Rev 0 to Technical Note 20684-BV, Thermo-Lag 330 Fire Barrier Sys Installation Procedures Manual Nuclear Plant Applications Prepared for Stone & Webster Engineering Corp
ML20076J182
Person / Time
Site: Beaver Valley
Issue date: 05/07/1985
From:
THERMAL SCIENCE, INC.
To:
Shared Package
ML20076E803 List:
References
FOIA-93-230 20684-BV, NUDOCS 9410250135
Download: ML20076J182 (63)


Text

,.;.0 ~

APPENDIX III TO THERMAL SCIENCE, INC.'S RESPONSE TO THE UNITED STATES NUCLEAR REGULATORY COMhUSSION'S LETTER DATED 10 SEPTEMBER 1991 Enclosure 38 TSI Technical Note 20684-BV l

THERMO-LAG 330 Fire Barrier System Installation Procedures Manual i Nuclear Plant Applications Prepared For Stone & Webster Engineering i

Corporation, Beaver Valley Nuclear Power Plant REV O May 7.1985 l

l l

I l

(fG Q b !dSD i

7 '

9410250135 930830 -]

\

PDR FOIA LAMBREC93-230 PDR

1

)

TSI TECHNICAL NOTE 20684-BV THERMO-LAG 330 FIRE BARRIER SYSTEM INSTALLATION PROCEDURES MANUAL NUCLEAR PLANT APPLICATIONS DATE OF ISSUE: MAY 17, 1985 i

)

1 PREPARED FOR:

STONE & WEBSTER ENGINEERING CORPORATION BEAVER VALLEY NUCLEAR POWER PLANT I 1

I THERMAL SCIENCE, INC + 2200 CASSENS DR. ST. LOUIS, MO 63026 a (314) 349-1233 Telex: Domestic 44 2384 + Overseas 209901 + Telecopier (314) 3491207

TSI TECHNICAL NOTE 20684-BV 4 1

TABLE OF C0hTEhIS l l

1 I

PACE NO. j SECTION I GENERAL DESCRIPTION 1-0 1

1.0 INTRODUCTION

1-1 )

2.0 FIRE BARRIER DESIGNS 1-1 i

2.1 Preshaped Panel Design 1-2 2.2 Preshaped Conduit Section Design 1-2 i 3.0 MATERIAL COMPONENTS 1-3 3.1 THERMD-LAG Stress Skin Type 330-69 l-3 l 3.2 THERMD-LAG 330-1 Subliming Material 1-3 I 3.3 Primary Raceway Supports and all Penetrations Into The THERMO-LAG 330 '

Fire Barrier System 1-4 SECTION II INSTALLATION PROCEDUKES 2-0 1.0 PRE-APPLICATION PRACTICES 2-1 1.1 Qualification of Contractor 2-1 1.2 Safety Precautions 2-1 1.3 Delivery 2-1 1.4 Storage 2-1 2.0 PREFRABRICATED PANEL READY ACCESS DESIGNS FUR CABLE TRAYS 2-2 2.1 Installation of one Hour Ready Access Fire Barrier Design 2-2 2.2 Installation of Three Bour Ready Access  ;

Fire Barrier Design 2-4 j 3.0 PREFABRICATED PANEL DESIGN FOR JUNCTION BOXES 2-6 3.1 Installation o'f one Bour Fire Barrier Design 2-6 3.2 Installation of Three Hour Fire B,arrier Design 2-8 4.0 PRESHAPED CONDUIT SECTION DESIGN FOR CONDUIT.

CABLE DROPS AND INSTRINENT TUBING 2-10 4.1 Installation of One Hour Fire Barrier Design 2-10 4.2 Installation of Three Hour Fire Barrier Design 2-12 14 ,

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ l

TSI TECHNICAL NOTE 20684-BV

~

TABLE OF CONTENTS CONTINUED PAGE NO.

5.0 INTERFACES 2-13 5.1 Installation of One or Three Bour Interface Between a Cable Tray or Conduit and a Penetration Seal 2-13 5.2 Installation of one or Three Hour Self Supporting Interface Between Conduit or Instrument Tubing and a Wall or Ceiling 2-14 5.3 Installation of One and Three Hour Interface Between a Cable Tray and a Conduit 2-14 6.0 REPAIR PROCEDURES 2-23 7.0 CABLE REPLACEMENT PROCEDURES 2-24 8.0 POST APPLICATION PRACTICES 2-24 SECTION III TECHNICAL DOCUMENTATION 3-0 1 PRODUCT DATA SHEETS 3-1 THERMO-LAG 330-1 Subliming Material 3-2 THERMO-LAG Stress Skin Type 330-69 3-2 2 MATERIAL SAFETY DATA SHEETS 3-7 TEERMO-LAG 330-1 Sublining Material 3-8 3 RECOMMENDED ON-SITE QUALITY CONTROL PROCEDURES 3-9 4 RECOMMENDED LIST OF INSTALLATION TOOLS 3-12 SECTION IV OPTIONS 4-0 1.0 Direct Spray Over Stress Skin Design 1-3 2.0 Direct Spray-On Design 1-3 3.0 THERMO-LAG 351-2 Primer 4-2 4.0 THERMO-LA0 350 Two Part Topcoat 4-2 iii

TSI TECHNICAL NOTE 20684-BV TABLE OF CONTENTS CONTINUED PAGE NO.

5.0 PREFABRICATED PANEL DESIGN FOR CONDUIT, CABLE DROPS AND INSTRUMENT TUBING 4-3 5.1 Installation of One Hour Fire Barrier Design 4-3 5.2 Inst 11ation of Three Hour Ready Access Fire Barrier Design 4-5 6.0 PREFABRICATED PANEL THREE HOUR FIRE WALL DESIGN 4-6 6.1 Inst.allation of Three Hour Fire .

Barrier Design 4-6 7.0 DIRECT SPRAY OVER STRESS SKIN DESIGN IDR CABLE TRAYS 4-8 7.1 Installation of One Hour Fire Barrier Design 4-8 7.2 Installation of Three Hour Fire i Barrier Design 4-13 8.0 DIRECT SPRAY OVER STRESS SKIN DESIGN FOR CONDUIT, CABLE DROPS MTD INSTRUMENT TUBING 4-15

3.1 Installation of 0.e Hour Fire Barrier Design 4-15 8.2 Installation of Three Hour Fire Barrier Design 4-17 9.0 DIRECT SPRAY OVER EXPANDED HETAL THREE HOUR FIRE WALL DESIGN 4-20 9.1 Installation of Three Hour Fire Barrier Design 4-20 10.0 DIRECT SPRAY ON DESIGN FOR CABLES INSTALLED IN A CABLE TRAY 4-22 10.1 Application of One Hour Fire Barrier Design 4-22 I

iv

( .

TSI TECHNICAL NOTE 20684-BV TABLE OF CONTENTS-CONTINUED

. PAGE NO.

11.0 COATING APPLICATION TECHNIQUES 4-25 11.1 THERMO-LAG 351 Primer Application 4-25 11.2 THERMO-LAG 330-1 Subliming Material Spray Application 4-26 11.3 THERMO-LAG 330-1 Subliming Material Trowel Application 4-27 11.4 Dry Film Thickness Measurements 4-27 PRODUCT DATA SHEETS

..THERMD-LAG 351-2 Primer 4-28

..THERMO-LAG 350 TwoPart Topcoat 4-29 MATERIAL SAFETY DATA SEETS

. .TERMO-LAG 351-2 Primer 4-33

..THERMO-LAG 350 Two Part Topcoat 4-34 SUGGESTED COMPLIMENT OF REQUIRED SPPAY EQUIPMENT FOR TERMO-LAG 330-1 SUBLIMING '

COATING APPLICATION 4-35 AIRLESS SPRAY EQUIPMEhr 4-36 TSI TECHNICAL NOTE 22285 INSTALLATION PROCEDURES'FOR ONE AND THREE.

HOUR FIRE RATED DESIGNS OF TE TERMD-LAG l 330-660 FLEXI-BLANKET THERMAL BARRIER SYSTEM FOR CONDUIT, FLEX CONDUIT, AIR DROP CABLES AND UNISTRUTS 4-37

.l

TSI TECHNICAL NOTE 20684-BV LIST OF FIGURES FIGURE NO. TITLE PAGE NO.

" TYPICAL" INSTALLATION DETAILS 1 THERMO-LAG 330 FIRE BARRIER SYSTEM PREFABRICATED PANEL READY ACCESS DESIGN FOR CABLE TRAYS LADDER TRAY - BOTTOM SECTION DETAILS- 2-3 2 THERMO-LAG 330 FIRE BARRIER SYSTEM PREFABRICATED PANEL READY ACCESS DESIGN FOR CABLE TRAYS LADDER TRAY FIRE BARRIER ASSEMBLY 2-5 3 THERMO-LAG 330 FIRE BARRIER SYSTEM PREFABRICATED PANEL DESIGN FOR JUNCTION BOXES 2 4 4 THERMO-LAG 330 FIRE BARRIER SYSTEM PRESHAPED CONDUIT SECTION DESIGN POR CONDUIT, CABLE DROPS AND INSTRUMENT TUBING 2-11

5 TYPICAL THERMO-LAG RACEWAY INTERFACING WITH PENETRATION SEAL ONE BOUR PREFABRICATED PANEL - 2-15 6 TYPICAL THERMD-LAG RACEWAY-INTERFACING WITH PENETRATION SEAL THREE HOUR 1" PANEL 2-16 7 TYPICAL THERHO-LAG RACEWAY INTERFACING WITH PENETRATION SEAL THREE HOUR 2-h" PANELS 2-17 8 SELF SUPPORTING THERMD-LAG SYSTEM APPLICATION FOR WALLS OR CEILING USE ONE HOUR h" PANELS 2-18 9 SELF SUPPORTING THER)O-LAG SYSTEM APPLICATION FOR WALLS OR CEILING USE THREE BOUL 1" PANEL 2-19 10 SELF SUPPORTING THERIO-LAG SYSTEM APPLICATION R)R WALLS OR CEILING USE .

THREE HOUR 2 " PANELS 2-20 11 TYPICAL CABLE TRAY AND SUPPORTS, THREE HOUR SYSTEM 2-21 vi 3- . _

l TSI TECHNICAL NOTE 20684-BV LIST OF FIGURES )

l CONTINUED FIGURE NO. TITLE PAGE NO.

