Applicant Exhibit A-23,consisting of Rept DCO-93-TN-N006, DCM Maint & Testing RequirementsML20059M525 |
Person / Time |
---|
Site: |
Diablo Canyon ![Pacific Gas & Electric icon.png](/w/images/f/ff/Pacific_Gas_%26_Electric_icon.png) |
---|
Issue date: |
08/23/1993 |
---|
From: |
AFFILIATION NOT ASSIGNED |
---|
To: |
|
---|
References |
---|
OLA-2-A-023, OLA-2-A-23, NUDOCS 9311190142 |
Download: ML20059M525 (11) |
|
|
---|
Category:EXHIBITS (DOCKETING AND SERVICES BRANCH INFORMATION
MONTHYEARML20059D2431994-01-0707 January 1994 Package of Intervenor Exhibits Consisting of Related Correspondence Not Admitted Into Evidence.Related Correspondence ML20059M5291993-11-19019 November 1993 Applicant Exhibits A-21,A-22,A-24,A-25,A-26,A-29 & A-F1, Consisting of Related Correspondence Not Admitted Into Evidence.Related Correspondence IR 05000275/19910041993-08-24024 August 1993 Intervenor Exhibit I-MFP-70,consisting of Insp Rept,Re Rept Numbers 50-275/91-04 & 50-323/91-04,dtd 910304 IR 05000275/19930111993-08-24024 August 1993 Intervenor Exhibit I-MFP-26,consisting of Re Insp Repts 50-275/93-11 & 50-323/93-11 ML20059M7491993-08-24024 August 1993 Intervenor Exhibit I-MFP-T-2,consisting of 920422 Rev 4 to Procedure MP E-57.8 Temp Monitoring ML20059M7521993-08-24024 August 1993 Intervenor Exhibit I-MFP-T-3,consisting of 900227 Rept, Effects of Localized High Temps Upon EQ Components ML20059M7581993-08-24024 August 1993 Intervenor Exhibit I-MFP-T-3A,consisting of 900225 Table Re EQ Devices Affected by Localized High Temperatures ML20059M7601993-08-24024 August 1993 Intervenor Exhibit I-MFP-T-4,consisting of Rev O to MP E-57.8A, Temp Monitoring ML20059C7361993-08-24024 August 1993 Intervenor Exhibit I-MFP-88,consisting of NRC Insp of Diablo Canyon Units 1 & 2 ML20059D0841993-08-24024 August 1993 Intervenor Exhibit I-MFP-139,consisting of Insp Rept Re Dockets 50-275 & 50-323,dtd 920417 IR 05000275/19920131993-08-24024 August 1993 Intervenor Exhibit I-MFP-140,consisting of 920416,mgt Meeting Repts 50-275/92-13 & 50-323/92-13 ML20059D2241993-08-24024 August 1993 Intervenor Exhibit I-MFP-220,consisting of Protest of Util IR 05000275/19910061993-08-24024 August 1993 Intervenor Exhibit I-MFP-71,consisting of Rept of EC W/Util Mgt,Re Rept Numbers 50-275/91-06 & 50-323/91-06,dtd 910411 ML20059D2071993-08-24024 August 1993 Intervenor Exhibit I-MFP-193,consisting of Review of LER 1-90-015-00,re Docket 50-275,dtd 910118 ML20059M8621993-08-24024 August 1993 Intervenor Exhibit I-MFP-35,consisting of Rept, Self- Evaluation of Diablo Canyon Power Plant, Dtd Jul 1993 IR 05000275/19920161993-08-24024 August 1993 Intervenor Exhibit I-MFP-137,consisting of Insp Rept Re Dockets 50-275/92-16 & 50-323/92-16,dtd 920707 ML20059M5041993-08-24024 August 1993 Staff Exhibit S-2,consisting of Re Notice of Violation IR 05000275/19900291993-08-24024 August 1993 Intervenor Exhibit I-MFP-69,consisting of Insp Rept,Re Rept Numbers 50-275/90-29 & 50-323/90-29,dtd 910207 IR 05000275/19920171993-08-24024 August 1993 Intervenor Exhibit I-MFP-102,consisting of Insp Rept Re Dockets 50-275/92-17 & 50-323/92-17,dtd 920508 ML20059M1381993-08-24024 August 1993 Staff Exhibit S-1,consisting of Re 920519 Enforcement Conference IR 05000275/19920261993-08-24024 August 1993 Intervenor Exhibit I-MFP-118,consisting of Notice of Violation & Insp Rept Re Docket 50-275/92-26 & 50-323/93-26,dtd 921113 ML20059D2101993-08-23023 August 1993 Intervenor Exhibit I-MFP-196,consisting of Mgt Summary, DCO-91-MM-N067 D6, Asw Pump Vault Drain Check Valves, 910115 ML20059D1721993-08-23023 August 1993 Intervenor Exhibit I-MFP-168,consisting of Mgt Summary, Ncr DCO-91-EM-N009, FCV 495/496 Corrosion, ML20059D1841993-08-23023 August 1993 Intervenor Exhibit I-MFP-178,consisting