..S T A T E S, POWER COMPANY lbdticello' h'uclear Generating Plant Monticello,!N 55362 June 20,1977 Mr. J. G. Keppler, Director Region III ffice of Inspection nnd Enforcement t 'ted States 16 clear Regulatory Comission 799 oosevelt Road Glen yn, IL 60137 Dear Mr. h ler:
!O.\\TICELID hE" LEAR GENERATING PLAhT Docket No. 50-263 License No. DPR-22 On June 20, 1977, a 1 ter was received fmm the General Electric Company informing NSP that the iginal Cycle 5 analysis of the Critical Power Ratio is not sufficiently nservative.
It assummed a t1co pump trip with a 0.1 second delay for pump cctrical torttue to drop from 1000 to 04 follo'.cing a turbine trip. Ad y of 2.0 seconds is nore appropriate.
A conservative estimate is that thi. will msult in increasing the frPR lintit pg.nl for both our 7 x 7 and 8 x 8 fuel h) 0.08.
!)%;;-Q-
.yz -
This additional conservatism is being a "nistratively added to the Techni-
@$ i' cal Specification lintits.
-t Yours vep t y y
.i.M::T m/)d.
LJ,y g;;fy
.y$.L[:.a
_~
u b, L. R. Eliason e @y,4 Plant Mmager Q,,,.
LRE/sdd Director, Office of Ihnancment Information 6 cc:
Program Control
.i
.?"y:h.
G. Charnoff
'n Minnesota Pollution Control Agency Atta:
J. h'. Feman
- ,:t.l File Q:
1 1 3..*
y,J.
Copy sent by telecopier to Keppler.
g:,
r L?. - ; q t y:,
i 8312020160 700426 PDR ADOCK 05000263 ft 2, b gY S g /.7 7 ff(t L,0. N.
S PM am -
==
.......r-gg c..
..