" TYPICAL" INSTALLATION DETAILS l

12 THERMO-LAG 330 FIRE BARRIER SYSTEM PREFABRICATED PANEL DESIGN 4-4 13 THREE HOUR FIREWALL ASSEMBLY 4-7 l l 14 THERMO-LAG STRESS SKIN TYPE 330-69 TYPICAL LAYOUT FOR CABLE TRAY SECTIONS 4-9 15 THERMO-LAG STRESS SKIN TYPE 330-69 INSTALLATION SCHEMATIC PRIOR TO THERMO-LAG 330-1 SUBLIMING MATERIAL APPLICATION 4-10 16 CROSS SECTIONAL VIEW OF THE THERMO-LAG 330-1 SUBLIMING COATING ENVELOPE SYSTEM l APPLIED TO A CABLE TRAY 4-12 17 THERMO-LAG 330 FIRE BARRIER SYSTEM DIRECT SPRAf OVER STRESS SKIN DESIGN FOR CONDUIT, CABLE DROPS AND INSTRUMENT TUBING, ONE HOUR DESIGN 4-16 18 THERMO-LAG 330 FIRE BARRIER SYSTEM DIRECT SPRAY OVER STRESS SKIN DESIGN FOR CONDUIT, CABLE DROPS AND INSTRUMENT TUBING THREE i

HOUR DESIGN 4-19 k

l l

vii

A i'

j i

TSI TECHNICAL NOTE 20684-BV l

{

l THERMO-LAG 330 FIRE EARRIER SYSTEM. I 1

INSTALLATION PROCEDURES MANUAL NUCLEAR PLANT APPLICATIONS 1

l I

q SECTION I 1 1

4 GENERAL DESCRIPTION ]

f i

i 1

l l

l 1

l.

1-0 l 1

9 SECTION I GENERAL DESCRIPTION

1.0 INTRODUCTION

This section describes the THERMO-LAG 330 Fire Barrier System and its material components. The System is comprised of THERMO-LAG Stress Skin Type 330-69 and THER}O-LAG 330-1 Subliming Material. The System may be installed as Prefabrica-ted Panels, Preshaped Sections, or by direct spray or trowel methods. It is used in nuclear- power plants to protect cable trays, conduit, air drops  ;

(cables in free space), junction boxes and structural supports and hangers.

2.0 FIRE BARRIER DESIGNS Fout (4) basic designs of the THERM 0-LAG 330 Fire Barrier System have applications in nuclear power generating installations. Two (2) of the designs are:

...... Prefabricated Panel Design ......

...... Preshaped Conduit Section Design ......

Each of these basic designs have been approved for installation in nuclear plant facilities by the American Nuclear Insurers and are installed in a number of plants accepted for operational licensing by the Nuclear Regulatory Commission.

The material components of each design are identical. Each of the two (2) designs are comprised of THERMO-LAG Stress Skin Type 330-69 and THERMO-LAG 330-1 >

Subliming Material. The designs are either prefabricated or preformed at the factory. ,

The following paragraphs highMBt the majo: ,eteps involved in installing these designs. The more deta;it sequential steps involved in installing these designs are described is 9 : tion II.

1-1

1 l

i 2.1 Prefabricated Panel Design l

)

The Prefabricated Panel Design is fabricated and installed at the jobsite' from THERMO-LAG 330-1 Prefabricated Panels. This installation involves cutting the.

number of sections required to form the Fire Barrier from the THERMO-LAG Prefabricated Panels and then mounting the sections on the entity to be protected using approved stainless steel tie wires or other_ approved fasteners. The assembly is completed by filling in the scored areas and joints with THERMO-LAG _330-1 Subliming Material - Trowel Grade. The Prefabricated Panel Design lends itself to installations in the nuclear power generating industry and is.used to protect cable trays, air drops (cables in l free space), conduit, instrumentation tubing, junction boxes, structural supports, hangers and fire walls. _ This design is preferred over alternative spray application designs in most nuclear power plant installa-tions because it eliminates the overspray protection requirements of the direct spray-on method.

1 2.2 Preshaped Canduit Section Design The Preshaped Conduit Section Design is shipped to the jobsite ready for- l

. installation. Installation icvolves mounting the preshaped conduit sections on I the conduit or cable drops to form cylindrical sections around the conduit or ,

cable drop, and then fastening the sections together with approved stainless '

steel tie wires or banding material. The precoating of the sections prior to _

installation and. the _ filling in of gaps or openings at the edges or joints of the assembled sections"is accomplished using THERMO-LAG 330-1^ Subliming Material - Trowel Grade, as required.

The Preshaped Conduit Section Design is used in the nuclear power generating industry to protect conduit, cable drops and instrumentation tubing. As with  !

the Prefabricated Panel Design, this design is also preferred over alternative spray application designs in most nuclear power plant installations because it j eliminates the overspray protection requirements of direct spray-on methods.

1-2 4

9 I

- w r-- r . -

e v +w

3.0 MATERIAL COMPONENTS The material components which are utilized in the various designs of the THERMO-LAG 330 Fire Barrier System are as follows:

l J

3.1 THERMO-LAG Stress Skin Type 330-69 This material provides the strong mechanical base for the THERMO-LAG 330-1 Subliming Material. It is comprised of a pretreated open weave, self.

stiffened, steel mesh and is used to provide an enclosure over cable trays, conduits and other items.

3." THERMO-LAG 330-1 Subliming Material This material provides the level of fire resistance specified for the inutallation. It is a water based, subliming, thermally activated fire resistive material which volatilizes at fixed temperatures, exhibits a volume increase through the formation of a multi-cellular matrix, and blocks heat to protect the substrate material to which it is applied.

This material can be supplied in a sprayable grade (THERMD-LAG 330-1 Subliming Material - Spray Grade) for direct spray-on applications, or in a trowel grade consistency (THERMO-LAG 330-1 Subliming Material - Trowel Grade) which is suitable for troweling or caulking type applications.- It is further used in the fabrication' of Prefabricated Panels and Preshaped or Preformed Sections.

1-3

l l

l 3.3 Approved Tie Wires and Banding l 1

ll The tie wires and banding materials for attaching the THERMO-LAG 330 Fire -)

Barrier System, as tested, are 18 gr.. minimum standard stainless steel wire l and 0.020 inch minimum by 1/2 inch miniasm standard stainless steel banding. -

Product data sheets and material refety data sheets for the THERMO-LAG 330 Fire Barrier System are shown in Parts 1.0 and 2.0 of Section III. A recommended on site quality control procedure is shown in Part 3.0. ,j

, A recommended list of installation tools are shown in Part 4.0 of Section III. i 4.0 Primary Raceway Supports and All Penetrations Into The THERMO-LAG 330 Fire Barrier System - Reconnendations i

l

1. . All structural steel supports forming a part or supporting 'the THERMO-LAG 330 fire barrier and the structures, systems and components contained therein which are important to safe shutdown should be protected to provide fire resistance equivalent to that required by the barrier.
e.
2. To prevent thermal shorts into the fire barrier system, all penetrations (i.e. secondary supports, electrical or seismic) into the fire barrier system, should be fire protected to the same level of fire resistance as the raceway for a distance of

, at least 18 inches minimum as measured from the outer surface of the fire barrier; covering all continuous paths. (A fire test report reg'rding a the eighteen inch (18") minimum fire ,

prctection requirement is presenti.d in TSI's Technical Note 84-12-181).

4 1-4

n-sa A- u. a _ , _ _ _ , _

  • - A- A. m s -

e TSI TECHNICAL NOTE 20684 BV THERMO-LAG 330 FIRE BARRIER SYSTEM INSTALLATION PROCEDURES MANUAL ,

NUCLEAR PLANT APPLICATIONS P

SECTION II INSTALLATION PROCEDURES I

l I

i

'l j

l I

I 1

1 2-0 l

I i

1 I

t P

SECTION II INSTALLATION PROCEDURES E

This section sets forth the sequential l steps involved in the. installation of' the THERMO-LAC 330 Fire Barrier System to cable trays, conduit, cable drops, juction boxes, structural supports, hangers, and fire walls.

1.0 PRE-APPLICATION PRACTICES i

1.1 Qualification of Contractor ,

The application sh'all be performed by a qualified contractor who has had prior training in applying the materials and who has the equipment required to perform the application..

1.2 Safety Precautions On site safety standards and TSI reco==anded standards.

I 1.3 Delivery i'

The THERMO-LAG 330 Fire Barrier System materials shall be delivered to the jobsite on pallets or in original containers which show ' the product name, color, name of the manufacturer, and in the cast of bulk material, the

~

expiration date.

i 1;4 Storage The THERMO-LAG 330 Fire Barrier System materials shall be stored off the ground when not in use in tntally enclosed and weather protected areas provided for this purpose.

2-1

l

  • l l

The Prefabricated Panels and Preshaped or Preformed Sections do not require any temperature protection. The Bulk tbterials such as THERMO-LAG 330-1 Subliming Material, trowel grade, shall be protected against freezing and I from temperatures above 100F.

l l

2.0 PREFABRICATED PANEL READY ACCESS DESIGNS FOR CABLE TRAYS Installation of the Prefabricated Panel Ready Access Design to cable trays involves cutting the number of sections required to form the Fire Barrier from one or three hour fire rated THERMO -LAG Prefabricated Panels, and then mounting the sections on the cable tray to be protected using approved stainless steel tie wires or other approved fasteners. The sequential steps involved in installing this fire barrier design onto the cable trays are described in the following paragraphs.

2.1 Installation of the One Hour Ready Access Fire Barrier Design 2.1.1 Cut a piece of material large enough to form the bottom section from a one hour rated Prefabricated Panel. The width of the bottom section shall be equal to the sum of the base and both flanges plus both sides of the cable tray. The length of the bottom section shall not exceed 6.5 feet since longer sections are unweidly and more difficult to install.

2.1.2 Form a rectangular shaped bottom section by making two 90 degree bends which provide for the side panels.

2.1.3 Cut a piece of macerial large enough to form the top section from a one hour rated Prefabricated Panel. The width of the top section shall be equal to the base plus both flanges of the cable tray, plus the thickness of each of' the two sides of' the bottom rectangular section.

2.1.4 Mount the rectangular shaped bottom section on the cable tray using approved stainless steel tie wires as is shown in Figure 1.

The recommended maximum spacing between the tie wires should not exceed 12 inches.

2-2

THERM 0'-LAG 330 FIRE BARRIER SYSTEM PRIFABRICATED PANEL READY ACCESS DESIGN POR CABLE TRAYS LADDER TRAY - BOTTOM SECIION DETAILS THERMD-LAG ONE OR THREE BOUR FIRE RATED PREFABRICATED PANEL SECTIONS

,M. .

