ML20010A868

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amends 21 & 3 to Licenses NPF-2 & NPF-8,respectively
ML20010A868
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/31/1981
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20010A862 List:
References
NUDOCS 8108130038
Download: ML20010A868 (2)


Text

.

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50-348 AND 50-364 ~

ALABAMA POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 21 to Facility Operating License No. NPF-2 and Amendment No. 3 to Facility Operating License No. NPF-8 issued to Alabama Power Company (the licensee), which revised Technical Specifications for operation of the Joseph M. Farley Nuclear Plant, Unit Nos.1 and ?. (the facilities) located in Houston County, Alabama. The amendments dre effective as of the date of issuance.

The amendments grant temporary relief on a one-time only basis from diesel generator operability and surveillance frequency requirements to allow continued plant operation for six additional days during repairs to diesel generator 1C. The existing Technical Specifications allows a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> outage time.

The application for the amendments comply with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the. Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and Commission's rules and regulations in 10 CFR-Chapter I, which are set forth in the license amendments. Prior public notice of these amendments was not required since these amendments do not involve a significant hazards consideration.

8108130038 810731' PDR ADOCK 05000348 p

PDR l

1

7590-01 The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmen'tal impact statement or negative declaration and environmental impact ' ppraisal need not be prepared in connection with a

issuance of these amendments.

For further details with respect to this action, see (?) the request T

for amendments, dated July 31,1981,(2)' Amendment No. 21 to Licer4se No. NPF-2, (3) Amendment No. 3 to. License No. NPF-8, and (4) the Commission's related Safety Evaluation. All of these items are ivailable for public inspection at the Commission's Public Document Room,1717 H Street, N.W., Washingten, D.C. and at the Geo.rge S. Houston Memorial Library, 212 W. Burdeshaw Street, Dothan, Alabama 36303. A copy of items (2), (3) and (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D.C.

20555, Attention: Director, Division of Licensing.

Dated at Bethesda, Maryland, this 31st day of July,1981.

0

] THE NUC E$

EGULATORY COMMISSION fjdevenA.Varga,fNthelM%

ief

  • Operating Reactors ranch #1 Division of (icensing:

_ _ - _ - _ _ _ _ _ _ _ - _ - _ _ _ - _ _ _ _ _ _ _ _ - _ _