MONTHYEARML19344D8911979-11-15015 November 1979 Cooling Towers as Obstacles in Bird Migrations Project stage: Other ML19312E8241980-06-13013 June 1980 Forwards Application for Amend to License NPF-3,modifying ETS Project stage: Request ML19312E8271980-06-13013 June 1980 Mod to ETS Eliminating Sections 2.1,2.2,2.3,3.1,4.0,5.4.1 Part a & Changing Table of Contents,Lists of Figures & Table, & Section 1.0 of App B to Tech Specs Project stage: Other ML19312E8261980-06-13013 June 1980 Application for Amend to License NPF-3,modifying Ets. Eliminates Sections 2.1,2.2,2.3,3.1,4.0,5.4.1 Part a & Changes Table of Contents,Lists of Figures & Table, & Section 1.0 of App B to Tech Specs Project stage: Request ML19329F7821980-06-19019 June 1980 Notification of 800623 Meeting W/Util in Bethesda,Md to Discuss NRC Version of ETS Project stage: Meeting ML19344D8961980-06-30030 June 1980 Eia of Davis-Besse Nuclear Power Station,Unit 1 on Aquatic Ecology of Lake Erie, 1973-1979 Project stage: Other ML19344D8881980-08-22022 August 1980 Forwards Repts, Cooling Towers as Obstacles in Bird Migrations & Eia of Davis-Besse Nuclear Power Station,Unit 1 on Aquatic Ecology of Lake Erie, 1973-1979.Facility Has No Adverse Effects on Water Quality or Bird Population Project stage: Other ML19345G7361981-04-14014 April 1981 Responds to Util Forwarding Results of Nonradiological Environ Monitoring & Conclusion That Continued Monitoring in Four Areas Was No Longer Necessary. No Further Monitoring Required Re Bird Collisions Project stage: Other ML20049J0691982-02-26026 February 1982 Eia & Negative Declaration Re Issuance of Amends 54 & 48 to Licenses DPR-42 & DPR-60,respectively Project stage: Approval ML20028C0831982-09-30030 September 1982 Environ Protection Plan (Non-Radiological) Project stage: Other ML20149G9821982-11-29029 November 1982 Forwards Amends to Licenses DPR-42 & DPR-60,environ Appraisal & Notice of Issuance & Negative Declaration.Amends Delete App B Tech Specs & Including Certain Reporting Requirements Into App a Project stage: Approval ML20028C0781982-12-21021 December 1982 Requests Review of Encl Environ Protection Plan in Order to Prepare Rev to 800613 Application for Amend to Tech Specs. Response Requested by 830127 Project stage: Approval ML20083P1381983-01-11011 January 1983 Corrected Ltr Responding to NRC Re Proposed App B Tech Specs Project stage: Other ML20083P1181983-01-28028 January 1983 Forwards Corrected Re Proposed App B Tech Specs. First Paragraph Contained Incorrect Date Project stage: Other ML20069D8831983-03-11011 March 1983 Amend 55 to License NPF-3,deleting ETS Re Nonradiological Water quality-related Requirements Project stage: Other ML20069D8861983-03-11011 March 1983 Notice of Issuance & Availability of Amend 55 to License NPF-3 Project stage: Other ML20073Q3501983-04-20020 April 1983 Advises That NRC Resident Inspector Routinely Receives Monthly NPDES Repts,Repts of Unauthorized Discharges & Repts of Noncompliance W/Discharge Limits.Repts Will Be Sent to NRR Also Project stage: Other ML20076F3601983-08-18018 August 1983 Application for Amend to License NPF-3 to Include Special Leakage Test Requirement for Containment Purge & Exhaust Isolation Valves.Safety Evaluation & Significant Hazards Consideration Encl Project stage: Request ML20076F3381983-08-18018 August 1983 Forwards Application for Amend to License NPF-3 to Include Special Leak Rate Requirement for Containment Purge & Exhaust Isolation Valves Project stage: Request 1982-12-21
[Table View] |
Text
.
7590-01 dNITED STATES NUCLEAR REGULATORY C0tNISSION DOCKET NO. 50-346 THE TOLEDO EDISON COMPANY AND THE CLEVELAND ELECTRIC ILLUMINATING COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendment No. 55 to Facility Operating License No. NPF-3, issued to The Toledo Edison Company and The Cleveland Electric Illuminating' Company (the licensees), which revised Tecnnical Specifications (TSs) for operation of the Davis-Besse Nuclear Power Station, Unit No.1 (the facility) located in Ottawa County, Ohio. The, amendment is effective as of its date of issuance.
The amendment deletes the Appendix B Environmental Technical Specifications (ETS) which pertain to nonradiological water quality-related requirements, as required by the Federal Water Pollution Control Act Amen @ients of 1972.
T' j
The application for the amendment complies with the standards and
}
requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regu?ations. The Commiss4i has made appropriate findings as required by the Act and the Commission's rules and regulatio's n
in 10 CFR Chapter I, which are set forth in the license' amendment. Prior public notice of this amendment was not required since the amendment does l
not involve a significant hazards consideration.
8303210055 030311 PDR ADOCK 05000346 i
P PDR
...\\
~
7590-01
,. l The Commission has determined that the issuance of this amendment is a ministerial action required as a matter of law and will not result in any significant environmental impact and pursuant to 10 CFR 51.5(d)(4),
an environmental impact statement, or negative declaration and environmental impact appraisal, need not be prepared in connection with issuance of the amendment.
For further details with respect to this action, see (1) the application for amendment dated June 13, 1980, (2) Amendment No. 55 to License No. NPF-3, and (3) the Commission's letter to Toledo Edison dated March 11, 1983 All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N.W., Washington, D'.C., and at the University of Toledo Library, Documents Department, 2801 West Bancroft Avenue, Toledo, Ohio 43606 A copy of items (2) and,(3) may be obtained upor. request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C.
- 20555, Attention: Director, Division of Licensing.
Dated at Bethesda, Maryland, this lith day of March 1983.
OR THE NUCLEAR REG LATORY COMMISSION
[
l Johr7. Stolz, Chief )
4 s
Ope ating Reactors BrYnch #4 l
1sion of Licensing i