1 u

- M'

-" ? .'

APPROVED STAINLESS *

~l"..#

  • P i

STEEL BANDING , j

.I

/  ;

w -,a. .. -. . . . /

- - t.

,,, si

' < m' -

/.- ,

f/4. .> ..!

- l c-e. . .

g .

i F;i :-

- *~

//# f'r.l

'j.2..

.'6 i .

1 1

- i,.:,s. o L. *.c. - ',*

, 1 4'e'

'O, .,x*

v

/ /// '

a * ;'

v.' .

, ks, . ',,

v. ,'o, w .a _ _. ._ - - - - . ~; - . y,
  • ~

.. ... . . . .. . . .. .. .. . . . p "TTPICAL" DISTALLATION DETAILS INC. 326 0 BRANNON.ST. LOUIS,MO.63139.

.a. MONE " * " * " * ** **" "J. puhtPIS.

    • . 2
  • 6
  • 8 4., ,
    • ===

IMk.KMU-LAU JJU s1M BAKR1f.R bIh11.4 IRE.FABRICAlt.u PANEL READY ACCESS DESIGN YIGURE 1

i l

l

. \

l 2.1.5 Attach the flat top section to the installed bottom section using  !

spproved stainless steel tie wires or banding as shown in Figure l

2. The recommended maximum spacing between the tie wires should not exceed 12 inches.

I 2.1.6 Attach additional top and bottom sections to previously installed sections by butt joining them together at their ends.  !

l l

2.1.7 Complete the installation by filling in the edges and joints with l THERMO-LAG 330-1 Subliming hbterial - Trovel Grade. I 2.2 Installation of the Three Hour Ready Access Fire Barrier Design 2.2.1 Using three hour fire rated Prefabricated Panels, form and mount a three hour ready access Fire Barrier onto the cable trays following ,

the procedures previously described in Steps 2.1.1 through 2.1.7. '

AS AN OPTION

?.2.2 Usic.g one hour fire rated Prefabtf:sted Panels, form and mount the ,

first layer of the Fire Barrier on the cable tray following the  !

procedures set out in Steps 2.1.1 through 2.1.7.

1 i

2.2.3 Following the procedure described in Steps 2.1.1 through 2.1.7, mount a second one hour fire rated Fire Barrier layer over the first layer previously installed in Step 2.2.2. This second layer shall be formed and mounted in such a manner that the THERMO-LAC Stress Skin l Type 330-69 is on the outside.

l 2-4 i

! TERHO-1.AG 330 FIRE BARRIER SYSTEM j PREFABRICATED PANEL READY ACCESS DESIGN FOR CAB 1.E TRATS t

LADDER TRAT TIRE BARRIER ASSEMBLY I

t.

TERMO-LAG ONE OR THREE BOUR FIRE RATED PREFABRICATED PANEL SECTIONS BANDING AI. TERNATE 2 i y . .. .... . /

APPROVED STAINLESS , r. ~ -

g g M .e .

ST. EEL BANDING ,

a. ..

n ."

f. // .f e .

j:. -

p 2,..,_

I. _ ...... . .

- 3 g::s 7 -

t---------- p. .

//// -

'.N.

. L. _ . _ - - . .

////  : :F

. L _ _. .

,s

((. .. .. .....

" TYPICAL" INSTALIATION DETAILS INC. 3260 BRANNON.ST. LOUIS,MO.63139

. NOME ~ ' " - ~ ~ "A rw e

~~

=a 2-7-84. As TERMO-LAG 330 FIRE BARRIER SYSTEM PRETABRICATEE PANEL RIADY ACCESS DESTfM i....

1 l

l .

3.0 PREFABRICATED PANEL DESIGN FOR JUNCTION BOXES Installation of the Prefabricated Panel Design on a junction box involves cutting sections of one or three hour fire rated THERMO-LAG Prefabricated Panel large enough to provide a rectangular shape around the junction box and then mounting the sections onto the junction box, using approved stainless steel bands or other approved fasteners. The sequential steps involved in installing the fire barrier design are described in the following paragraphs.

3.1 Installation of One Bour Fire Barrier Design FOR A SURFACE MOUh"MD JUNCTION BOX 1

3.1.1 Cut a section from a one hour fire rated Prefabricated Panel large enough to form the top, front and bottom panels and required top and bottom flanges of the fire barrier assembly. The width of the section shall be equal to the width of the junction box plus an additional 1/4 inch to provide for sufficient clearance when installed. The length shall be equal to the sum of the top, front and bottom of the junction box plus 2 flanges large enough to accomodate the approved fasteners and an additional 1/2 inch to provide sufficient clearance when installed.

3.1.2 . Score the Prefabricated Panel section to shape the top, front and bottom panels and two flanges of the fire barrier enclosure.

3.1.3 Form the top, f rent and botton panels and top and bottom flanges by .

making 90 degree bends.

l l

2-6 l l

l l

i l

l

- 3.1. 4 - Mount the formed section enclosure on the wall or ceiling using .l approved concrete fasteners. The concrete fasteners shall be j spaced at a maximum distance of 12 inches with at least two concrete fasteners being used per flange. The concrete fasteners shal,1 be site approved anchors of 1/4 inch diameter. All concrete anchors must conform to field construction procedures FCP-103 for installation. FCP should be reviewed to ensure that material will not be damaged, 3.1.5 Cut two sections from a one hour fire rated Prefabricated Panel for the side panels of the fire barrier enclosure. Cut holes for conduit penetrations in the top, front and bottom panels as required and then ,

cut the panel or panels into two pieces . to facilitate installation around the conduit. Mount the side panels on the installed top, front and bottom section enclosure using approved stainless steel banding. l 3.1.6 Complete the installation by filling all edges and joints with THERMO-LAG 330-1 Subliming Material - Trowel Grade.

FOR A JUNCTION BOX NOT SURFACE MOUNTED 3.1.7 Cut a section .from a one hour fire rated Prefabricated Panel large enough to form the top, front and bottom Fanels of the fire barrier assembly. The width of the section shall be equal to the width of the junction box plus an additional 1/4 inch to provide for sufficient clearance when. installed. The length shall be equal to the sum of the top, front and bottom of the junction box plus an additional 1/2 inch I.o provide sufficient clearance when ~ installed.

3.1.8 Score the Prefabricated Panel section to shape the. top, front and bottom panels of the fire barrier enclosure.

3.1.9 Form the top, front and bottom panels by making 90 degree bends.

3.1.10 Cut another section from a one hour fire rated Prefabricated Panel large enough to form the side and back panels of the fire barrier assembly.

Cut holes for conduit penetrations in the side and back panels as

, required and then cut the panel or panels into two pieces to facilitate installation around the conduit.

3.1.11 Score the Prefabricated Panel section to shape the side and back panels of the fire barrier enclosure.

2-7

, i i

3.1.12 Form the side and back panels by making 90 degree bends.

l 3.1.13 Mount the two fire barrier sections on the junction box and fasten the two sections together using approved stainless steel banding. l l

3.1.14 Complete the installation by filling all edges and joints with THERMO-LAG 330-1 Subliming Material - Trowel Grade. )

3.2 Installation of Three Bour Pire Barrier Design l

3. .: .1 Using a three hour fire rated Prefabricated Panel, form and mount a three hour fire barrier enclosure on the junction box following the procedures previously described in Steps 3.1.1 through 3.1.6.

l l

l l

l l

l 2-8 l 1

l l

l

d i

APPROVED STAINLESS STEEL RAIDS O

    • d 4

0 i l

[s'r h/p /

LAC ONE OR TEREE BOUR RATED FREFABRICATED PANEL SECTIONS

9 s' q \ ,

THERIO-LAC 330 FIRE BARRIER SYSTEM PREFABRICATED PANEL DESIGN FOR JUNCTION BOIES CUT TO FACILITATE INSTAT.T.ATION

, / AROUND' CONDUIT

,, . . . . D.

f& 4, auNCn 0N n0x C BOLE FOR

' CONDUIT OPENINC

~ 'l 8

8 8

a

.. .- s

.; _ =, I h_._.. .

h APPROYED ANCBOR BOLT

" TYPICAL" INSTALLATION DETAILS

, EdC. 3260 BRANNON.ST. Louts,MO.63!39.

=aw- NOME * *

  • *" **J. 0VWPts 2 8 4., . - .

THERMO-LAG 330 FIRE BARRIER SYSTEM PREFABRICAIED PANEL DESIGN FOR JUNCTION BOIES 1 .. . ... .....

~ - - - -- =

4.0 PRESHAPED CONDUIT SECTION DESIGN FOR CONDUIT, CABLE DROPS AND INSTRUMENT TUBING Installation of the THERMO-LAG Preshaped Conduit Section Design on conduit, cable drops and instrument tubing involves mounting two of the semi-circular preshaped conduit sections at a time, and fastening them together using approved stainless steel tie wires or banding. The sequential steps involved in installing this fire barrier design are described in the following paragraphs.

4.1 Installation of One Hour Fire Barrier Design 4.1.1 Precoat the edges on one of the one hour fire rated THERMO-LAG Preshaped Conduit Sections with a one quarter to a one half inch bead of THERMO-LAG 330-1 Subliming Material - Trowel Grade.

4.1.2 Mount the coated section and one other one hour fire rated section on the conduit, cable drop or instrument tube with the edges flush with )

each other to form a cylindrical section around the conduit, cable drop or instrument tube. Fasten the two sections together using approved stainless steel tie wires or banding installed at 12 inch intervals, maximum, as shown in Figure 4.

4.1.3 Apply a one quarter to one half inch bead of THERMO-LAG 330-1 Subliming Material - Trowel Grade to the end of the installed section, and attach the next section making sure that the ends are butted and flush.

l 1

l 2-10 I

i l

s e

THERMO-i.AG 330 PIRE BARRIER SYSTEM PRESHAPED CONDUIT SECTION DESIGN I

L POR CONDUIT. CABLE DROPS AND INSTRUMENT TUBING l 1

l APPROVED STAINLESS 'lk

  • l STEEL BANDING . .: -

.'i'

.c

. . . l

. s t.~.

? ;'

  • l

,,.G;..7- j.

V g,VQ' .,

.s l

eg'??- .- I

- .,..ff .-

.~ l

, .g, . ' " * ',.~

)

g .: -

.f.- l

, , $'

  • PRECAULK OR FILL IN WITH l

'fr~ ' . TEERMO-LAG 330-1 SUBLIMING l

m. ' e MATERIAL - TRDWEL GRADE ONLY l

,.T, ' '

e..6 ,. .

