ML20067A392
| ML20067A392 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 12/13/1984 |
| From: | Skelton R NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Miller W NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML082420195 | List:
|
| References | |
| FOIA-90-162 NUDOCS 9102070219 | |
| Download: ML20067A392 (2) | |
Text
_ --____
l-12/13/84 Docket No.:
05000528 i
MEMORANDUM FOR:
-William 0. Mil'ler, Chief.-
l License Fee Management Branch Office of Administration.
FROM:
R. Skelton.
Power Reactor SG Licensing Branch-Division of-Safeguards Office of Nuclear Materials a
Safety and Safeguards
SUBJECT:
COSTSANDMANHOURSFORLICENSINGACfl0N The contract costs incurred and manhours;used in. reviewing 1the application dated 01/21/80 are tabulated below for license No.
1.
Name:
Palo Verde 1 d
P.O. Box 21666 i
Phoenix, AZ 85036
(
2.
A) Casework-Control No.:05000528001P B) Mail Control No.-
C): TAC No.
-j 3.
A Periodcovered'(staff-hours) 01/21/80 '04/25/3T-B Completion date:
04/25/81 C
Amendment No.
4..
Contract costs associated with this application:
$ 0 #
periodcovered(contract. costs)
- I 5.
TAC work by other offices:' 0
-Hours 3
g. g,, g 6.
Hours during-reporting period:
5 8. 5 " -- =>
f mlidayh 9n,r a 43 -
)
p t h.r-7.
Fee Chargeable:
$2223 gj 8.
Total cos o pr ess application:
2223 r 3
Approved:
'A h
G. McCorkle C' GASKIN-Branch Chief Project-Manager
'b r
Power Reactor SG Licensing Branch g(Cj kk0[ofjl9900922 WLLJ AN90-162 PDR l
RUN DATE REGULATORY INFORMATION TRACKING SYSTEM 12/18/34 DETAIL LISTING OF HOURS REPORTED ON CASEWORK lt PERIOD COVERED:
01/21/80 04/25/81 PROJECT MANAGER; 4F SKELTON CASLWORK NUMBER: 05000528001P FACILITY NAME: PALO VERDE 1 DATE CLOSED:
04/25/81 NATURE OF ACTIVITY:
PALO VFRDE SITE FAMILIARIZATION VISIT REGULAR REVIEWER WEEK ENDING HOURS iHE FOLLOWING WERL CALCULATED AT : 38 $ PER HQUR GE GASKIN 02/02/80 11.0 GE GASKIN 02/09/80 1.0 GE GASKIN 02/23/80-10.0 PH MACMUROY 04/18/81 33.0 PH M%CMURDY 04/25/81 3.5 7
Cf.C I
C t-
-