Letter Sequence Request |
|---|
|
Results
Other: ML19350D332, ML19350D336, ML19352A999, ML20039B316, ML20039F991, ML20040A029, ML20040B111, ML20040B125, ML20053D878, ML20054M208, ML20078G657
|
MONTHYEARML19263F4321980-01-17017 January 1980 Responds to NRC Dec 1979 Request for Info Re Safeguard Motor Voltage Ratings.Safeguard Motors Rated to Start & Accelerate Loads w/80% Voltage.Motors Can Carry Normal Loads at 80% W/O Overheating Project stage: Request ML19350D3321981-03-31031 March 1981 Amends 47 & 52 to Licenses DPR-24 & DPR-27,respectively, Reflecting Mods to Plant Equipment for Addl Assurance of Proper Functioning of safety-related Electrical & Emergency Power Sys Project stage: Other ML19350D3341981-03-31031 March 1981 Safety Evaluation Supporting Amends 47 & 52 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML19350D3361981-03-31031 March 1981 Notice of Issuance & Availability of Amends 47 & 52 to Licenses DPR-24 & DPR-27,respectively Project stage: Other ML19352A9991981-05-30030 May 1981 Informs That Mod of Protective Relaying Unavoidably Delayed, Due to Longer than Anticipated Delivery Times for Required Replacement Relays for safety-related Electrical Distribution Buses.Anticipates Mod Completion by 810831 Project stage: Other ML20038B9581981-12-0303 December 1981 Application for Amend to Licenses DPR-24 & DPR-27 Changing Time Delay Specified in Item 9 of Table 15.3.5-1 to Insure Emergency Power Undervoltage Relay Protection & Permit Start of Reactor Coolant Pump Motor in Cold Shutdown Project stage: Request ML20039F2101981-12-0404 December 1981 Confirms 811203 Telephone Authorization for Amends to Licenses DPR-24 & DPR-27,revising Time Delay to Degraded Grid U/V Relays.Draft Safety Evaluation Encl Project stage: Draft Approval ML20039B3161981-12-0909 December 1981 Forwards Fee for Amends 47 & 52 to Licenses DPR-24 & DPR-27, Respectively,Per 811203 Tech Spec Change Request.Amends Adjust Relay Time Delay.Responses to Addl Questions for Final Approval Will Be Provided as Soon as Possible Project stage: Other ML20040A0291981-12-17017 December 1981 Requests Remittance of Class III & I Fees for 811203 Application to Change Tech Specs Re Degraded Grid Undervoltage Relay Time Delay Project stage: Other ML20039F9911981-12-21021 December 1981 Notice of Issuance & Availability of Amends 57 & 61 to Licenses DPR-24 & DPR-27,respectively Project stage: Other ML20039F9861981-12-21021 December 1981 Safety Evaluation Supporting Amends 57 & 61 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20039D6141981-12-30030 December 1981 Application for Amend to Licenses DPR-24 & DPR-27,responding to NRC 811218 Telecopied Request for Addl Info on 811203 Tech Spec Change Request 74 Re Emergency Power Undervoltage Relay Protection Project stage: Request ML20040B1251982-01-0606 January 1982 Notice of Issuance & Availability of Amends 58 & 62 to Licenses DPR-24 & DPR-27,respectively Project stage: Other ML20040B1131982-01-0606 January 1982 Safety Evaluation Supporting Amends 58 & 62 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20040B1111982-01-0606 January 1982 Amends 58 & 62 to Licenses DPR-24 & DPR-27,respectively, Revising Degraded Grid Undervoltage Relay Setpoint & Associated Time Delay Project stage: Other ML20053D8781982-06-0101 June 1982 Forwards Clarification & Updated Info Re Adequacy of Station Electrical Distribution Sys Voltages Referenced in NRC .Info Combined w/810601 & 1230 Ltrs Completes Response Project stage: Other ML20054M2081982-06-30030 June 1982 Proposed Tech Spec Change Revising Voltage & Time Delay Setpoints for Degraded Voltage Relays Project stage: Other ML20054M2061982-06-30030 June 1982 Application to Amend Ol,Revising Voltage & Time Delay Setpoints for Degraded Voltage Relays Project stage: Request ML20063M5941982-09-10010 September 1982 Responds to 820813 Request for Addl Info Re Adequacy of Electrical Distribution Sys Voltages.Theoretical & Actual Voltages for safety-related Buses Listed Project stage: Request ML20078G6631983-09-30030 September 1983 Safety Evaluation Supporting Amends 74 & 79 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20078G6571983-09-30030 September 1983 Amends 74 & 79 to Licenses DPR-24 & DPR-27,respectively, Revising Degraded Grid Voltage Relay Setpoint & Associated Time Delay in Table 15.3.5-1 of Tech Specs Project stage: Other 1981-12-09
[Table View] |
Text
.e-8 wisconsin Electnc m coum 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI S3201 Tanuary 17, 1980 Mr. Harold R.
Denton, Director Office of Nuclear Reactor Regulation U.
S. NUCLEAR REGULATORY COMMISSION Washington, D.
C.
20555 Attention:
Mr.
A.
Schwencer, Chief
~
Operating Reactors Branch 1 Gentlemen:
DOCKET NOS. 50-266 AND 50-301 ADDITIONAL INFORMATION DEGRADED AUXILIARY BUS VOLTAGE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 In response to the NRC's request for additional infor-mation dated July 3, 1979, we provided a modification to our Technical Specification Change Request No. 45 by letter dated August 24, 1979.
This information included a discussion of voltage monitors on the plant auxiliary buses.
In December, Mr. Trammell of your Staff called to discuss the topic of voltage monitors further.
During this discussion, Mr. Trammell requested that we provide information on the safeguards motor voltage ratings and the results of our tests to determine minimum pickup and maximum dropout voltages for the safeguards motor starters.
The safeguards motors are rated to start and accelerate their loads with 80% voltage.
They are rated to run continuously at 90% to 110% voltage.
However, since the motors have a service factor of 1.15 and are not loaded beyond 1.0, they can carry their normal loads at 80% voltage without overheating.
The 480 volt motor starter pickup and dropout tests demonstrated that the size 1 and 1R contactors would pick up at 87 volts (72.5% of nominal) and would drop out at 62 volts (51.7%
of nominal).
The size 2 and 4 contactors picked up at 85 volts (70.8% of nominal) and dropped out at 60 and 63 volts respectively (50% and 52.5% of nominal).
There are no size 3 safeguards motor starters.
/40/S 1816 301 5
i/O 800128o 3 4 O
,,g-Mr. Harold R.
Denton January 17, 1980 We trust this information satisfies the questions expressed in your call.
Please advise us if you require any further information.
Very truly yours, k
da C.
W.
Fa irector Nuclear Power Department 1816.302