-f" WHEN REQUIRED s ..-

.. THERMO-LAG ONE OR THREE HOUR FIRE RATED

[h' "

i 1 6.}~* PRESHAPED CONDUIT SECTION

.. . f L

fa' APPROVED STADiLESS STEEL BANDING ed ,. l Cr'\DUIT, CABLE DROP Oh INSTRUMENT TUBING "ITPICAL" INSTALLATION DETAILS 51, INC. 326'O BRANNON.ST. Louts,S10.63!39

~

...moNE ~ * * "

~ ~ **A w as 2-7-84 M ~~*

TEERMO-LAG 330 FIRE BARRIER SYSTEM PRESEAPED CONDUIT DESIGN FOR CONDUIT, CABLE DROPS AND INSTRUMENT TUBING I*"*'"***-~

l

AS AN OPTION 4.1.4 Assemble two one hour Preshaped Conduit Sections on the conduit, cable drop or instrument tube without preapplication of the THEP30-LAG 330-1 Subliming Material - Trowel Grade to the edges and end joints. After installation, ' fill in, all gaps or openings at the . edges or joints'vith THERMO-LAG 330-1 'S'dbliming Material - Trovel Grade.

4.2 Installation of Three Hour Fire Barrier Design 4.2.1 Using the three hour fire rated THERMO-LAG Preshaped Conduit Sections, install a three hour fire barrier on the conduit, cable drop or instrument tube following the procedures previously described in Steps 4.1.1 through 4.1.3.

AS AN OPTION 4.2.2 Using the three hour fire rated Preshaped Conduit Section, install a three hour fire barrier on conduit, cable drop or instrument tube following the procedure described in Step 4.1.4.

2-12

5.0 INTERFACES j- Installation of cable tray, conduit and instrument tubing interfaces with penetration seals, walls, ceilings, and other racevsys is accomplished using either Prefabricated Panel or direct trowel on methods. Typical

_ installations using these methods are briefly described and illustrated in the.following paragraphs.

5.1 Installation of one or Three Bour Interfaces Between a Cable Tray or Conduit and a Penetration Seal 5.1.1 Cut and form a box shaped and flanged section from a one or three hour rated Prefabricated Panel as is shown in Figures 5, 6 and 7. ,

The minimum height of the flange. shall be sufficient to cover the wall opening and accomodate-approved concrete fasteners.

5.1.2 Mount the four sided and flanged section, installed at 12 inch intervals -

maximum, and two per flange minimum, on the cable tray or conduit using approved concrete fasteners to fasten the section to the concrete wall and approved stainless steel tie wires or banding installed at 12.

inch maximum intervals to secure the four sided section.

i 2-13

.-~- --w , . , - - - - ,.- y, , - w- - w ,

i I

l 4

5.2 Installation of one or Three Bour Self Supporting Interface  ;

Between Conduit or Instrument Tubing and a Wall or Ceiling i 5.2.1 Cut and form a three sided and flanged section from a one or three l' hour rated prefabricated panel as shown in Figures 8, 9,10. The minimum height of the flange shall be sufficient to provide for the concrete I f as teners.'

1 5.2.2 Mount the three sided and flanged section on the cable tray or conduit using approved concrete fastene'rs to secure the section to the wall or ceiling.

1 5.2.3 Apply a coating of THER}D-LAG 330-1 Subliming Haterial - Trowel i

Grade in a nominal dry film thickness of 1/2" -0 +1/8" for one hour protection and 1" -0 +1/4" for three hour protection to the edges and joints of the installed section using a trowel or stiff bristle brush to fill in any gaps or holes.

5.3 Installation of One and Three Hour Interface Between a Cable Tray and a Conduit 5.3.1 Install a one hour or three hour fire rated Prefabricated Panel Ready Access Design on the cable tray followine,the instructions given in Section 2.0 as is shown in Figure il.

4 2-14

s i

i  !

TROWEL GRADE 330-1 }/g e'e',4' e lp CONCRETE WALL (fill in as required) sg , , A .,e..p

.t

.e .

  • o PENETRATION SEAL

'a

.' , e ,, e ,

e.g / TRAY OR CONDUIT i . _

v . 4 . 4 ./. d. ./ .4 . x

, l f/ 7' / 7~/' 7 / 7 'l }

~

. seg .

y. E, _ , _ mf.e . . .

'~

.g .' . '.', .g

.x.-

o EN2EIE FASIENER e ', 4 t'.o .

s/Y.

r N-.' -x. . t a- x- . s- - ,ms...

i i

. M N l l A V

.l,

).77'7777y y lE e 2 **

L-- ,-- ]

e SECTION "A - A" 3

@C. 326 0 BRANNON.ST. LOUIS,HO.6 3139.

==.. 73 w TYPICAL THERMO-LAG' RACEWAY INTERFACING

=:-

W/ PENETRATION SEAL

~'

ONE HOUR %" PREFAB PANEL "fi~CU5d~S

TROWEL GRADE 330-1 CONCRETE WALL

    • f (fill in as required) a *'4'

.4 o o c .

O *e e

,-/ h .0 PENETRATION SEAL P :-We*,s

. .* , ou A**

"A" [  :

. TRAY OR CONDUIT rzzzz..J$ll J 4 -

i .

W p- :- -

u. . . .

, s 'a 1" Fi(EFABRICA2ED PANEL 4 s,,,,**8,,j* *

  • ae ,

03GEIE F

' p - - .:. - - - - - - -

9,

' V &ZZZZ/ZA ,

I hr .

TN ,

.t I

\ Yt I lN Ni i NXXXXXXXW '

.y ------

SECTION "A - A" l

3260 BRANNON AVENUE. 51 louts.

I5 I... -ss-3-1984 -

TYPICAL THERMO-LA6 RACEWAY INTERFArI-1 W/ PFNFTR ATTON SEAL THREE HOUR - 1" PANEL l 3i~ct[R1E

- . . - - - ~_- _ - - _ ..

i d

-+..+.,

    • *--CONCRETE WA1.L VGEL @AIE 330-1% b *. e 4-(fill in as required) ,
  • . A.,

J .

A) 4 , p e

  • Q s ?. ,,. 4 ,* , .e . ;,

"A" /. PENETRATION SEAL 3 3 3. . .x . 3

(), f TRAY OR CONDUIT s 1../.1. L .t. L t M T I

1, y 717 7'r y

  • 71:B y N _ N . A _ .i . .\. .'y "A" } ,
$ !A A e* ;,

t.e* w , s.,, sr . a*84 ,

2-Y' PREFABRICAIED PANEOS %j  :. e . .a t ...a .

EROU3E FASENER

., v , , , , , , , ,;1 -

N F s m. .x. x . s . x . s . , , i

/N l N) l iV H -

i g

V .

nI L.Nr7 I

. x x.

7 .- -

rv'1',1 x x _x x _s -. -

JNg _: .I.

SECTION "A - A" 3MO BRANNON AVENUE.ST L0urs I51..,. -ss-

~

'.:.: l ?l- . 3 3 2 / 6 IIr1 CAL TFIRr10-LAG RACEWAY INTERFACL

. g * -

l W! PENETRATION SEAL .

, . , , , , . . - y -

m w.-- , 3,,

t i

( .

+ 2' Max. M y

.U . '

THERMO-LAG 330-1 PREFABRICATED #:s,. k PANEL (Scored as required) ' .;< .,', ' t l

se

N %-

9 s y o X APP.'C.E j '

277.dl./E f,. a 8

M FM N

N -

j 3' Max.  % gy y s..

.o ,-

P

. v 4'c .

Y h /r/ 77/f .-

e o '.

. A ?'  !

= y a, . {

S o.' )

n :o; *

'IHEmO-IAG 330-1 'IRDIEL GWE ' t .*.

(fill in as required) )-

NOTE: Wall Floor Ceiling 3760 BRANNON AVENUE. ST LOUIS.

NI nun a vee *. rissouni$3m 3- 9-84 W **

SELF SUPPORTING THERMO-LAG SYSTEM APPLICATION FOR WALLS OR CEILING USE I, >_,o ONE HOUR - 1/2" PANEL l rimmr 8

__ 2 ' x.x .

y g:

q, l

THERMO-LAG 330-1 PREFABRICATED g '.'0j,'*.'

PANEUS-(Scored as required) ,. p,, g .(

-; 5'A (MV1 7:D xArram Asmax

%% % Y 8[#3

/. .

. ~ .. . .

3' Max.

/ i:{.p-

'l v /w*

/

wpm a

} k?$

I& Y Y'. - '

a.?

~ '

THDDD-IAG 330-1 ' BOWEL QWE 19i.r a.p t (Fill in as required) '*

NOTE: Wall Floor Ceiling 3260 BRANNON AVENUE. 51 louts.

MISSOURI $31Y

, . .,,,e . - ,- , . , .

3 8 4 E.//- "--**

  • 51,LF SUPPORTING THERMO-LAG SYSTEM APPLICATION FOR WALLS OR CEILING USE 2-19 I **,*T* C' THREE HOUR - 1" PANEL

_-. .-. . .. . .~

p 2' % $.

. s.

1 f

THERMO-LAG 330-1 PREFABRICATED 4 .: k O '.' ' '

PANEIS (Scmed as required) *

.ll I

.:J , ,A njjnzn Y Yx y

TW b.L

0. a : ..

s APPROVED CONCRETE 4 ,

c . FASTE N -

! . g *. .

  • l . . )

/y  :*-

3 ' E tx . .

p O= ff, RCmy 4

n m

4 4C-l 1 v 1

i '

(

k / "/ ~/ 7 /

y*9

( L X _Y X V 8

& 'Mr

'l g y'.-

. .i. .d -

r' I f.k

' DIE 2OO-IAC 330-1 'IROEL GRAIE . (!'

(fill in as required)' #'

NOTE: Wall Floor Ceiling l

3260 BRANNON AVENUE. ST. LOUIS.

5 v.. w

. . . . "'_SNI . ,N _

3-l 4 f4 f

~

SELF SUPPORTINGdMERMO-IAG SYSTEM-

= *==*

APPLICATION FOR WALLS OR CEILING USE 2-20 'IHREE 10R - 2 '" PAIEL9 l ~r'v~E*or Un'

//////// / / // / / / / // / :./ // /

- .. I : .. l . .. . g... vEarICa. suermr x . . .l:. . I.:. .

.. . 4 -

. t. -

I...l...L. 1 .