of Mgt Summary, Ncr DCO-91-TR-N044, Maintenance Personnel Qualifications, ML20059D2031993-08-23023 August 1993 Intervenor Exhibit I-MFP-192,consisting of LER 1-90-015-01, Re Docket 50-275,dtd 910125 ML20059D1961993-08-23023 August 1993 Intervenor Exhibit I-MFP-191,consisting of Nonconformance Rept & Mgt summary,DCI-90-OP-N083, P-14 ESF Actuation Due to Valve Leakage, ML20059M5251993-08-23023 August 1993 Applicant Exhibit A-23,consisting of Rept DCO-93-TN-N006, DCM Maint & Testing Requirements ML20059M6071993-08-23023 August 1993 Applicant Exhibit A-28,consisting of Re LER 1-92-009-01 Involving Dose Limits Potentially Exceeded from Chemical & Vol Control Sys Valve Diaphragm Leakage Due to Thermally Induced Degradation ML20059D2181993-08-23023 August 1993 Intervenor Exhibit I-MFP-216,consisting of Nonconformance Rept & Mgt Summary DCO-90-SE N080,dtd 920128 ML20059D1871993-08-23023 August 1993 Intervenor Exhibit I-MFP-190,consisting of Mgt Summary, Ncr DC1-91-TN-N002, Backleakage Through Check Valve FW-1-531, ML20059D1821993-08-23023 August 1993 Intervenor Exhibit I-MFP-172,consisting of Mgt Summary, Rev 00,NCR DCO-91-MM-N049, Deg 1-3 Test Cock Valve, 911002 ML20059D2121993-08-23023 August 1993 Intervenor Exhibit I-MFP-210,consisting of Rept, SI-1-8805A, Failed to Cycle on Actuation Signal, ML20059C9651993-08-21021 August 1993 Intervenor Exhibit I-MFP-122,consisting of LER 2-91-007-00, Re Docket 50-323,dtd 911101 ML20059C9431993-08-21021 August 1993 Intervenor Exhibit I-MFP-117,consisting of LER 1-92-022-00, Re Docket 50-275,dtd 921030 ML20059C9571993-08-21021 August 1993 Intervenor Exhibit I-MFP-120,consisting of LER 1-92-013-00, ML20059D0701993-08-21021 August 1993 Intervenor Exhibit I-MFP-138,consisting of Nonconformance Rept, & Rev 00,NCR DC1-92-EM-N010,dtd 920729 ML20059C9871993-08-21021 August 1993 Intervenor Exhibit I-MFP-124,consisting of Technical Review Group Meeting Minutes Distribution, & 920124 DCI-91-TI-N047, Reactor Trip Due to Personnel Error & Safety Injection Due to Leaking Steam Dump Valves ML20059M5191993-08-21021 August 1993 Applicant Exhibit A-22,consisting of Responding to Violations Noted in Insp Repts 50-275/92-26 & 50-323/92-26 ML20059C9981993-08-21021 August 1993 Intervenor Exhibit I-MFP-127,consisting of LER 2-91-007-00, Re Docket 50-323,dtd 911101 ML20059C9901993-08-21021 August 1993 Intervenor Exhibit I-MFP-126,consisting of 911030, DC2-91-TI-N088 D2, Inadvertent SI Due to Personnel Error ML20059C9631993-08-21021 August 1993 Intervenor Exhibit I-MFP-121,consisting of 910503, Ncr DC1-OP-N038, Diesel Generator Start & Valve Actuation Due to Personnel Error, Mgt Summary ML20059C9841993-08-21021 August 1993 Intervenor Exhibit I-MFP-123,consisting of LER 1-91-009-00, Re Docket 50-275,dtd 910617 ML20059M5941993-08-21021 August 1993 Applicant Exhibit A-27,consisting of Responding to Violations Noted in Insp Repts 50-275/92-16 & 50-323/92-16 ML20059D0531993-08-21021 August 1993 Intervenor Exhibit I-MFP-136,consisting of Ncr DC1-MM-N028, Unit 1 Loss of Offsite Power - 910307, ML20059D1591993-08-21021 August 1993 Intervenor Exhibit I-MFP-154,consisting of LER 1-92-004-00, Re Docket 50-275,dtd 920520 ML20059D1301993-08-21021 August 1993 Intervenor Exhibit I-MFP-149,consisting of LER 1-91-006-00, Re Docket 50-275,dtd 910425 ML20059D0081993-08-21021 August 1993 Intervenor Exhibit I-MFP-129,consisting of LER 1-92-010-00, Re Dockets 50-275 & 50-323,dtd 921015 ML20059D1671993-08-21021 August 1993 Intervenor Exhibit I-MFP-155,consisting of LER 1-91-002-01, Re Docket 50-275,dtd 910517 ML20059D1461993-08-21021 August 1993 Intervenor Exhibit I-MFP-150A,consisting of Mgt Summary, Ncr DC1-90-WP-N093, Inadvertent Ground Causes CVI, ML20059D1421993-08-21021 August 1993 Intervenor Exhibit I-MFP-150,consisting of LER 1-90-019-00, Re Docket 50-275,dtd 910128 1994-01-07
