MONTHYEARML19344D8911979-11-15015 November 1979 Cooling Towers as Obstacles in Bird Migrations Project stage: Other ML19312E8241980-06-13013 June 1980 Forwards Application for Amend to License NPF-3,modifying ETS Project stage: Request ML19312E8271980-06-13013 June 1980 Mod to ETS Eliminating Sections 2.1,2.2,2.3,3.1,4.0,5.4.1 Part a & Changing Table of Contents,Lists of Figures & Table, & Section 1.0 of App B to Tech Specs Project stage: Other ML19312E8261980-06-13013 June 1980 Application for Amend to License NPF-3,modifying Ets. Eliminates Sections 2.1,2.2,2.3,3.1,4.0,5.4.1 Part a & Changes Table of Contents,Lists of Figures & Table, & Section 1.0 of App B to Tech Specs Project stage: Request ML19329F7821980-06-19019 June 1980 Notification of 800623 Meeting W/Util in Bethesda,Md to Discuss NRC Version of ETS Project stage: Meeting ML19344D8961980-06-30030 June 1980 Eia of Davis-Besse Nuclear Power Station,Unit 1 on Aquatic Ecology of Lake Erie, 1973-1979 Project stage: Other ML19344D8881980-08-22022 August 1980 Forwards Repts, Cooling Towers as Obstacles in Bird Migrations & Eia of Davis-Besse Nuclear Power Station,Unit 1 on Aquatic Ecology of Lake Erie, 1973-1979.Facility Has No Adverse Effects on Water Quality or Bird Population Project stage: Other ML19345G7361981-04-14014 April 1981 Responds to Util Forwarding Results of Nonradiological Environ Monitoring & Conclusion That Continued Monitoring in Four Areas Was No Longer Necessary. No Further Monitoring Required Re Bird Collisions Project stage: Other ML20049J0691982-02-26026 February 1982 Eia & Negative Declaration Re Issuance of Amends 54 & 48 to Licenses DPR-42 & DPR-60,respectively Project stage: Approval ML20028C0831982-09-30030 September 1982 Environ Protection Plan (Non-Radiological) Project stage: Other ML20149G9821982-11-29029 November 1982 Forwards Amends to Licenses DPR-42 & DPR-60,environ Appraisal & Notice of Issuance & Negative Declaration.Amends Delete App B Tech Specs & Including Certain Reporting Requirements Into App a Project stage: Approval ML20028C0781982-12-21021 December 1982 Requests Review of Encl Environ Protection Plan in Order to Prepare Rev to 800613 Application for Amend to Tech Specs. Response Requested by 830127 Project stage: Approval ML20083P1381983-01-11011 January 1983 Corrected Ltr Responding to NRC Re Proposed App B Tech Specs Project stage: Other ML20083P1181983-01-28028 January 1983 Forwards Corrected Re Proposed App B Tech Specs. First Paragraph Contained Incorrect Date Project stage: Other ML20069D8831983-03-11011 March 1983 Amend 55 to License NPF-3,deleting ETS Re Nonradiological Water quality-related Requirements Project stage: Other ML20069D8861983-03-11011 March 1983 Notice of Issuance & Availability of Amend 55 to License NPF-3 Project stage: Other ML20073Q3501983-04-20020 April 1983 Advises That NRC Resident Inspector Routinely Receives Monthly NPDES Repts,Repts of Unauthorized Discharges & Repts of Noncompliance W/Discharge Limits.Repts Will Be Sent to NRR Also Project stage: Other ML20076F3601983-08-18018 August 1983 Application for Amend to License NPF-3 to Include Special Leakage Test Requirement for Containment Purge & Exhaust Isolation Valves.Safety Evaluation & Significant Hazards Consideration Encl Project stage: Request ML20076F3381983-08-18018 August 1983 Forwards Application for Amend to License NPF-3 to Include Special Leak Rate Requirement for Containment Purge & Exhaust Isolation Valves Project stage: Request 1982-12-21
[Table View] |
Text
.
TDLEDO
%ms EDISDN Docket No. 50-346 Acst.ac D. CAOUSE vo emen License No. NPF-3 Nx+r I419)259 5221 Serial No. 619 June 13, 1980 Director of Nuclear Reactor Regulation Attention:
Mr. Robert N. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Reid:
Under separate cover, we are transmitting three (3) original and forty (40) conformed copies of an application for Amendment to Facility Oper-ating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No. 1, (DB-1).
This application requests a modification to Appendix B of the DB-1 Te;h-nical Specifications.
The proposed change includes elimination of Sec-tions 2.1, 2.2, 2.3, 3.1, 4.0, 5.4.1, part A and changes to Table of Contents, List of Figures, List of Tabics and Section 1.0.
This amendment request involves one change of the Class III type.
Enclosed is a check for S4,000.00 as required by 10CFR170.
Yours very truly,
,/QY f4 sk fi = ^ : **'
JSW:vlr Enclosure THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MAOISON AVENUE TOLEDO. OHIO 43652 8006170 f