ML20086D481

From kanterella
Jump to navigation Jump to search
Advises That Addl Conservatism Being Administratively Added to Tech Specs for Max Critical Power Ratio Limits,In Light of GE
ML20086D481
Person / Time
Site: Monticello, 05000000
Issue date: 06/20/1977
From: Eliason L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19289B550 List:
References
NUDOCS 8312020160
Download: ML20086D481 (1)


Text

-

'[

e.

q o

NORrHERN

..S T A T E S, POWER COMPANY lbdticello' h'uclear Generating Plant Monticello,!N 55362 June 20,1977 Mr. J. G. Keppler, Director Region III ffice of Inspection nnd Enforcement t 'ted States 16 clear Regulatory Comission 799 oosevelt Road Glen yn, IL 60137 Dear Mr. h ler:

!O.\\TICELID hE" LEAR GENERATING PLAhT Docket No. 50-263 License No. DPR-22 On June 20, 1977, a 1 ter was received fmm the General Electric Company informing NSP that the iginal Cycle 5 analysis of the Critical Power Ratio is not sufficiently nservative.

It assummed a t1co pump trip with a 0.1 second delay for pump cctrical torttue to drop from 1000 to 04 follo'.cing a turbine trip. Ad y of 2.0 seconds is nore appropriate.

A conservative estimate is that thi. will msult in increasing the frPR lintit pg.nl for both our 7 x 7 and 8 x 8 fuel h) 0.08.

!)%;;-Q-

.yz -

This additional conservatism is being a "nistratively added to the Techni-

@$ i' cal Specification lintits.

-t Yours vep t y y

.i.M::T m/)d.

LJ,y g;;fy

.y$.L[:.a

_~

u b, L. R. Eliason e @y,4 Plant Mmager Q,,,.

LRE/sdd Director, Office of Ihnancment Information 6 cc:

Program Control

.i

.?"y:h.

G. Charnoff

'n Minnesota Pollution Control Agency Atta:

J. h'. Feman

,:t.l File Q:

1 1 3..*

y,J.

Copy sent by telecopier to Keppler.

g:,

r L?. - ; q t y:,

i 8312020160 700426 PDR ADOCK 05000263 ft 2, b gY S g /.7 7 ff(t L,0. N.

S PM am -

==

.......r-gg c..

..