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARDCL-99-123, Comment on Prs 10CFR50 & 72 Re Reporting Requirements for Nuclear Power Reactors & Draft NUREG-1022, Event Reporting Guidelines. Util Areas of Concern Includes ESF Actuations, Significantly Degraded Components & Historical Limitations1999-09-20020 September 1999 Comment on Prs 10CFR50 & 72 Re Reporting Requirements for Nuclear Power Reactors & Draft NUREG-1022, Event Reporting Guidelines. Util Areas of Concern Includes ESF Actuations, Significantly Degraded Components & Historical Limitations ML20205N4081999-04-14014 April 1999 Comments Opposing Proposed Rules 10CFR2,19 & 20 Re Proposed Repository at Yucca Mountain.Requests Information on How Much Radiation Being Released Now at Diablo & Hanford NPPs ML20205N4601999-03-21021 March 1999 Introduces K Schumann as Representative of Nuclear Waste Committee (Nuwic) of San Lius Obispo County.Informs That Nuwic & Nuclear Waste Management Committee Concerned with Transportation of Spent Nuclear Fuel Rods from Dcnpp ML20195E8841998-11-24024 November 1998 Petition for Mod to OLs to Require Plant Owner to Have Independent Contractor Evaluate Plant Safety Culture ML20236T3011998-07-24024 July 1998 Order Prohibiting Involvement in NRC Licensed Avtivities (Effective Immediately).Lh Brooks Prohibited for 5 Yrs from Date of Order from Engaging in NRC Licensed Activities ML20248C2261998-05-22022 May 1998 Comment Opposing Revised Proposed Rule 10CFR50 Re Protection & Safety Sys ML20129J4191996-10-18018 October 1996 Order Approving Application Re Corporate Restructuring of Pacific Gas & Electric Company by Establishment of Holding Company DCL-95-206, Comment Supporting Petition for Rulemaking PRM-50-61 Re Improving Fire Protection Regulations1995-10-0606 October 1995 Comment Supporting Petition for Rulemaking PRM-50-61 Re Improving Fire Protection Regulations ML20091P8721995-08-23023 August 1995 Comment Opposing Petition for Rulemaking PRM-50-61 Re Nuclear Energy Institute Proposed Amends on Fire Safety for All NPPs DCL-95-001, Comment on Proposed Changes to Reactor Pressure Vessel Integrity Rule 10CFR50.Endorses NEI Comments1995-01-0303 January 1995 Comment on Proposed Changes to Reactor Pressure Vessel Integrity Rule 10CFR50.Endorses NEI Comments ML20077M7521994-12-30030 December 1994 Comment Opposing Proposed Rule 10CFR50 Re Shutdown & Low Power Operation for Nuclear Power Reactors DCL-94-270, Comment on Proposed Rules 10CFR2,51 & 54 Re Rulemaking for NPP License Renewal.Endorses Comments & Changes Proposed by NEI 941208 Submittal1994-12-0808 December 1994 Comment on Proposed Rules 10CFR2,51 & 54 Re Rulemaking for NPP License Renewal.Endorses Comments & Changes Proposed by NEI 941208 Submittal ML20149H0851994-11-0404 November 1994 Initial Decision (Construction Period Recovery/Recapture).* Renewed Motion to Reopen Record 940808,denied.Served on 941104.W/Certificate of Svc ML20072L2651994-08-23023 August 1994 PG&E Opposition to San Luis Obispo Mothers for Peace Renewed Motion to Reopen Record.* Util Opposes San Luis Obispo for Peace Motion Based on Affidavit Stating No Evidence Found in Motion Re Flaw in Program.W/Certificate of Svc ML20072F0291994-08-12012 August 1994 Erratum to San Luis Obispo Mothers for Peace Motion to Reopen Record.* Intervenors Corrects Error in Renewed Motion to Reopen Record Re Application for License Amend to Extend Term of Operating License for Plant.W/Certificate of Svc ML20072B2651994-08-0909 August 1994 Comment Supporting Proposed Rule 10CFR26 Re FFD Requirements Concerning Random Drug Testing ML20072A5821994-08-0808 August 1994 San Luis Obispo Mothers for Peace Renewed Motion to Reopen Record Re PG&E Application for Amend to Extend Term of OL for Plant.