.,. man-tm umEE muR raErAsalCcEo Passt ..l..

l.

c i- l l . l. : -

..I.

.. l . f. . . . .

.,p .. 1.

.1:1.. ... i

..i.

i. - .,..
r ;, i, .. .lc. ,
g. ...~c . .. , .,

. . . f .. :..;; .... .. : 3:.g..

, ; ., , .. , r ,,

. . g. ..

1 ..

..l. 1

.j.!.. ..

.l- "l ,

. .< 4 CABLE TRAY E

.} . ~. .

.l'.1

-  : l '. 1. .j .

I' : j .] . .. 3 i .' :

1 I

. .. .u

. 3 e .- -

.1..* ..1; .. l '. :

..l.. jw a f%- -

.l...,.., :

  • l-

,.....u.

n.E..n. u....... .

. ,.... ..g.

.g

. . . . . . ., . . .___a. l gg . . ..

-w- . . . :.. .

. , r. ..lg.........

..;..l. .

g,.

~l,.[. : .:* g . .- . :. _ . . . .- . . .,.

.: \ . m .. .... . . . .. .. .l..

.. .:.l.... .

a - '

. .l .

[ -

.": 'g : . I g' d - .

...,g.- .- -

l. - .

18 - -

.l~ .l.

.- - l-

.'.Il..

inches e

KRI20 TEAL SUFM i L4n4, .

r

. j , .I.. . . .l.,

. . ,1 .

,'[, I[' . ,;, -

j/ -

- - j

.g .

i J[s THERto-1AG 330-1 l 1

'IPOWEL GADE +/OR '

THERMO-LAG THREE HOUR CONDUIT BARRIER FRErABRICMED PN l

l 9 l 1

\

i A

SECTION A 32so aRANNON AVENUE. ST LOUIS MtSSOURI 631.M I

v. . -

- ... N O N E " ** 3 * " "3 0' **' "

' j l

..3-l9-84 . (f ,

ggsb -. =

l TYPICAL: CABLE TRAY & SUPPORT THREE HOUR SYSTEM FIGURE 11 l

5.3.2 Install a one hour or three hour fire rated Preshaped Conduit section on a conduit or cable bundle penetrating a cable tray fire barrier for a minimum distance of eighteen inches from the point of penetration as is shown in Figure 11.

t 2-22 e

6.0 RIPAIR PROCEDURES The repair of a damaged section in a THERMO-1AG 330 Fire Barrier is easily accomplished by cutting out and removing the damaged material and then filling in the cut out section with new material.

The first step in this procedures is to remove the damaged and loose material using a knife and scraper. Care should be exercised that the damaged material is cut back until sound adhering material is reached.

Tne next step is to undercut the edges around the cut out section to form a beveled edge. All foreign ma'tter is then removed from the exposed substrate surface in the cut out section.

Finally, the THERMO-LAG 330 Subliming Material is sprayed or troweled into the cut out section. If necessary, several coats can be applied to achieve the desired film thickness. Care should be taken to allow for shrinkage of the repair patch by building up a slight dome shape on the surface of the patch.

2-23

7.0 CABLE REPLACEMENT PROCEDURES The replacement of a cable in a THERMO-LAG 330 Fire Barrier is accomplished by removing sections of tb2 fire barrier, replacing the cable, and then reinstalling the sections.

The first step in this procedure is to remove the required number of fire barrier sections by cutting away the material at the edges and the butt flanges.

)

liext, the stainless steel tie wires or banding are cut and the fire barrier section removed from the cable raceway. ,

After the defective cable has been replaced, the fire barrier sections are ,

reinstalled using approved stainless steel tie wires or banding. A coating of J THERMO-LAG 330-1 Subliming Material - Trowel Grade is then applied in the specified wet thickness to the edges and joints of the reinstalled sections using a trowel or stiff bristle brush to fill in any uncoated areas.

i 8.0 POST APPLICATION PRACTICES A clean and orderly condition shall be maintained in the installation area.

Following the application, all debris and equipoent and any overspray shall be removed and the area left in a condition acceptable to the owner.

2-24

P TSI TECHNICAL NOTE 20684-BV THERMO-LAG 330 FIRE BARRIER SYSTEM INSTALLATION PROCEDURES 'iANUAL NUCLEAR PLANT APPLICATIONS SECTION III TECHNICAL DOCUMENTATION s

3-0

e SECTION III PART I PRODUCT DATA SEETS 3-1 s

e

THERMO-IAC 330-1 SUBLIMING COMPOUND MTA SHEET PRODUCT DESCRIPTION: THERMO-LAG 330-1 is a water based, fireproofing, thermally activated, subliming and insulative coating.

When exposed to flame, the material volatizes at fixed temperatures exhibits a small volume increase through formation of a m21ti-cellular matrix: absorbs and blocks heat to Protect the substrate material.

TYPE: THERMO-1AG 330-1 Subliming Compound COLOR: Antiqua White FINISH: Textured OUTSTANDING FEATURES: Ease of Application Excellent exterior and interior durability No flash point or fire hazard Chemical Resistance No asbestes Rugged COMPOSITION AND PHYSICAL PROPERTIES:

SOLVENTS WATER Net Weight / gallon 1bs/ gal 10.5 i 0.5 Non volatile 66 Min.

Flash Point None Consistency Semi-solid, paste-like Warranted Shelf Life 6 Months Storage Conditions Above 32*F and Below 100*F 3-2

THERM-1AG 330-1 SUBLIMING COMPOUND DATA SHEET CONTINUED RASIC USE: THERMO-LAG 330-1 is applied to cable trays, cable drop and junction box assemblies, structural steel, su

. structures, containment vessels,pport tank cars, and other similiar entities.

THERMO-LAG 330-1 is applied to protect-the substrate against loss of structural stength and accessing temperatures during exposure to fire. One and multiple hour fire ratings een be provided as determined by test utilizing the ASTM E-119 time -

temperature .nvironment, hydrocarbon or chemical fire environments. 4 THERMO-LAG 330-1 Subliming Compound has also been tested per ASTM E84 Standards by an independent testine laboratory with the f~o11owing results:

Flame Spread 5 Fuel Contributed 0 Smoke Developed 15 COATING THICKNESS: The coating rhickness is a function of the specific weight of the steel to be protected.

The heavier tne steel, the thinner the coat-ing required for a given fire endurance rating. (Specific film thicknesses are specified by the owner or his duly authorized representative.)

PACKAGED: 55 gallon drums approximately 500 net .lbs.

THERMO-LAG 330-1 Sub11 ming Compound is su) plied in containers bearing Underwriters Laseratories labels.

STORAGE CONDITIONS: Store above 32*F and below 100*F.

l 1

.. i 3-3  !

THE100-LAG 330-1 SUBLIMING COMPOUND BATA SHEET CONTINUED

, SURFACE PREPARATION: 1. Surface sust be clean, dry and free from contaminants including oil, grease and scale prior to application.

2. THERMD-IAG 351 Primsr should be used as and where required.

MIIING: Material should be stirred to a homogeneous consistency prior to application.

TEMPERATURE / HUMIDITY: THERMO-LAG 330-1 Subliming Compound shall be applied in conformance with good paint-ing practices.- The surface shall be dry, ,

above 40*F and below the dew point.

METHOD OF APPLICATION: May be applied by airless spray, air atomiz-ing spray, brushing, rolling or caulking gun.

RECOMMENDED SPRAY EQUIPMENT: For spray application direct from the shipping container, air-ram (45:1 & 10:1

. compres,sion ratio) extrusion pump, airless sprey or air atomizing spray equipment should be used.

d 3-4 .

l

THERE-IAG STRESS SEIN TYPE 330-69 DATA SHEET PRODUCT DESCRIPTION: THERM 0-IAC Stress Skin Type 330-69 is comprised of an open weave, self stiffened steel mesh used to provide an anelosure over cables, cable trays, and cable drops and provide an easily accessible refurbishment of surfaces which possess adequate characteristics to receive the THERMO-MG 330-1 Subliming Material System.

THERMO-1AG Stress Skin Type 330-69 is

~

inherently resistant to differential

. thermal expansion, thermal stress, flutter, vibration and other type of loading - potentially resultant from earthquake conditions.

PHYSICAL PROPERTIES: THERM 0-1AG Stress Skin Type 330-69 shall be comprised of an open weave.

self stiffened steel mesh to meet the following characteristics:

Strand Diameter: 0.017 Inches Minimum Mesh Size: 56 Minimum Weight /Sq. Yd. 1.75 Lbs. Minimum Type "V" Stiffener dimensions:

Beight: .30

  • 0.05 Inches Base: .30
  • 0.05 Inches Spacing 6
  • 1.0 Inches CHEMICAL PROPERTIES: THERHO-1AG Stress Skin Type 330-69

, is chemically treated to provide

! reliable long lasting corrosion inhibiting properties.

. 7/82

, 3-5

4 4

THERMD-IAG STRESS SKIN TYPE 330-69 DATA SHEET CONTINUED BASIC USE: Theine-LAG Stress Skin Type'330-69 shall be installed in such a asnner .

as to provide a complete and continuous wrap over all areas to receive the THERMD-IAG 330-1 Subliming Material

. System, with the exception of junction boxes and structural support entities.

SURFACE PREPARATION: Prior to use, the substrate should be clean, free of loose dirt, grease and

, other cont ==inants. No s preparation is required. pecial surface METHOD OF APPLICATION: Best results are obtained if each individual length.of each individual section does not exceed 10 feet.

Each section should overlap each pre- t coding section by at least 6 inches or fastened to the preceding and following  :

section by a flange facsimile having a-1 inch lip, minimum. Circumferential1y, two sections are preferred. The skin shall be tight and all flanges and butt joints properly fastened. The sections should be secured to each other by using approved mechanical fastieners. The maximum distance between fasteners should be 6 inches.

3-6 5

'# a. , -

9 8 e SECTION III PART 2 MATERIAL SAFEIT DATA SHEETS 3-7 4

- e

J l

. . ,_, e , m . o. . . ,_,, . '"

. INDUSTRIAL HYGIENE SECTION MATERIAL SAFEIY DATA SilEET -

+

SECTION I esamuf actuman's Naast SMdaCENCT TELEPMoest seo.

