MONTHYEARML19344D8911979-11-15015 November 1979 Cooling Towers as Obstacles in Bird Migrations Project stage: Other ML19312E8261980-06-13013 June 1980 Application for Amend to License NPF-3,modifying Ets. Eliminates Sections 2.1,2.2,2.3,3.1,4.0,5.4.1 Part a & Changes Table of Contents,Lists of Figures & Table, & Section 1.0 of App B to Tech Specs Project stage: Request ML19312E8271980-06-13013 June 1980 Mod to ETS Eliminating Sections 2.1,2.2,2.3,3.1,4.0,5.4.1 Part a & Changing Table of Contents,Lists of Figures & Table, & Section 1.0 of App B to Tech Specs Project stage: Other ML19312E8241980-06-13013 June 1980 Forwards Application for Amend to License NPF-3,modifying ETS Project stage: Request ML19329F7821980-06-19019 June 1980 Notification of 800623 Meeting W/Util in Bethesda,Md to Discuss NRC Version of ETS Project stage: Meeting ML19344D8961980-06-30030 June 1980 Eia of Davis-Besse Nuclear Power Station,Unit 1 on Aquatic Ecology of Lake Erie, 1973-1979 Project stage: Other ML19344D8881980-08-22022 August 1980 Forwards Repts, Cooling Towers as Obstacles in Bird Migrations & Eia of Davis-Besse Nuclear Power Station,Unit 1 on Aquatic Ecology of Lake Erie, 1973-1979.Facility Has No Adverse Effects on Water Quality or Bird Population Project stage: Other ML19345G7361981-04-14014 April 1981 Responds to Util Forwarding Results of Nonradiological Environ Monitoring & Conclusion That Continued Monitoring in Four Areas Was No Longer Necessary. No Further Monitoring Required Re Bird Collisions Project stage: Other ML20033C8621981-11-25025 November 1981 Application to Amend License NPF-3,revising Tech Specs to Reflect Proposed Changes to Sys Integrity Measurements & Improved Iodine Monitoring Programs & Anticipatory Reactor Trip Sys Project stage: Request ML20033C8651981-11-25025 November 1981 Proposed Tech Specs 6.8.4,3.3.2.3,4.3.2.3 & Tables 3.3-15 & 4.3-15 Re Administrative Controls & Anticipatory Reactor Trip Sys Instrumentation.Safety Evaluation & Bases Encl Project stage: Other ML20033C8541981-11-25025 November 1981 Forwards Application to Amend License NPF-3 Project stage: Request ML20049J0691982-02-26026 February 1982 Eia & Negative Declaration Re Issuance of Amends 54 & 48 to Licenses DPR-42 & DPR-60,respectively Project stage: Approval ML20028C0831982-09-30030 September 1982 Environ Protection Plan (Non-Radiological) Project stage: Other ML20066G7271982-11-15015 November 1982 Responds to Re NUREG-0737 Tech Specs (Generic Ltr 82-16) Project stage: Other ML20149G9821982-11-29029 November 1982 Forwards Amends to Licenses DPR-42 & DPR-60,environ Appraisal & Notice of Issuance & Negative Declaration.Amends Delete App B Tech Specs & Including Certain Reporting Requirements Into App a Project stage: Approval ML20028C0781982-12-21021 December 1982 Requests Review of Encl Environ Protection Plan in Order to Prepare Rev to 800613 Application for Amend to Tech Specs. Response Requested by 830127 Project stage: Approval ML20083P1381983-01-11011 January 1983 Corrected Ltr Responding to NRC Re Proposed App B Tech Specs Project stage: Other ML20083P1181983-01-28028 January 1983 Forwards Corrected Re Proposed App B Tech Specs. First Paragraph Contained Incorrect Date Project stage: Other ML20071B4701983-02-22022 February 1983 Proposed Revs to Tech Spec Re Anticipatory Reactor Trip Sys,Boration Sys Temp & Corrections to Typographical Errors in Administrative Section Project stage: Other ML20071B4681983-02-22022 February 1983 Forwards Proposed Tech Spec Changes Re Anticipatory Reactor Trip Sys,Boration Sys Temp & Corrections to Typographical Errors in Administration Section Project stage: Other ML20069D8831983-03-11011 March 1983 Amend 55 to License NPF-3,deleting ETS Re Nonradiological Water quality-related Requirements Project stage: Other ML20069D8861983-03-11011 March 1983 Notice of Issuance & Availability of Amend 55 to License NPF-3 Project stage: Other ML20073Q3501983-04-20020 April 1983 Advises That NRC Resident Inspector Routinely Receives Monthly NPDES Repts,Repts of Unauthorized Discharges & Repts of Noncompliance W/Discharge Limits.Repts Will Be Sent to NRR Also Project stage: Other ML20024B6441983-07-0101 July 1983 Application for Amend to License NPF-3,proposing Changes to Tech Specs 3.0.3,4.0.3 & Bases Re Safety Sys Operability. Safety Evaluation Encl Project stage: Request ML20024B6411983-07-0101 July 1983 Forwards Application for Amend to License NPF-3,proposing Changes to Tech Specs 3.0.3,4.0.3 & Bases Re Safety Sys Operability.Class II Fee Transmitted by Project stage: Request ML20024B6451983-07-0101 July 1983 Proposed Tech Specs 