* Motion to Reopen Record to Introduce Insp Rept Identifying Alleged Problems W/Plant.W/Certificate of Svc ML20071L2061994-07-26026 July 1994 Comment Supporting Proposed Rule 10CFR26 Re Changing Current Drug Testing Policies to Exclude All Personnel in nonsafety-related Positions ML20072B8481994-07-26026 July 1994 Comment Opposing Proposed Rule 10CFR26 Re Changes to FFD Requirements Concerning Random Drug Testing ML20071L1901994-07-20020 July 1994 Comments on Proposed Rule 10CFR26 Re Relaxing Rule on Drug Testing of Employees Working at NPP DCL-94-134, Comment Supporting Petition for Rulemaking PRM-50-60 Re Amend to 10CFR50.54 by Changing Frequency W/Which Each Licensee Conducts Independent Reviews of Emergency Preparedness Program1994-06-27027 June 1994 Comment Supporting Petition for Rulemaking PRM-50-60 Re Amend to 10CFR50.54 by Changing Frequency W/Which Each Licensee Conducts Independent Reviews of Emergency Preparedness Program DCL-94-135, Comment Supporting Petition for Rulemaking PRM-50-59 Re Proposed Amend to 10CFR50.54(p) Concerning Frequency W/Which Licensee Conducts Independent Reviews of Security Programs1994-06-27027 June 1994 Comment Supporting Petition for Rulemaking PRM-50-59 Re Proposed Amend to 10CFR50.54(p) Concerning Frequency W/Which Licensee Conducts Independent Reviews of Security Programs ML20064D1791994-03-0707 March 1994 Pacific Gas and Electric Co Reply in Opposition to San Luis Obispo Mothers for Peace Motion to Reopen Record.* Motion to Reopen Record Denied.W/Certificate of Svc ML20064D1961994-03-0404 March 1994 Affidavit of Mj Angus Re Motion to Reopen Record ML20063L5721994-02-25025 February 1994 San Luis Obispo Mothers for Peace Re Util Application for License Amend to Extend Term of Operating License for Plant.* Advises That Record of Proceeding Should Be Reopened to Consider Insp 93-36 Re Util Surveillance of Asw Sys DCL-94-021, Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication Facilitation1994-01-26026 January 1994 Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication Facilitation ML20059D2431994-01-0707 January 1994 Package of Intervenor Exhibits Consisting of Related Correspondence Not Admitted Into Evidence.Related Correspondence ML20062N0001993-12-30030 December 1993 PG&E Reply Findings of Fact & Conclusions of Law.* Mothers for Peace Proposed Findings & Conclusions Do Not Provide Any Supportable Rationale to Change Findings & Conclusions Previously Proposed by Pg&E.W/Certificate of Svc ML20058P3931993-12-22022 December 1993 NRC Staff Findings of Fact & Conclusions of Law in Form of Initial Decision.* Certificate of Svc ML20058K7491993-12-0202 December 1993 NRC Staff Motion for Extension of Time.* Board Has Extended Filing Time for Util Until 931230.W/Certificate of Svc. Served on 931206.Granted for Board on 931203 ML20058K8771993-12-0202 December 1993 NRC Staff Motion for Extension of Time.* Requests That Board Extend Date for Staff to File Findings Until 931222. W/Certificate of Svc ML20059M5291993-11-19019 November 1993 Applicant Exhibits A-21,A-22,A-24,A-25,A-26,A-29 & A-F1, Consisting of Related Correspondence Not Admitted Into Evidence.Related Correspondence ML20058E0741993-11-19019 November 1993 San Luis Obispo Mothers for Peace Proposed Findings of Fact & Conclusions of Law Re Licensee Application for License Amend to Extend Term of Operating License for Plant.* W/ Certificate of Svc ML20059E8931993-10-28028 October 1993 Memorandum & Order (Motion for Extension of Time).* San Luis Obispo Mothers for Peace 931018 Request for two-wk Extension of Time to File Proposed Findings of Fact & Conclusions of Law Granted.W/Certificate of Svc.Served on 931029 ML20059E8531993-10-27027 October 1993 NRC Staff Response to Board Memorandum & Order Re Extension of Time.