ML20063G999

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 15 to License NPF-8
ML20063G999
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/17/1982
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20063G964 List:
References
NUDOCS 8209010264
Download: ML20063G999 (4)


Text

  • -

o 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-364 ALABAMA POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Comission (the Commission) has issued Amendment No. 15 to Facility Operating License No. NPF-8 issued to Alabama Power Company (the licensee), which revised Technical Specifications for operation of the Joseph M. Farley Nuclear Plant, Unit No. 2 (the facility) located in Houston County, Alabama. The amendment was effective on April 28,1982 for one-time only.

The amendment modifies the Technical Specifications for one time to extend a six hour time limit to nine hours to allow time to complete repairs and retests of the rod control system. The amendment was authorized on an expedited basis to maintain the plant at steady condition and avoid a shutdown transient shown by our evaluation to be unnecessary but required by the Technical Specifications unless amended.

The request for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Consnission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment l

was not required since this amendment does not involve a significant hazards 1

l consideration.

1 8209010264 82o817 PDR ADOCK 05000364 p

PDR

i 7590-01 The Commission has determined that the issuance of this amendment will not result in any significant envir,onmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

For further details with respect to this action, see (1) the request for amendment dated April 28,1982,(2) the Commission's letter dated April 30, 1982, (3) Amendment No.15 to License No. NPF-8, and (4) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N. W.,

Washington, D. C. and at the George S. Houston Memorial Library, 212 W. Burdeshaw Street, Dothan, Alabama 36303. A copy of items (2), (3) and (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C.

20555, Attention: Director, Division of Licensing.

Dated at Bethesda, Maryland, this 17th day of August 1982.

FOR THE NUCLEAR EGULATORY COMMISSION

(.

1

)

lk, Chiefk l

Steven A.

' Operating Reactors Brhndh No.1 Division of Licensing

E 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION l

DOCKET NO. 50-364 ALABAMA POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY-OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No.15 to Facility Operating License No. NPF-8 issued to Alabama Power Company (the licensee), which revised Technical Specifications for operation of the Joseph M. Farley Nuclear Plant, Unit No. 2 (the facility) located in Houston County, Alabama.

The amendment was effective on April 28,1982 for one-time only.

The amendment modifies the Technical Specifications for one time to extend a six hour time limit to nine hours to allow time to complete repairs and retests of the rod control system. The amendment was authorized on an expedited basis to maintain the plant at steady condition and avoid a shutdown transient shown by our evaluation to be unnecessary but required by the Technical Specifications unless amended.

The request for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules.and regulations. The Comission has made appropriate findings as required l

by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior public notice of this amendment was not required since this amendment does not involve a s'ignificant hazards consideration.

7590-01 The Comission has determined that the issuance of this amendment will not result in any significant envir,onmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

For further details with respect to this action, see (1) the request for amendment dated April 28,1982,(2) the Comission's letter dated April 30, 1982, (3) Amendment No.15 to Iicense No. NPF-8, and (4) the Comission's related Safety Evaluation. All of these items are available for public inspection at the Comission's Public Document Room,1717 H Street, N. W.,

Washington, D. C. and at the George S. Houston Memorial Library, 212 W. Burdeshaw Street, Dothan, Alabama 36303. A copy of items (2), (3) and (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Comission, Washington, D. C.

20555, Attention: Director, Division of Licensing.

Dated at Bethesda, Maryland, this 17th day of August 1982.

FOR THE NUCLEAR EGULATORY COMMISSION 1

f,

\\

!lBomQk,.Chie?

D f,k Steven A.

ta Operating Reactors Brhndh No.1 Division of Licensing i

!