Amends 58 & 62 to Licenses DPR-24 & DPR-27,respectively, Revising Degraded Grid Undervoltage Relay Setpoint & Associated Time Delay
ML20040B111
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/06/1982
From: Clark R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20040B108 List:
References
TAC-47404, TAC-47405, NUDOCS 8201250165
Download: ML20040B111 (8)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

63 K809' 8 j )., r 'h UNITED STATES i

NUCLEAR REGULATORY COMMISSION

,, e '

l WASHINGTON, D. C. 20555 g;.v f WISCONSIN ELECTRIC POWER COMPANY DOCKET NO. 50-266 POINT BEACH NUCLEAR PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 58 License No. DPR-24 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Wisconsin Electric Power Company (the licensee) dated December 3,1981 as modified by letter dated December 30, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comis'; ion ;

C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common deferse and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-24 is hereby amended to read as follows:

O 8201250165 820106 PDR ADOCK 05000266 P

pop

(B) Technical Soecifications The Techniccl Specifications contained in Appendices A and B, as revised through Amendment No. 58, are hereby incor-porated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective five days from the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Q

-- O ca.

obert A. Clark, Chief Operating R0 actors Branch #3 Division of Licensing Attachments:

Changes to the Technical Specifications Date of Issuance: January 6, 1982 O

e e

W 6

______._____J

i ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 58 TO FACILITY OPERATING LICENSE NO. DPR-24 1

DOCKET NO. 50-266 1

i i

Revise Appendix A as follows:

i Remove Page Insert Page Table 15.3.5-1 Table 15.3.5-1 (continued) page 2 of 2 (continued) page 2 of 2 2

)

O s

i d

3 N

~

i

=

e 6

- ~ _

TABLE 15.3.5-1 (Continued) o' (Page 2 of 2)

ET NO.

FUNCTIONAL UNIT CHANNEL SETTING LIMIT E

h, 9.

Degraded Voltage (4.16 KV)

Disconnection of affected

> 3762 volts i 2%

bus from offsite power Time delay: less than 30 sec=

c at 0-100% of voltage setting **

n C

10.

. Loss of Voltage a.

4.16 KV Disconnection of affected 2450 volts i 3%

bus from offsite power Time delay: 0.3 sec. 1 5%

Start Diesel at 0 volts 1.2 sec.15% at. 90% of voltage setting.

b.

480 V Load shedding

b. 256 volts i 3%

Time delay: 0.75 sec. 1 5%

at 0 volts 3.5 sec. i 15% at 90% of voltage setting

. g.

ao.

Within 6 nonths of the effective date of this amendment (January 11, 1982) the licensee will submit 4

E further-justification for this voltage setpoint and time delay or a proposed Technical Specification i

z change for Units 1 and 2.

$.1 D

.t t

,.I i

pavecog h

UNITED STAT.is

[,j q<

',g NUCLEAR REGULATORY COMMISSION g.

l warmNGTON, D. C. 20555

%; ~ j WISCONSIN ELECTRIC POWER COMPANY DOCKET NO. 50-301 POINT BEACH NUCLEAR PLANT, UNIT NO._2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 62 License No. DPR-27 1.

The Nuc~. ear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Wisconsin Electric Power Company (the licensee) dated December 3,1981 as modified by letter dated December 30, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the i

Act) and the Commission's rules and regulations set forth in 10 1

CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Conmission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the nealth and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 1

51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No. DPR-27 is hereby amended to read as follows:

l I

l (3) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 62, are hereby incor-porated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective upon return to power from the Spring 1982 refueling outage.

FOR THE NUCLEAR REGULATORY COMMISSION l'

\\g.

--k. f Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing Attachments:

Changes to the Technical Specifications Date of Issuance:

January 6, 1982 m

M

=

=

l 1

?

l l

I

i 1

l l

4 ATTACHMENT TO LICENSE AMEllDMENT AMEf4DMENT NO. 62 TO FACILITY OPERATING LICENSE fl0. DPR-27 DOCKET NO. 50-301 i

Revise Appendix A as follows:

Remove Page Insert Page Table 15.3.5-1 Table 15.3.5-1 (continued) page 2 of 2 (continued) page 2 of 2 e

}

}

l i

i l

l S

e m

1 9

e S

g c-y n,---

..w, e,----

--ne--o-

~

TABLE 15.3.5-1 (Continued) o' (Page 2 of 2)

ET NO.

FUNCTIONAL UNIT CllANNEL SETTING LIMIT g,

9.

Degraded Voltage (4.16 KV)

Disconnection of affected

> 3762 volts + 2%

bus from offsite power Time delay: less than 30 sec at 0-100% of voltage setting **

X 10.

Loss of Voltage w

a.

4.16 KV Disconnection of affected

a. 2450 volts i 3%

bus from offsite power Time delay: 0.3 sec. 1 5%

Start Diesel at 0 volts 1.2 sec. 1 5% at 90% of voltage setting b.

480 V Load shedding

b. 256 volts i 3%

Time delay: 0.75 sec. 1 5%

at 0 volts 3.5 sec. i 15% at 90% of voltage setting I

$o.

No"

    • This limit is effective upon installation of the associated relays but in no case,later than upon Ef return to power from the Spring 1982 refueling outage.

.E m

E i

e a

.e

..