TSI. Inc. 314 352-8422 aOo@tss thenbete $nsere Cusy 5se 3260 Brannon lven,ue.ne, eed LIV Code)St. Louis. No. 63139 Ca g ageg=gsmowms iaao g aw g a g _

    • '"'**' NN Resistive Coating ' '

Company Confidential SECTION ll HAZARDOUS INGREDIENTS I eaiNrs, enE1E RVATivEl, & SOLVENT $ Y

% g[',,9 ALLOY 1 AND METALuc COAT NGS S g 8j,',g P#CMENTS Sast MITat HP'OTHA 29CFR 1910.1000 Table E3 as l

vt M.C Lt MET ALLIC COafmGS P C T G OmCoat8Lua i ADOfffvts .

C _7T 9 a;nn, ls OTwins MAZARDou1 MIXTURES OF OTham wnf soLgos, ca cAggg S g g l

SECTION lli PHYSICAL DATA -

so Lmo comt fr.: se:Cse saavite sHg o:18 CIRCA 220 1.25 vaPos poissues - we.:

Water M"M*W 41 va on oeNseTT sam =in 'V^'*"*"

Water " ^ ^, ' , ' , Water sotve ur,e= =an" Miscible

"'"C'*" *

  • White Mastic - No appreciable order SECil0N .IV FIRE AND EXPLOSION HAZARD DATA etasa Pomt san e.e . se '"""'"*'

None TC'C *'

nj3 --

sismooisas=c Maosa y/A sPIClat osat isGNYsNG PnOCEDunts Unusual stag ANO ga LOstON HalaaDs i

I L1-413-1, industAbit Hygient Section, Material Data Safety Sheet, Olympia ll11 3-8 l

O SECIION III PART III RECOMMENDED ON SITE QUALITY CONTROL PROCEDURE 3-9

RECOMMENDED ON SITE QUALITY t CONTROL PROCEDURE The following is a recommended quality control procedure to be followed on site in the installation of the THERMO-LAG 330 Fire Barrier System.

RECEIVING PROCEDURES

1. Prefabricated Panels and Preshaped Conduit Sections
a. Make a visual inspection for damage.
2. THERMO-LAG 330-1 Subliming compound
a. Make a visual inspection for damage.
b. Read temperature recorder strip chart to verify that temperature limitations were not exceeded.
c. Test as an option that:
1. Weight per gallon is as specified la A-2 TQAPM.
2. pH valve is as specified in A-3 TQAPM.

INSTALLATION PROCEDURES .,

1. Insure that the proper one bour or three hour fire barrier design has been installed.
2. Check to see that the protected entity is completely enveloped.

Note: A concrete surf ace, such as a wall, ceiling or floor, can be a part of the envelope.

3. Check to see that the primary ' structural support of the protected entity is coated with the designated thickness to the point of attachment.
4. Insure that all seams and' joints are filled and sealed with THERMO-LAG 330-1 Trowel Grade in order to prevent flame penetration into the envelope system. >

3-10 ,

r

5. Check to see that all fasteners, such as banding, tie wire, nuts and bolts, and concrete fasteners, are of proper type and spacing.
6. Insure that all_ penetrations into the envelope are protected for a intnirm of 18 inches from the envelope with the same fire rating as the envelope.

i l

3-11

SECIION III PART 4 RECOMEDNED LIST OF INSTAT.T.ATION TOOLS 4

j 3-12 i

)

I 1

\

i

' 19 RECOMMENDED LIST OF INSTALLATION TOOLS The f ollowing is a recommended list of typical installation tools and equipment for installation of the THERMO-LAG 330 Fire Barrier System. These parts can usually be obtained from local suppliers.

Work Tables - 7'x4' ,

2" Nylon Brushes All Purpose. Caulking Guns Band Circle Saws with carbide blades Box Knives 1" Putty Knives 6" Putty Knives Wire Cutters Vice Crips

, Trowels - 1" co 5" Long Nose Pliers Work Cloves Dust Masks Goggles j Protective Clothing l

Organic and Particulate Matter Respirators 18 ga. Stainless Steel Tie Wire or Larger  !

l or l Stainless Steel Banding .020 x or Heavier l 1

9 E 3-13 l

l

-- _. l

I t-TSI TECHNICAL NOTE 20684-BV THERMD-LAG 330 FIRE BARRIER SYSTEM IFSTALLATION PROCEDUPJS MANUAL NUCLEAR PLANT APPLICATIONS F

l SECTION IV OPTIONS i

1 1

f

! 1

\

l 1

4-0 I 1

I i

-1.0 Direct Spray Over Stress Skin Design The Direct Spray Over Stress Skin Design consists of field fabrication of a Stress Skin envelope followed by a direct spray application of the THERMO-LAG 330-1 Subliming Material - Spray Grade. The fabrication of the Stress Skin envelope involves cutting the number of sections of-THERMO-LAG Stress Skin.

Type 330-69 required to form the Stress Skin envelope, and then mounting these sectione on the entity to be protected, using approved stainless steel tie wires or other approved fastening devices. The installed sections of Stresc Skin are then spray coated with the specified wet film thickness of THERMO-LAG 330-1 Subliming Material - Spray Grade. As an alternative, the fabricated sections of Stress. Skin may be spray coated prior to mounting. In either case, the coating must be spray applied in accordance with instructions given in Section II.

The Direct Spray Over Stress Skin Design lends itself to installation in the nuclear power generating industry where -the overspray protection requirement is not a consideration and is used to protect cable trays, conduits, cable drops, junction boxes, structural supports, hangers, and fire walls.

2.0 DIRECT SPRAY-ON DESIGN The Direct Spray-On Design is used for coating cables installed in a cable tray. This design involves spraying the cables and the inside and outside surfaces of the cable trays with a continuous film of the THERMO-LAG 330-1 Subliming Material - Spray Grade. This material should be spray applied in accordance with the instructions given in Section II.

The Direct Spray-On Design also is used to coat conduit where overspray protection is not a consideration. This design involves spraying the conduit surface with a continuous film of the THERMO-LAG 330-1 Subliming Material -

Spray Grade. The coating should be spray applied in accordance with the instruction given in Section II.

A special adaptation of the Direct Spray-On Design is the Direct Trowel-On i Design used for protecting cable tray and conduit supports. This design involves an initial brush or roller application of THERMO-LAG 351 Primer over the properly prepared surface of the support, followed by the trowel j application of THERMO-LAG 330-1 Subliming Material - Trowel Grade, in the j dry film thickness required to provide,the specified level of fire resistance. l The Direct Spray-On Design and its special adaptation are used in applications within the nuclear power industry to protect cable trays, structural supports and hangers.

4-1 1

3.0 THERMO-1.AG 351-2 Primer This is a highly efficient corrosion inhibiting primer which is applied. to properly prepared steel surfaces at a spread rate of circa 200 sq. ft. per- '

gallon. This material will be applied to structural supports and hangers prior to the application of the THERMO-LAG 330-1 Subliming Material.

4.0 THERMO-LAG 350 Two Part Topcoat This material provides excellent protection against water flow and climatic

- variations, chemical attack and physical abuse. It is applied at a spread rate of 50 sq. ft. per gallon.

r I

1 l

I O

4-2 i

y-y- -

m -. , - a _ - .- - m e- -

5.0 PREFABRICATED PANEL DESIGN FOR CONDUIT, CABLE DROPS AND INSTRUMENT TUBING Installation of the Prefabricated Panel Design on conduit, cable drops and instrument tubing involves cutting and forming box sections from one hour or three hour fire rated THERMO-LAG Prefabricated Panels, and then mounting the sections on the conduit, cable drop or instrument tubing to be protected, using approved stainless steel tie wires or other approved fasteners. The sequential steps involved in installing this fire barrier design are described in the following paragraphs.

5.1 Installation of One Hour Fire Barrier Design 5.1.1 Cut two equal sections from a one hour fire rated Prefabricated Panel which are large enough to enclose the conduit, cable drop or instrument tube. The width of each section shall be equal to two times the outer diameter of the conduit, cable drop or instrument tubing. The length shall not exceed 6.5 feet since longer sections are unwieldly and more difficult to install.

/

5.1.2 Form the two sided bottom fire barrier section, with the Stress Skin  ;

side facing inward, by making a 90 degree bend at the middle of the '

first section. l 5.1.3 Form the two sided top fire barrier section, with the Stress Skin side facing inward, by making a 90 degree bend at the middle of the first section. j l

l 5.1.4 Mount. the top and bottom fire barrier sections on the conduit, cable drop of instrument tube to form a box design and then fasten the two i l

sections together, using approved stainless steel bands as shown 1n Figure .12. l l

5.1.5 Attach addition top and bottom fire barrier sections to previously installed sections by butt joining them together at their ends.

5.1.6 Complete the installation by filling in the edges and joints with THERMO-LAG 330-1 Subliming Material - Trowel Grade. l l

1 l

4-3 1 1

. _ - - - _ _ - _ - _ _ _ _ _ _l

i 1

1

.THERMO-LAG 330 FIRE BARRIER SYSTD4 PREFABRICATED PANEL DESIGN FOR CONDUIT.

CABLE DROPS AND INSTRUMENT TUBING APPROVED STAINLESS S BANDS

,Q l

u.

- i i

.;- . 3 ,

g ,,;

1: - .. .". . THERMO-LAG ONE OR THREE HOUR

~

, p. - s.d'M - FIRE RATED PREFABRICATED PANEL

-5*

'O <, SECTIONS

\ .

4A 1. . > :,

s ','

CONDUIT, CABLE DROPS OR INSTRUMENT TUBING l

i l

l "TTPICAL" INSTALLATION DETAILS MC. 326O BRANNON.ST. Lout'S,MO.63!39

.MONE ~ * * * * "~* **J.Duuri' 2-7-84. s "'""

. _ I THERMO-LAG 330 FIRE BARRIER SYSTEM PRIFABRICATED PANEL DESIGN n..... .

FIGURt .n[2

, = - . . . --. - .- _ -

m 5.2 Installation of Three Bour Ready Access Fire Barrier Design 5.2.1 Using three hour fire rated Prefabricated Panels. form and mount a three hour fire barrier on conduit, cable drops or instrument tubing following the procedure previously described in Steps 5.1.1 *.hrough 5.1.6.

i l

/

4-5

6.0 PREFABRICATED PANEL THREE HOUR FIRE WALL DESIGN Installation of the Prefabricated Panel Design to form . ire vall involves cutting the required number of sections to form the fire vall from three hour fire rated THERMO-LAG Prefabricated Panels, and then mounting the sections on the expanded metal or other support material using approved #10 size minimum bolts, washers and nuts. The sequential steps involved in installing this fire barrier design on the fire vall support material are described in the following paragraphs.

