MONTHYEARML19344D8911979-11-15015 November 1979 Cooling Towers as Obstacles in Bird Migrations Project stage: Other ML19312E8241980-06-13013 June 1980 Forwards Application for Amend to License NPF-3,modifying ETS Project stage: Request ML19312E8271980-06-13013 June 1980 Mod to ETS Eliminating Sections 2.1,2.2,2.3,3.1,4.0,5.4.1 Part a & Changing Table of Contents,Lists of Figures & Table, & Section 1.0 of App B to Tech Specs Project stage: Other ML19312E8261980-06-13013 June 1980 Application for Amend to License NPF-3,modifying Ets. Eliminates Sections 2.1,2.2,2.3,3.1,4.0,5.4.1 Part a & Changes Table of Contents,Lists of Figures & Table, & Section 1.0 of App B to Tech Specs Project stage: Request ML19329F7821980-06-19019 June 1980 Notification of 800623 Meeting W/Util in Bethesda,Md to Discuss NRC Version of ETS Project stage: Meeting ML19344D8961980-06-30030 June 1980 Eia of Davis-Besse Nuclear Power Station,Unit 1 on Aquatic Ecology of Lake Erie, 1973-1979 Project stage: Other ML19344D8881980-08-22022 August 1980 Forwards Repts, Cooling Towers as Obstacles in Bird Migrations & Eia of Davis-Besse Nuclear Power Station,Unit 1 on Aquatic Ecology of Lake Erie, 1973-1979.Facility Has No Adverse Effects on Water Quality or Bird Population Project stage: Other ML19345G7361981-04-14014 April 1981 Responds to Util Forwarding Results of Nonradiological Environ Monitoring & Conclusion That Continued Monitoring in Four Areas Was No Longer Necessary. No Further Monitoring Required Re Bird Collisions Project stage: Other ML20049J0691982-02-26026 February 1982 Eia & Negative Declaration Re Issuance of Amends 54 & 48 to Licenses DPR-42 & DPR-60,respectively Project stage: Approval ML20028C0831982-09-30030 September 1982 Environ Protection Plan (Non-Radiological) Project stage: Other ML20149G9821982-11-29029 November 1982 Forwards Amends to Licenses DPR-42 & DPR-60,environ Appraisal & Notice of Issuance & Negative Declaration.Amends Delete App B Tech Specs & Including Certain Reporting Requirements Into App a Project stage: Approval ML20028C0781982-12-21021 December 1982 Requests Review of Encl Environ Protection Plan in Order to Prepare Rev to 800613 Application for Amend to Tech Specs. Response Requested by 830127 Project stage: Approval ML20083P1381983-01-11011 January 1983 Corrected Ltr Responding to NRC Re Proposed App B Tech Specs Project stage: Other ML20083P1181983-01-28028 January 1983 Forwards Corrected Re Proposed App B Tech Specs. First Paragraph Contained Incorrect Date Project stage: Other ML20069D8831983-03-11011 March 1983 Amend 55 to License NPF-3,deleting ETS Re Nonradiological Water quality-related Requirements Project stage: Other ML20069D8861983-03-11011 March 1983 Notice of Issuance & Availability of Amend 55 to License NPF-3 Project stage: Other ML20073Q3501983-04-20020 April 1983 Advises That NRC Resident Inspector Routinely Receives Monthly NPDES Repts,Repts of Unauthorized Discharges & Repts of Noncompliance W/Discharge Limits.Repts Will Be Sent to NRR Also Project stage: Other ML20076F3601983-08-18018 August 1983 Application for Amend to License NPF-3 to Include Special Leakage Test Requirement for Containment Purge & Exhaust Isolation Valves.Safety Evaluation & Significant Hazards Consideration Encl Project stage: Request ML20076F3381983-08-18018 August 1983 Forwards Application for Amend to License NPF-3 to Include Special Leak Rate Requirement for Containment Purge & Exhaust Isolation Valves Project stage: Request 1982-12-21
[Table View] |
Text
3 4
TDLEDO Docket No. 50-346 EDISON License No. NPF-3
,%mo P. CnousE vc. pment WW Serial No. 894 u,91239322i January ll, 1983 John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing United States Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Stolz:
In response to your letter dated December 21, 1982 (Log. No. 1163) regarding proposed Appendix B Technical Specifications, the Toledo Edison Company requests an extension of six months from the pro-l posed date of January 27, 1983 to submit our response.
Toledo Edison requests to extend this response period to allow time for a thorough evaluation of the comments submitted by the Nuclear Regulatory Commission (NRC) regarding the submittal of our revised Appendix B.
Specifically, we will evaluate and respond to NRC comments concerning the proposed Environmental Protection Plan (EPP) in replacement of the Environmental Technical Specifica-tions (ETS) for the Davis-Besse Nuclear Power Station.
Toledo Edison will eval' ite the requirements of the Environmental Protection Plan and th IRC comments on previous studies conducted in compliance with Appendix B (ETS) of the Davis-Besse Technical Specifications. Our conclusions will be submitted on July 26, 1983.
Very truly yours, ff =
RPC:KLC:yml cc:
DB-1 NRC Resident Inspector hTR Project Manager THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 8302030395 830128 PDR ADOCK 05000346 p