l NORTHERN STATES POWER COMPANY M IN N E A PO L.a s. M IN N E SOTA S S401 June 7, 1976
- x
.x s -
- U N
'\\
D Dj[5
,.; ~,
Mr Victor Stello, Director i~h % jJg. y, T.
Division of Operating Reactors (y';3 cu, ;.,7;f
'(
U S Nuclear Regulatory Commission
,?/
i Washington, DC 20555
- 1.,,,
s
'Q@,
Dear Mr Stello:
MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 I
Response to 5/20/76 Inquiry Concerning LPCI Design
)
i Your May 20, 1976 letter identified a potential design deficiency related to LPCI pump cavitation and motor overload. Monticello has the Loop Selection Logic System and does not have the LPCI modification. Therefore, item a j
of your letter is applicable and item b.is not.
The Monticello piping layout and pump data have been reviewed. At runout
[
flow the NPSH requirements of the pump are met.
The pump characteristic l
curves show that at high flows, the brake horsepower and motor current de-A crease.
Therefore, the Monticello LPCI pumps are not subject to damage due to cavitation or motor overload in the runout condition.
(
Yours Very truly, L 0 Mayer, PE bb1 Manager, Nuclear Support Services LQ4/MHV/ deb cc: J G Keppler C Charnoff i