6.1 Installation of Three Bour Fire Barrier Design 6.1.1 Cut two sections large enough to comprise a portion of the fire vall

. from one hour fire rated Prefabricated Panels.

6.1.2 Hount one section of the Prefabricated Panel on each side of the expanded metal or other steel support material for the fire vall with the Stress Skin side facing outvard, using approved #10 or larger bolt assemblies. The holes for the #10 bolt assemblies shall be drilled on 12 inch centers with the section of the Prefabricated Panel being held in place as shown in Pigure 13.

6.1.3 Apply sufficient amounts of THERMO-LAG 330-1 Subliming Material -

Trowel Grade, over the structural steel supports and the bolt head and nut of the bolt assembly.

AS AN ACCEPTABLE OPTION 6.1.4 Cut two sections of one hour fire rated Prefabricated Panel together with an identical section of expanded metal large enough to mount on the installed rectangular steel tubing or other structural steel entities.

6'. l . 5 Hount the expanded metal section on the rectangular steel tubing or other structural steel entities using approved mechanical fasteners.

4-6

I DIEI@D-IK 330-1 DEE00-1AG 330-1 or FREFABRICATED PANELS

(\" Mininun)

SIRESS SKIN

_w l -

Ed l

slwzMHM/MM/MMEHMUMMMb "

m . . , , . . . . . . - , . - , . . . - - . - -

. - , . - - - . . . - . ~ 1 vr1 W///////f////f/f/E/RMWEEE/W//EEEb d x g ty.A X s 5 I-

/

.~,

,. ;h;[ STRESS SKIN ./ ' .' .,, ' f-% }b,'.'

-$;g(l.%

? ' ..- DEltD-IAG 330-1 (\" Min.)

k *

':. . .~; ...~ ** 7.: *. . .

"'3 \ . 2.* THERMO-LAG 330-1 "J .* M T;k.$.f ,.

EXPANDED HET. AL 5-f.'-

"lTPICAL BOLTS .NUIS & WASHERS OR OIHER APPROVED FASIDERS

~

_. / __ ~

o ay W7

%W9 Vw

~w l

3260 BRANNON AVENUE. ST t. Outs.

g MISSOURI 63139

..,o,E . . . . _ , ,

... 3 8 4 f. -

W4 =* ***

/

THREE HOUR FIREWAY.f. AMRFMRIN , , , , , , , _ , , ,

7.0 DIRECT SPRAY OVER STRESS SKIN DESIGN FOR CABLE TRAYS Installation of the Direct Spray Over Stress Skin Design on cable trays involves fabricating and installing a protective envelope of THERMO-LAG Stress Skin Type 330-69, and then coating the Stress Skin envelope with a specified dry film thickness of the THERMO-LAG 330-1 Subliming Material - Spray Grade.

The sequential steps involved in installing the fire barrier design on cable trays are described in the following paragraphs.

7.1 Installation of One Bour Fire Barrier Design 7.1.1 Cut a piece of material large enough co form the bottom section from a sheet of Stress Skin, which is normally supplied in 4 ft by 8 ft sheets. The width of the bottem section shall be equal to the sum i of the base (w) and both sides (H) of the cable tray plus 3 inches, as shown in Figure 14. The length of the bottom piece of material shall not exceed 6.5 feet since longer sections are unwieldly and more difficult to install.

7.1.2 Cut a square ik inch piece from each corner of the bottom section of the Stress Skin.

7.1.3 Form a "U" shaped section by making two 90 degree bends along the dotted lines which are located at each end of the W + 1/2 inch din er.sion line shown in Figure 14.

l l

7.1.4 Form a 1k inch flange on each side of the bottom section by making a 90 degree bend along the dotted lines as shown in Figure 14.

7.1.5 Cut a piece of material large enough to form the top section from a sheet of Stress Skin, normally supplied in 4 ft by 8 ft sheets. The width of the top section shall be equal to the base (W) of the cable plus 2 inches.

7.1.6 Form a 1k inch flange at each end of the top section by making 90 degree bends along the dotted line shown in Figure 14.

4-8

4 l . .

THERMO-LAG 330 FIRE BARRIER SYSTEM STIF7INER "V" TYPE TOP SECTION

.P I

l

'I l 1

I I I l 1

I I

I I I I I I

l I

I BOTIOM SECTION .

l l

a A _ ._ _ , __ _ __ . __t I I a _. _ _ _ _ . _ .. _ .. _ _ . ___L I

I I

I 1

1 I I

I I

l I

_L_ . _. - . .__ ._.

I I I

i y _. __ _ ,

__p THERMO-LAG STRESS.SIIN TTPE 330-69 TTPICAL LAYOUI POR CABLE TRAY SECTIONS "TTPICAL" INSTALMTION DETAILS I INC. 326O BRANNON.ST. louts,MO.63t39.

f .MONE ~ ~' *" "* "J. puuP t!

*==

I 2-7-84. ~

f_- -

THERMO-LAG STRESS SKIN TTPE 330-69 TTPICAL LAYOU1 (

. FOR CABLE TRAY SECTIONS g .. . .

I FIGURE lt.

l l

THERHO-LAG 330 FIRE BARRIER SYSTEM APPROVED BOLTS FOR .

MOUNTIN ,

  • m o

e '

. s e

e 4 -

<, e e.

,  % "7" STIFFENERS BOTTOM e SECTION

' _ FLANCES TERMD-LAG STRESS SKIN TYPE 330-69 I INSTALLATION SCHEMATIC PRIOR TO TERMO-LAG 330-1 SUBLIMING MATERIAL APPLICATION l l

l I

" TYPICAL" INSTALLATION DETAILS l l

INC. 3260 BRANNON.ST. Louts,MO.63139.

==esa. OsO N E ~"*

""* "J. DtNPlS .:

2 = 7 - 8 4. === 5  !

THERMD-LAG STRESS SLIN TYPE 330-69 INSTALLATION SCHEMATIC PRIOR TO THERMO-LAG 330-1 SUBLIMLNG

" " * * * ~ ' "

  • MATERIAL APPLICATION FICURE 15 i

,I y

7.1.7 Mount the bottom and top sections of Stress Skin on the cable tray and fasten the two sections . together at a maximum of six-inch intervals, using approved mechanical fasteners, staples or 18 ga.

tie wire.

7.1.8 Attach additional bottom 'and top sections of Stress Skin to a previously installed section by fastening them together at the end flanges using approved mechanical fasteners, staples or 18 ga.-' tie ]

wire. i 7.1.9 Coat the bottom and top sections of Stress Skin with a nominal dry film thickness of 1/2" -0 +1/8 of the THERMO-LAG 330-1 Subliming .l Coating - Spray Grade, as shown in Figure 15. The coating shall be applied in accordance with instructions given in Paragraph 11.0 herein. .

WHEN COATING PRIOR TO MOUNTING l

7.'1.10 Coating the bottom and top sections of Stress Skin with a nominal dry l thickness of 1/2" -0 +1/8" of the THERMO-LAG 330-1 Subliming Coating -

I- Spray Grade, prior to mounting on the cable. tray. The coating shall

=be applied in accordance with instructions given in Paragraph 11.0 1 herein.

l l 7.1.11 Mount the bottom and top sections of the precoated Stress Skin on the l

cable tray and fasten the two sections together at a maximum of six i inch intervals using approved mechanical fasteners, staples or 18 ga.

tie wire.

7.1.12 Attach additional precoated bottom and top sections of Stress Skin

to'a previously installed section by fastening them together at the l end flanges using approved mechanical fasteners, staples or le ga.

tie wires.

l l

7.1.13 Apply a coating of THERMO-LAG 330-1 Subliming Material - Trowel Grade in a nominal dry film thickness of 1/2" -0 +1/8" to the edges and joints of the precoated sections of Stress Skin using a trowel or stiff bristle brush to fill in any gaps or fastening holes.

j

[

1 l

4-11 l

l

TERMO-LAG 330 FIRE EARRIER SYSTEM

?

THERMO-LAG 330-1 SunLIMING MATERIAL

/

/

~

/

THERMO-LAG STRESS SKIN TYPE 330-69 CABLES CROSS SECIIONAL VIEW OF TE THERMO-LAG 330-1 SUBLIMING COATING ENVELOPE SYSTEM ,

APPLIED TO A TYPICAL CABLE TRAY .

" TYPICAL" INSTALLATION. DETAILS gC. 3260 BRANNON.ST. Louts,MO.63139.

.NONE ~ " " *

"*** "J. 00MPis .

2- 8-84 - ~ =

CROSS SECTIONAL VIEW OF TE THERMO-LAG 330-1 SUBLIMING COATING EhTELOPE SYSTEM APPLIED TO A TYPICAL CABLE TRAY

"'Q ]*

7

7.2 Installation of Three Bour Fire Barrier Design 7.2.1 Form the first layer bottom and top sections from a sheet of Stress Skin which is normally supplied in 4 ft by 8 ft sheets, following the procedures previously described in Steps 7.1.1 through 7.1. 7.

7.2.2 Fabricate the second layer bottom section from a sheet of Stress Skin, which is normally supplied in 4 ft by 8 ft sheets. The width of the second bottom section shall be equal to the sum of the base (W) and both sides (R) of the cable tray plus 713/16 inches.

/

7.2.3 Cut a square 211/16 inch piece from each corner of the second bottom section of Stress Skin.

7.2.4 Form "U" shaped sections from the second layer bottom section by making 90 degree bands along the dotted lines which are located at each of the W + 1 13/16 inch dimension line.

7,2.5 Form a 211/16 inch flange or each side of the second layer bottom section by making a 90 degree bend along the dotted lines as shown in Figure 14.

7.2.6 Cut a piece of material large enough to fons the second layer top section from a sheet of Stress Skin, which is normally supplied in 4 f t by 8 f t sheets. The width of the second layer top section shall be equal to the base (W) of the cable tray plus 7 5/16 inches.

7.2.7

. Form a 211/16 inch flange at each end of the second layer of Stress Skin by making 90 degree bends along the dotted lines shown in Figure 14.

7.2.8 Mount the first layer bottom and top sections of Stress Skin on the cable tray and fasten the two sections together at a maximum of 18 inch intervals using approved-mechanical fasteners, staples or 18 ga. tie wire.

l 1

l 4-13 )

l l

l 1

l

_-_--___---__----_-_-___-____-l

s 7.2.9 Attach additional first layer bottom and top sections of Stress Skin to a previously installed first layer section by fastening them together at the flanges using approved mechanical fasteners, staples, or 18.ga. tie wire.

