ML20086D788
Text
,
& 8.A/Q
.J
\\.
fy NOS NOMTHERN 5TATES POWER C O M P A-N 'tf' -
Montice]Io luc 3 car Generating Plant Monticello, )W. M062 i
Septeinber 10, 1976 Mr. J. G. Kcppler, Director Region 11]
Offico of Inspection and Enforcement United Staten Ibclear Regulatory Co:maission 795t Roosevelt Road Glen 101yn,1311nois 60137
Dear I&. Keppler:
15)Mr3CEL10143CLP.AR GP)EHKrIlfJ PLAW Boeket No. 50-263 License No. DPR-22 On Septctaber 9,1976, it was fourut that tonxs water voltme was several.)nm-dred cubic. feet below the 68,000 cubic foot minirams required by TecJmical Specification 3,7.A.1 (e).
'Ibnis tet.cr }cyc1 had been reduced slightly on September 7,.1976, in response to recently expnssed NRC desire that level he reintaitied closer to the low ]imit-to adnimize. structural londs during a IDCA.
The correlation between volume aml indicated Icyc1 which war. used to estab3ish the desired IcVel Igid not been corrected to account for water displaced imm the ' vent dowmomers due.to the dr>vell - torus pressure diff-crential,.
tipon discovery, the wtter voltmc was increased to slightly above the' limit, and a new volume vs level cortclation was issutxl.
Yours ven truly, 9}
n 0 f I k. b
( c a.k.
L.R. Elianon Plant Manager LRE/sdd cc:
Director, Office of ihnugement Information in Program Control (2 copies)'
G Charnoff 141nnesota Pollution Control Agency ~
Attn:
JifPenwut
~
' Pile-Copy sent by-telecopier to Keppler.
% k2 g g [9 %
0
-S I(*-
/// (=7
- //[/d[/g,.