p ree
,[8,.
f,,
UNITED STATES g
NUCLEAR REGULATORY COMMISSION 5
j WASHINGTON, D. C. 20555
...../
WISCONSIN ELECTRIC POWER COMPANY DOCKET NO. 50-266 POINT BEACH NUCLEAR PLANT, UNIT NO._1_
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 74 License No. DPR-24 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Wisconsin Electric Power Company (thelicensee)datedJune 30, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the i
Comission; C.
There is reasonable assur6 ace (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
8310130056 030930 PDR ADOCK 05000266 P
.. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No.
DPR-24 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in' Appendices A and B, as revised through Amendment No. 74, are hereby incorporated in the license. The licensee shall operate the facility in accordance witie the Technical Specifications.
3.
This license amendment is effective 20 days from th'e date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION m
James R. Miller, Chief Operating Reactors Branch #3 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: September 30, 1983 m
O s
49
%,h UNITED STATES p-
..", g NUCLEAR REGULATORY COMMISSION j
wAsHLNGTON, D. C. 20555
'e WISCONSIN ELECTRIC POWER COMPANY DOCKET N0. 50-301 POINT BEACH NUCLEAR PLANT, UNIT N0. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 79 License No. DPR-27 1.
The Nuclear Regulatory Comission (the Commission) has found that:
A.
The application for amendment by Wisconsin Electric Power Company (thelicensee)datedJune 30, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements l
have been satisfied.
i t
1 l
l
.. 2.
Accordingly, t':e license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No.
DPR-27 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in' Appendices A and B, j
as revised through Amendment No. 79, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective 20 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION e
James R. Miller, Chief Operating Reactors Branch #3 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 30, 1983
/
e 4
ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT NO. 74 TO FACILITY OPERATING LICENSE N0. DPR-24 AMENDMENT NO. 79 TO FACILITY OPERATING LICENSE NO. DPR-27 DOCKET NOS. 50-266 AND 50-301
. Revise Appendix A as follows:
Remove Pages Insert Pages Table 15.3.5-1 Table 15.3.5-1 page 2 of 2 page 2 of 2 s
1 e
4
.1 l
b e
4 t
k n
l
4 TABLE 15..5-1 (Continued)
E'2' (Page 2 of 2)
EE ne RE NO.
FUNCTIONAL UNIT CHANNEL SETTING LIMIT aa 9.
Degraded Voltage (4.16 KV)
Disconnection of affected
>3875 volts i 2%
Ef E bus from offsite power 5'ime delay: Jess than 60 sec
.p p at 0-100% of voltage setting nw 10.
Loss of Voltage a.
4.16 KV' Disconnection of affected
- a. 2450 volts 3%
bus from offsite power Time delay:
0.3 sec 5%
Start Diesel at 0 volts 1.2 sec 5% at 90% of voltage setting b.
480 V Load shedding
- b. 256 volts 3%
Time delay: 0.75 sec. 5%
4 at 0 volts 3.5 see 15% at 90% of voltage setting BrF aa a o.
EE
.F F b.*
j 0s2