7.2.10 Coat the first layer bottom and top section of Stress Skin with a nominal dry film thickness of 1" -0 +1/4" of THERMO-LAG 330-1 Subliming Coating - Spray Grade. The coating shall be applied in accordance with instructions given in Paragraph 11.0 herein.

7.2.11 Mount the second layer bottom and top sections of Stress Skin on the

~

cured layer of THERMO-1.AG 330-1 Subliming Material - Spray Grade, and fasten the two sections together n. a maximum of 12 inch intervals, using approved mechanical fasteners, staples or 18 ga.

tie wires.

7.2.12 Coat the second layer bottom and top sections of Stress Skin with a nominal dry film thickness of 1" -0 +1/4" of THERMO-LAG 330-1 Subliming Material - Spray Grade. The coating shall be applied in accordance vir.n instructions given in Paragraph li,oherein.

WHEN COATING PRIOR TO MOUNTING

^

7.'2.13 Coat the first layer bottom and top section cf Stress Skin with a nominal dry film thickness of 1" -0 +1/4" of THERMO-LAG 330-1 Subliming Material - Spray Grade, and place taem coated side up on the floor on a flat-surface. The coating shall be applied in accordance with instructions given in Paragraph il.0 herein.

7.2.14 Place the second layer bottom section of Stress Skin on the cured first layer bottom section and the second layer top section of Stress Skin on the cured first layer top section.

7.2.15 Coat the second layer bottom and top sections of Stress Skin with a uominal dry film coating thickness of 1" -0 +1/4" of THERMO-LAG 330-1 Subliming Material - Spray Grade. The coating shall be applied in accordance with instructions given in Paragraph 11.0 herein.

4-14

I 7.2.16 Hount the precoated bottom and top sections on the cable tray and fasten the two sections together at a maximum of 12 inch intervals l

using approved mechancial fasteners, staples or 18 ga. tie wire.  !

i 7.2.17 Attach additional precoated bottom and top sections to a previously j installed section by fastening them together at the end flanges using l

approved mechanical fasteners, staples or 18 ga. tie wire.

l l

7.2.18 Apply a coating of THERMO-LAG 330-1 Subliming Material - Trowel Grade )

l in a nominal dry film thickness of 1" -0 +1/4" to the edges and joints  !

l of the precoated sections using a trowel or stiff bristle brush to i fill in any gaps or fastening holes.

)

8 .- 0 DIRECT SPRAY OVER STRESS SKIN DESIGN FOR CONDUIT, CABLE DROPS AND e INSTRUMENT TUBING 1

l Installation of the Direct Spray over Stress Skin Design on Conduit, Cable Drops and Instrument Tubing involves fabricating and mounting two semi-circular shaped enclosures of THERMO-LAG Stress Skin Type 330-69 on the conduit, cable drop and instrument . tubing, and then coating the enclosures with a specified dry film thickness of THERMO-LAG 330-1 Subliming Material - Spray Grade. The sequential steps involved in installing this fire barrier de. sign on conduit, cable drops and instrument tubing are described in the following paragraphs.

8 '.1 Installation of One Bour Fire Barrier Design 8.1.1 Cut two equal sections large enough for enclosing the conduit from a i sheet of Stress Skin, normally supplied in 4 ft by 8 ft sheets. The vidth of each section shall be equal to one half of the diameter of the conduit, esble drop or instrument tube plus one inch. The length shall not exceed 6.5 feet since longer sections are unwieldly and more difficult to install.

8.1.2 Form a semi-circular section with edge L uges from each of the two pieces by making two 90 bendr. at a distr. ace of 1/2 inch from each edge of the width dimensions as is shown in Figure 17. l I

4-15

o FIGURE 17 THERMO-LAG 330 FIRE BARRIER SYSTEM DIRECT SPRAY OVER STRESS SKIN DESIGN FOR CONDUIT, CABLE DROPS AND INSTRUMENT TUBING I

ONE HOUR DESIGN i

l i

i THERMO-LAG 330-1 Subliming Material 4 Applied Over THERMO-LA Stress Skin Type 330-6 l

[ (/ Conduit, Cable Drop y , or Instrument Tubing 9 h,W 4 h". 9" f l

4-16

e e

8.1.3 Form a 1/2 inch flange on the length edges of each of the two pieces, where required, by making a 90 bend.

8.1.4 Coat the bottom and top sections of Stress Skin with a nominal dry film thickness of 1/2" -0 +1/8" of the THERMO-LAG 330-1 Subliming Material - Spray Grade prior to mounting on the conduit, cable' drop or instrument tube.

8.1.5 Hount the two sections of the precoated Stress Skin on the conduit and fasten the two sections together at a maximum of twelve inch intervals using mechanical fasteners, staples, or 18 ga. stainless steel tie wires.

8.1.6 Attach additional coated top and bottom fire barrier sections to previously installed sections by butt joining them together at their ends.

8.1.7 Complete the installation by filling in the edges and joints with THERMO-LAG 330-1 Subliming Material - Trowel Grade. The minimum cross sectional thickness of the troweled or caulked edges and joints should be 0.5 inches.

~

8.2 Installation of Three Bour Fire Barrier Design 8.2.1 Form the first layer bottom and top sections of precoated Stress Skin following the procedures previously described in Steps 8.1.1 through 8.1.4.

8.2.2 Cut and form the second layer bottom and top semi-circular sections with edge flanges from a sheet of Stress Skin, allowivg sufficient increase in dimensions to provide for mounting over the precoated first layer of Stress Skin.

14-17

4 8.2.3 Coat the first layer bottom and top sections of Stress Skin with a nominal dry film thickness of 1/2" -0 +1/8" of THERMO-LAG 330-1 Sublir.ing Material - Spray Grade, and place them coated side up on a flat surface on the floor. The coating shall be applied in accordance with instructions given in Paragraph 11.0 herein.

8.2.4 Place the second layer bottom section of Stress Skin on the cured >

first layer bottom section and the second layer top section of Stress Skin on the cured first layer top section.

i 8.2.5 Coat the second layer bottom and top sections of Stress Skin with a . !

nominal dry film thickness of 1/2" -0 +1/8th of THERMO-LAG 330-1 -Sublir. int {

Material - Spray Grade. The material shall be applied in accordance I scLth instructions given in Paragraph 11.0.

8.2.6 Mount the coated bottom and top sections on the conduit, cable drop -

or instrument tube and then lace the two sections together at

, the flanges using approved stainless steel tie wires as shown in Figure 18.

8.2.7 Attach additional coated top and bottom fire barrier sections to previously installed sections by butt joining them together at their ends.

8.2.8 Complete the installation by filling in the edges and joints with THERMO-LAG 330-1 Subliming Materic] - Trovel Grade. The minimum cross ' sectional thickness of the troweled or ' caulked edges and joints should be 1.0 inches, i

4-18

i'. .'

FIGURE 18 THERMO-LAG 330 FIRE BARRIER SYSTEM DIRECT SPRAY OVER STRESS SKIN DESIGN FOR CONDUIT, CABLE DROPS AND INSTRUMENT TUBING THREE HOUR DESIGN THERMO-LAG 330-1 j '

Subliming Material Applied Over THERMO-LAG 4

- Stress Skin Type 330-69 9

Conduit, Cable Drop g f [ (/

j, or Instrument Tubing

, 2/ s/ ,

y. } /
  • Si J ,

9 9

4-19

o 9.0 DIRECT SPRAY OVER EXPANDED METAL THREE HOUR FIRE WALL DESIGN Installation of the Direct Spray over Stress Skin Three Hour Design to form a Fire Wall involves coating both sides of the expanded metal or other steel support material with THERMO-LAG 330-1 Subliming Material - Spray Grade, and then applying THERMO-LAG Stress Skin Type 330-69 to the wet surfaces on each side. The sequential steps involved in installing this fire barrier design on the fire wall support material are described in the following paragraphs.

9.1 Installation of Three hour Fire Barrier Design 9.1.1 Attach the expanded metal to the structural steel framing in those cases where expanded metal is required.

9.1.2 Prepare the surface on both sides of the expanded metal or other steel support material for application of the THERMO-LAG 351-2 Primer by removing any dirt, scale, rust or other contaminants. Never apply the primer directly over any hard or glossy painted surfaces without roughening the surface in accordance with standard painting practices.

9.1.3 Apply the THERMO-LAG 351-2 Primer to both sides of the properly prepared expanded metal or other steel support material using spray equipment or a roller. The Primer shall be applied in accordance with instructions given in Paragraph 11.0 herein.

9.1.4 Coat both primed sides of the expanded metal or other steel support material with THERMO-LAG 330-1 Subliming Material - Spray Grade.

The coating shall be applied in accordance with instructions given in Paragraph 11.0 herein.

9.1.5 Apply THERMO-LAG Stress Skin Type 330-69 to the wet surfaces on each side after the final pass and use a roller to flatten out any wrinkles and to embed the Stress Skin securely. Then apply sufficient THERMO-LAG 330-1 Subliming Mate' rial - Spray Grade, to cover the embedded THERMO-LAG Stress Skin.

4-20

t .

/ O OR WHEN COATING PRIOR TO MO N TING 9.1.6 Cut two identical sections of THERMO-LAG Stress Skin large enough to comprise a portion of the fire vall.

e 9.1.7 Coat two sections of the THERMO-LAG Stress Skin with THERMO-LAG 330-1 Subliming Material-Spray Grade, in the required noninal dry film coating thickness of 1/2",-0 +1/8". The material shall be applied in accordance with instruction given in Paragraph 11.0 herein.

9.1.8 Hount the two sections of coated Stress Skin with their Stress Skin sides facing outward on the expanded metal or other steel aupport material using _approyed #10 size minimum bolts, vashers and nuts.

The holes, which may be counterbored as an approved option, for the approved #10 bolt assemblies are to be drilled on 12 inch centers with the two coated sections being held in place.

9.1.9 Apply sufficient amounts of THERMO-LAG 330-1 Subliming Material -

Spray Grade, in the required dry film thickness to fill the counterbore holes.

OR AS AN ACCEPTABLE OPTITI 9.1.10 Cut two identical sections of Stiess Skin together with an identical section of expanded metal large enough to mount on the installed rectangular steel tubing or other structural steel entities.

9.1.11 Coating the expanded metal with a nominal dry film thickness of 1/" -0 +1/ l of the THERMO-LAG 330-1 Subliming Material - Spray Grade. The coating sha '

be applied in accordance with instructions given in Paragraph 11.0 herein.

1 1

4-21 i

I