Text
.
r TOLEDO
%mm EDISON FicHAno P. CROUSE
??l*
Docket No. 50-346 e,iasse m License No. NPF-3 Serial No. 1103 November 20, 1984 Director of Nuclear Reactor Regulation Attention:
Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Stolz:
Under separate cover, we are transmitting three (3) original and forty (40) conformed copies of an application for Amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No. 1.
This application requests that the Davis-Besse Nuclear Power Station Unit 1 Technical Specifications, Appendix A, be revised to reflect the changes attached. The proposed changes involve Section 3.6.1.2, 4.6.1.2 and Bases.
The attachments identify the changes, Safety Evaluation and Significant llazard Consideration for the Containment Isolation Valves (Purge and Exhaust). The proposed amendment request is in response to NRC request dated December 3, 1982 (Log No. 1143) for leak testing to detect excessive resilient seal deterioration.
Enclosed is a check for $150 as required by 10CFR170.12(C) for license application.
Very truly yours,
[dw RPC: GAB Attachment cc: DB-1 NRC Resident Inspector State of Ohio QCh cj a/14 8412010018 841120 PDR ADOCK 0$000346 i\\
P PDR qf[
THE TOLEDO EDIGON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43052 b