Tech Spec Change Request 86,supporting Amend to License DPR-72,App A.Change Matches Filter Testing Flow Rate W/Current Plant Conditions,Per Reg Guide 1.52,Revision 1
ML20062M682
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/11/1981
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20062M674 List:
References
RTR-REGGD-01.052, RTR-REGGD-1.052 TAC-47093, TAC-47463, NUDOCS 8112170402
Download: ML20062M682 (1)


Text

.

TECHNICAL SPECIFICATION CHANGE REQUEST NO. 86 Replace pages 3/4 6-23 and 3/4 6-24 of Appendix A with revised pages 3/4 6-23 and J

3/4 6-24.

, - K'

,x y

i Proposed Change Change references to the flow rate at which containment purge filters are tested from

's t,

"50,000 cfm + 10%" to " rated flow + 10%". In addition, the term " rated flow" is defined u

by footnote oli page 3/4 6-23.

~

"s.

s u

R_eason for hwd Change 1

The Crystal River Unit 3 containment purge valve position has been throttled to maintain (--

'N compliance with the NRC " Interim Position for Containment Purge and Vent Valve \\

p Operation Pending Resolution of Isolation Valve Operability," October 23, 1979. Under 4

these conditions,the previous flow rates cannot be met.

i.

(

i,,,

Safety Analysis This change would not adversely affect the safety of Crystal River Unit 3 since neither the Limiting Condition for Operation nor the frequency of the Surveillance Requirements will change. The change in the filter testing flow rate would be made only to reflect current plant conditions which are consistent with the NRC " Interim Position for Containment Purge and Vent Valve Operation Pending Resolution of Isolation Valve Operability," October 23, 1979.

This change does not involve an unreviewed safety question.