b

  • /*-

value in "As Found" y VOM and record-temperature bath section of " Data Sheet".

()

t 4.3.5 Adjust - temperature bath to point at which required

  • /*

reset-contact action is indicated by' VOM and record tempe sture-bath value in "As Found section of " Data Sheet

()

4.3.6 If required, connect VOM to additional switch contacts and repeat steps 4.3.3 thru 4.3.5.

()

4.3.7 If,As-Found readings are within limits specified on J

" Data Sheet" and more accurate readin

  • /*

desired, record readings in "As Left"gs are not section of " Data Sheet" and proceed to appropriate subsection.

[]

i o

    • 1aat

VEGP 22332-C 2

5 of 10 4

4.3.8 If As Found readings are not within limits specified on

" Data-Sheet", or more accurate readings are desired, O

proceed as follows:

a.

Ensure that VOM is connected across correct switch terminal.

[]

7 temp' Data Shee t".erature bath to setpoint value as b.

Adj us t

  • D listed on (1

c.

Adj us t switch as re utred to obtain correct

["

G contact action as i dicated by VOM.

()

df Adj us t temperature bath to point at which VOM indicates contact trip action and note temperature value.

()

-L a

).

Adjust temperature bath to point at which VOM c

indicates contact reset action and note k

temperature value.

()

f Repeat steps 4.3.8b thru 4.3.8e until no further adjustments are necessary.

()

Rscord final values obtained in "As i. eft" 5

~ section

/*

cl " Data Sheet".

()

O 4.3.9 1f tem erstere switc8 has more than ene centact. regeet steps

.3.8a thru 4.3.8g if appropriate until all contacts have been calibrated.

[]

4.4 RESTORE TO SERVICE 4.4.1 Disconnect all test equipment used in performance of

  • /*

this procedure.

()

4.4.2 Reinstall temperature sensing element in thermowell

  • /*

and/or holding apparatus as required.

()

4.4.3 Reconnect switch leads as required.

()

  • l *_

4.4.4 Open isolation valve (if applicable).

[]

  • /*

4.4.5 Verify instrument reflects current plant conditions

  • /*

after it is returned to service.

()

O e

b

~.

VEGP 22332-C 2

6 of 10 4.4.6 For Safety-Related systems, have an Independent

  • /*

Restoration Verification performed by designated

()

personnel.

()

4.4.7 Notify RO chat instrument has been returned to service.

()

i 4.4.8 Notify Shif t Supervisor, or designee, of completion of

  • /*

work includin3 test results and obtain signature on

" Completion Sheet".

()

5.0 ACCEPTANCE CRITERIA 5.1 The Acceptance criteria for this procedure is that the temperature switch is within limits specified on " Data Sheet" i

5.2 Satisfectory completion of this procedure has been met when I&C Foreman has evaluated data obtained per Acceptance Criteria of this procedure, reviewed, and signed " Data Sheet" provided.

6.0 REFERENCE,3 6.1 Ins ruction Manual for switch under test.

6.2 Procedure 00306-C, " Temporary Jumper And Lifted Wire O

Control" END OF PROCEDURE TEXT m

p-r, d!

~

bhk.,

o O

4 h0N

r w -s-. m m

p, VECP 22332-C

~

2 7 of to Sheet I of 1 DATA SHEET nst. No.

Location Serial No.

Description Temperature Switch Manufacturer Model No.

NUTE57'7lff' i

Action UNITS EXPEUrt.D LO LIMIT HI LIMIT AS FOUND AS LEFT

-Switch TrippR Switch Reset i

Action UNITS EXPEUrt.D LO LIMIT HI LIMIT AS FOUND AS LEFT Switch Tripped j

l Switch Reset Action UNITS EXPECTED LO LIMIT HI LIMIT AS FOUND AS LEFT Switch Tripped Switch Reset 1 i

'CO M NTS:

^ = -

~

TEST EQUIPMENT I.D. NO.

MODEL NO.

CALEBRATION DUE DATE

-=se 5N Ya lO j

m.

PERFORMED BY:

DATE:

REVIEWED BY:

DATE:

APPROVED BY:

DATE:

VEGP 22332-C 2

6 of 10 Shoot 1 of i

[]

CALCULATION SHEET v

Show all calculations performed during course of this procedure in the space below.

1, t< r q

  • y=

6i.

illi j V

{

Lij f 'g[

U ' si <_ i u

L'

,r'N sg

^

A Completed by:

Date:

()

Reviewed by:

Date:

Approved by:

Date:

'C3 eat k

avioet w t i.o

%sivN pu,E so VEGP 22332-C 2

9 of 10 Sheet 1 of 1 CHECKLIST 3.1 Shift Supervisor Authorization i

i0 Signature

>i,Date.

4 3.2 Reactor Operator (RO) Notified i

/

Signature Date STEP VERIFICATION Step /Substep Initial Step /Substep Initial 3.4 Prerequisites met 4.4.4 Isolation valve 4.2.2 Leads disconnected 4.4.5 Reflects plant 4.2.2 Independent conditions Verification 4.4.1 Test ec uipment

removec, 4.4.2 Element installed 4.4.3 Leads connected

/

s

(

)

m RESTORATION VERIFICATION Initial Initial 1.

Element installed

3. Isolation valve open 2.

Leads connected Performed by:

Date

/'

l Reviewed by:

Date

P90CEDU E NO.

EEVl510N PAGE NO VEGP 22332-C 2

10 of 10 Sheet 1 of 1-COMPLETION SHEET PROCEDURE TITLE TEMPERATURE SWITCH CALIBRATION TIME TEST STARTED BY

_ DATE DEFICIENCIES OCCURRED AND ACTIONS TAKEN I

1 i

P 17~

A.., - ?m hfA5P a-u b

L',

i/lQ {

l

%9 i

.i g

i 4

i r

l TEST RESULTS:

ACCEPTABLE ( )

UNACCEPTABLE ( )

~

~.ITEMPERATURE SWITCH RESTORED TO SERVICE ( )

TEST COMPLETED BY TIME

_ DATE SHIFT SUPERVISOR NOTIFIED

/

Signature

~ Time Date REVIEWED BY:

DATE:

O APPROVED BY:

DATE:

344%

4

  • -w.w-.cwwy.w,v.-.+evsipe.-+,-,ev=,,ew,.-w r.-m.,m,-

-. rw w w-:

+y

-r

+wg.*

,m.

e<,-,,m,e y,-e.,,-

vi-.w

-ce<,,-

,.m..,

w-.

r.e.-,,

.i..---w, ec'

-