ML20041D151
| ML20041D151 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/18/1982 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20041D146 | List: |
| References | |
| TAC-47093, TAC-47463, NUDOCS 8203040367 | |
| Download: ML20041D151 (2) | |
Text
-
7590-01 UNITEi) STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-302 FLORIDA POWER CORPORATION, ET AL NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S, Nuclear Regulatory Comission (the Comission) has issued Amendment No. 52 to Facility Operating License No. DPR-72, issued to the Florida Power Corporation, City of Alachua, City of Bushnell, City of Gainesville, City of Kissimee, City of Leesburg, City of New Smyrna Beach and Utilities Comission, City of New Smyrna Beach, City of Ocala, Orlando Utilities Comission and City of Orlando, Sebring Utilities Comission, Seminole Electric Cooperative.
Inc., and the City of Tallahassee (the licensees) which revised the Technical Specifications (TSs) for operation of the Crystal River Unit No.
3 Nuclear Generating Plant (the facility) located in Citrus County, Florida. The amendnent is effective as of the date of issuance.
This amendment revises (1) the Auxiliary Building Ventilation Exhaust System Limiting Condition for Operation (LCO) and (2) the flow rate at which the containment purge filters are tested.
The applications for the amendment comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules end regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.
82J3040367 820218 PDR ALOCK 05000302 P
7590-01
. The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental -impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.
For further details with respect to this action, see (1) the applications for amendment dated October 8,1981, and December 11, 1981, (2) Amendment No. 52 to License No. DPR-72, and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, NW, Washington, D.C., and at the Crystal River Public Library, 668 N.W.
First Avenue, Crystal River, Florida. A copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C.
20555, Attention: Director, Division of Licensing.
Dated at Bethesda, Maryland, this 18th day of February 1982.
FOR THE NUCLEAR REGULATORY COMMISSION
% :h.
6 /
.U !:&
John F. Stolz, Ch ef 4 perating Reactors Branch #4 0
l Division of Licensing I
-