3.0.3,4.0.3 & Bases Re Safety Sys Operability Project stage: Other ML20076F3601983-08-18018 August 1983 Application for Amend to License NPF-3 to Include Special Leakage Test Requirement for Containment Purge & Exhaust Isolation Valves.Safety Evaluation & Significant Hazards Consideration Encl Project stage: Request ML20076F3931983-08-18018 August 1983 Proposed Tech Specs Supporting Amend to License NPF-3 Re Leak Rate Requirement for Containment Purge & Exhaust Isolation Valves Project stage: Other ML20076F3381983-08-18018 August 1983 Forwards Application for Amend to License NPF-3 to Include Special Leak Rate Requirement for Containment Purge & Exhaust Isolation Valves Project stage: Request ML20094H1521984-07-25025 July 1984 Amend 73 to License NPF-3,adding New Tech Spec Sections 3.3.2.3 & 4.3.2.3 & Tables 3.3-15 & 4.3-15 to Reflect Addition of Final Anticipatory Reactor Trip Sys Project stage: Other ML20099L1511984-11-20020 November 1984 Proposed Tech Spec Changes,Revising Sections 3.6.1.2 & 4.6.1.2 Re Containment Leakage Rates Limiting Condition for Operation & Surveillance Requirements,Respectively Project stage: Other ML20099L1341984-11-20020 November 1984 Application for Amend to License NPF-3,revising Tech Spec Sections 3.6.1.2 & 4.6.1.2 Re Containment Leakage Rates Limiting Condition for Operation & Surveillance Requirements,Respectively Project stage: Request ML20099L1271984-11-20020 November 1984 Forwards Application for Amend to License NPF-3,revising Tech Spec Sections 3.6.1.2 & 4.6.1.2,in Response to NRC 821203 Request for Leak Testing to Detect Excessive Resilient Seal Deterioration.Fee Paid Project stage: Request ML20138B9661985-11-27027 November 1985 Amend 91 to License NPF-3,changing Tech Specs to Revise Min RCS Flow Requirement to Take Credit for Decrease in Core Bypass Flow Resulting from Use of Lump Burnable Poison Rods in Cycle 5 Design Project stage: Other ML20138B9701985-11-27027 November 1985 Safety Evaluation Supporting Amend 91 to License NPF-3 Project stage: Approval 1982-02-26
[Table View] |
Text
TDLEDO
%s EDISON RcHAno P. CnousE v<. nn.om ma Docket Nr. 50-346 m9 ess saai License No. NPF-3 Serial No. 979 August 18, 1983 Director of Nuclear Reactor Regulation Attention:
Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Stolz:
Under separate cover, we are transmitting three (3) original and forty (40) conformed copies of an application for Amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No.
1.
This application requests that the Davis-Basse Nuclear Power Station Unit 1 Technical Specifications, Appendix A and B, be revised to reflect the changes attached. The proposed changes involve:
1.
Section 3.6.1.2 2.
Section 3.3.3.2 3.
Sections 2.0, 2.1, 2.2, 2.3, 3.1, 4.0 and 5.4.1 Part A of Appendix B 4.
Section 3.6.3.1, Table 3.6-2 l
3.
Sections 3.0.3. and 4.0.3 and adds Section 3.0.5 i
6.
Revision to Radiological Technical Specifications (RETS) Section 4.3.3.10, Table 4.3-16, Item 3 f
The attachments identify the proposed changes and its safety evaluation l
aad significant hazard considerations.
Item I concerns a change to include a special leak rate requirement for the Containment Purge and Exhaust Isolation valves. The test will be performed each time when the q
valves are opened, if the valves have tot been tested during the last six months. This test will be performed in addition to the existing combined g,
and local leakage rate testing.
Item 2 concerns changes relating to the
\\fg incore detector instrumentation system used for calculation of the hot channel ~ factors.
Item 3 concerns deletion of Appendix B and submittal of g\\
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 8308260017 830818 PDR ADOCK 05000346
~P PDR
Docket No. 50-346' License No. NPF-3 Serial No. 979 August 18, 1983 Page 2 an Environmental Protection Plan.
Item 4 corrects a typographical error for the containment isolation valves in penetration #74B.
Item 5 provides for a shutdown of the unit, if required, due to equipment inoperability that places the plant both outside the Limiting Condition for Operation and the applicable Action Statement.
Item 6 relates to Radiological Effluent Technical Specifications concerning the source check requirement prior to using thy containment purge vent system.
This amendment request invs1ves three Class III, one Class II and revisions to two previous submittals. Therefore, it is determined to be a Class IV request and enclosed is a check for $12,300 as requested per 10CFR170.22.
Very truly yours,
[
c c - --
RPC: GAB Attachments cc:
DB-1 NRC Resident Inspector J. W. Harris, State of Ohio
{