Letter Sequence Request |
|---|
|
Results
Other: ML19350D332, ML19350D336, ML19352A999, ML20039B316, ML20039F991, ML20040A029, ML20040B111, ML20040B125, ML20053D878, ML20054M208, ML20078G657
|
MONTHYEARML19263F4321980-01-17017 January 1980 Responds to NRC Dec 1979 Request for Info Re Safeguard Motor Voltage Ratings.Safeguard Motors Rated to Start & Accelerate Loads w/80% Voltage.Motors Can Carry Normal Loads at 80% W/O Overheating Project stage: Request ML19350D3321981-03-31031 March 1981 Amends 47 & 52 to Licenses DPR-24 & DPR-27,respectively, Reflecting Mods to Plant Equipment for Addl Assurance of Proper Functioning of safety-related Electrical & Emergency Power Sys Project stage: Other ML19350D3341981-03-31031 March 1981 Safety Evaluation Supporting Amends 47 & 52 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML19350D3361981-03-31031 March 1981 Notice of Issuance & Availability of Amends 47 & 52 to Licenses DPR-24 & DPR-27,respectively Project stage: Other ML19352A9991981-05-30030 May 1981 Informs That Mod of Protective Relaying Unavoidably Delayed, Due to Longer than Anticipated Delivery Times for Required Replacement Relays for safety-related Electrical Distribution Buses.Anticipates Mod Completion by 810831 Project stage: Other ML20038B9581981-12-0303 December 1981 Application for Amend to Licenses DPR-24 & DPR-27 Changing Time Delay Specified in Item 9 of Table 15.3.5-1 to Insure Emergency Power Undervoltage Relay Protection & Permit Start of Reactor Coolant Pump Motor in Cold Shutdown Project stage: Request ML20039F2101981-12-0404 December 1981 Confirms 811203 Telephone Authorization for Amends to Licenses DPR-24 & DPR-27,revising Time Delay to Degraded Grid U/V Relays.Draft Safety Evaluation Encl Project stage: Draft Approval ML20039B3161981-12-0909 December 1981 Forwards Fee for Amends 47 & 52 to Licenses DPR-24 & DPR-27, Respectively,Per 811203 Tech Spec Change Request.Amends Adjust Relay Time Delay.Responses to Addl Questions for Final Approval Will Be Provided as Soon as Possible Project stage: Other ML20040A0291981-12-17017 December 1981 Requests Remittance of Class III & I Fees for 811203 Application to Change Tech Specs Re Degraded Grid Undervoltage Relay Time Delay Project stage: Other ML20039F9911981-12-21021 December 1981 Notice of Issuance & Availability of Amends 57 & 61 to Licenses DPR-24 & DPR-27,respectively Project stage: Other ML20039F9861981-12-21021 December 1981 Safety Evaluation Supporting Amends 57 & 61 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20039D6141981-12-30030 December 1981 Application for Amend to Licenses DPR-24 & DPR-27,responding to NRC 811218 Telecopied Request for Addl Info on 811203 Tech Spec Change Request 74 Re Emergency Power Undervoltage Relay Protection Project stage: Request ML20040B1251982-01-0606 January 1982 Notice of Issuance & Availability of Amends 58 & 62 to Licenses DPR-24 & DPR-27,respectively Project stage: Other ML20040B1131982-01-0606 January 1982 Safety Evaluation Supporting Amends 58 & 62 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20040B1111982-01-0606 January 1982 Amends 58 & 62 to Licenses DPR-24 & DPR-27,respectively, Revising Degraded Grid Undervoltage Relay Setpoint & Associated Time Delay Project stage: Other ML20053D8781982-06-0101 June 1982 Forwards Clarification & Updated Info Re Adequacy of Station Electrical Distribution Sys Voltages Referenced in NRC .Info Combined w/810601 & 1230 Ltrs Completes Response Project stage: Other ML20054M2081982-06-30030 June 1982 Proposed Tech Spec Change Revising Voltage & Time Delay Setpoints for Degraded Voltage Relays Project stage: Other ML20054M2061982-06-30030 June 1982 Application to Amend Ol,Revising Voltage & Time Delay Setpoints for Degraded Voltage Relays Project stage: Request ML20063M5941982-09-10010 September 1982 Responds to 820813 Request for Addl Info Re Adequacy of Electrical Distribution Sys Voltages.Theoretical & Actual Voltages for safety-related Buses Listed Project stage: Request ML20078G6631983-09-30030 September 1983 Safety Evaluation Supporting Amends 74 & 79 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20078G6571983-09-30030 September 1983 Amends 74 & 79 to Licenses DPR-24 & DPR-27,respectively, Revising Degraded Grid Voltage Relay Setpoint & Associated Time Delay in Table 15.3.5-1 of Tech Specs Project stage: Other 1981-12-09
[Table View] |
Text
'
1 Wisconsin Elecinc rana couesnr 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 June 30, 1982 CERTIFIED MAIL Mr. H.
R.
Denton, Director Office of Nuclear Reactor Regulation U.S.
NUCLEAR REGULATORY COMMISSION Washington, D.
C.
20555
Dear Mr. Denton:
DOCKET NOS. 50-266 AND 50-301 TECHNICAL SPECIFICATION CHANGE REQUEST NO. 81 DEGRADED VOLTAGE RELAY SETPOINTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 In accordance with the provisions of 10 CFR Part 50.59, Wisconsin Electric Power Company (Licensee) hereby submits an application for amendments to Facility Operating Licenses DPR-24 and DPR-27 for the Point Beach Nuclear Plant, Units 1 and 2, respectively.
The purpose of these amendments is to incorporate certain changes into the Technical Specifications for the Point Beach Nuclear Plant.
These changes consist of revisions to the voltage and time delay setpoints for the degraded voltage relays and are submitted in compliance with the requirements of the footnote to Item 9 of Table 15.3.5-1 of the Point Beach Technical Specifications.
On June 1, 1982, Licensee submitted a letter which provided additional information concerning the adequacy of station distribution voltages at the Point Beach Nuclear Plant.
In that letter, we stated that we would propose this Technical Specification change.
The proposed revision effects Item 9 of Table 15.3.5-1 and changes the voltage setpoint from >3762 volts
+2% to >3875 volts +2%.
We further propose to change the time delay setpoint to read "less than 60 seconds at 0-100% of voltage setting".
As discussed in our June 1 letter, these j
settings assure minimum safety-related bus voltage of 94.9%
y O/2>
of the 4000V motor ratings and 90% of the 460V motor ratings.
W C 60 y /00 06 ~~
8207120096 820630 PDR ADDCK 05000266 P
PDR
~1 Mr. H.
R. Denton June 30, 1982 Licensee has determined that approval of this license amendment request would constitute a Class III approval as defined in 10 CFR Part 170.22 for the Point Beach Unit 1 facility operating license.
A duplicate review for the second Point Beach unit constitutes a Class I approval.
Accordingly, we have enclosed a check drawn in the amount of $4,400 for these license amendment approval fees.
As specified in the Commission's regulations, enclosed are three signed originals and, under separate cover, 40 copies of this license amendment application.
Included with this application is a proposed page change for the Technical Specifications with the specific revisions discussed in this application identified by margin bars.
Please contact us if you have any questions concerning this submittal.
Very truly yours, Assistant Vice President C. W.
Fay Attachment (Check No. 681233)
Copy to NRC Resident Inspector Subscribed and sworn ts before me this 30M day of June 1982.
[%
Notary PubhfE, State of Wisconsin My Commission expires M //(If, v
gr -
-