* Staff Believes That San Luis Obispo Mothers for Peace Has Shown No Good Cause for Requesting Extension to File Proposed Findings of Fact.W/Certificate of Svc ML20059E8631993-10-25025 October 1993 Pacific Gas & Electric Co Response to Motion for Extension of Time.* Util Does Not Agree W/Board Assessment That Mothers for Peace Request Appears to Be Reasonable But Will Not Oppose Request.W/Certificate of Svc ML20059B2191993-10-19019 October 1993 Memorandum & Order (Responses to Motion for Extension of Time).* Board Believes Intervenor Request for Extension of Time to File Proposed Findings of Fact Appears Reasonable. W/Certificate of Svc.Served on 931019 ML20059B1071993-10-18018 October 1993 San Luis Obispo Mothers for Peace Motion for Extension of Time for Filing Proposing Findings of Fact & Conclusions of Law.* Requests Extension of Two Wks or Until 931119 to File Proposed Findings of Fact.W/Certificate of Svc ML20057D0531993-09-23023 September 1993 Notice of Appearance.* Notice Given That Undersigned Attorney Enters Appearance in Listed Matter & Listed Info Provided.W/Certificate of Svc ML20057B0401993-09-14014 September 1993 NRC Staff Reply to PG&E Response to Staff Motion to Amend Protective Order.* NRC Staff Moves Board to Adopt Language Requested in 930817 Motion as Stated.W/Certificate of Svc ML20056G4891993-08-30030 August 1993 Pacific Gas & Electric Co Response to Motion to Amend Protective Order.* Staff Asks That Protective Order Be Clarified by Adding New Footnote to Paragraph 3 of Order. W/Certificate of Svc ML20059C7361993-08-24024 August 1993 Intervenor Exhibit I-MFP-88,consisting of NRC Insp of Diablo Canyon Units 1 & 2 IR 05000275/19920161993-08-24024 August 1993 Intervenor Exhibit I-MFP-137,consisting of Insp Rept Re Dockets 50-275/92-16 & 50-323/92-16,dtd 920707 IR 05000275/19930111993-08-24024 August 1993 Intervenor Exhibit I-MFP-26,consisting of Re Insp Repts 50-275/93-11 & 50-323/93-11 ML20059M1381993-08-24024 August 1993 Staff Exhibit S-1,consisting of Re 920519 Enforcement Conference IR 05000275/19920131993-08-24024 August 1993 Intervenor Exhibit I-MFP-140,consisting of 920416,mgt Meeting Repts 50-275/92-13 & 50-323/92-13 ML20059D0841993-08-24024 August 1993 Intervenor Exhibit I-MFP-139,consisting of Insp Rept Re Dockets 50-275 & 50-323,dtd 920417 IR 05000275/19920261993-08-24024 August 1993 Intervenor Exhibit I-MFP-118,consisting of Notice of Violation & Insp Rept Re Docket 50-275/92-26 & 50-323/93-26,dtd 921113 ML20059M5041993-08-24024 August 1993 Staff Exhibit S-2,consisting of Re Notice of Violation ML20059M8621993-08-24024 August 1993 Intervenor Exhibit I-MFP-35,consisting of Rept, Self- Evaluation of Diablo Canyon Power Plant, Dtd Jul 1993 1999-09-20
[Table view] |
Text
- - -. . . - - - . . . . . - .. . - . ._.- - . ...- . - - . . .
PG fe e,fzh&
6D- 275 3 23 - Md - Z
- g3 'Do'"
g/23 I 43 DCO-93-TN-N006) ' fe,*
August 23,11W3 DC0-93-TM-N00s '9300128 P 6 :25 DCK MAINTENANCE AND TESTING REQUIREMENTS DRAFT: August 23, 1993 . , . t ..
,,.c+
- a a 4 , . uviti-
% '4 h t . "
MANAGEMENT
SUMMARY
l During Audit 92038I, QPfrA identified a generic problem regarding i implementation of Design Criteria Memorandum (DCM) '. Category. I maintenance and testing requirements. This condition is considered a nonconformance in accordance with QAP-15.B, i "Nonconformances." Thus the purpose of this NCR is to coordinate the DCM development and review process with regards to-l maintenance and testing requirements.
i l This draft, dated August 23, 1993 contains the minutes from TRG '
! meetings held on August 19, 1993. The TRG discussed the desktop instruction: DCM - Surveillance and maintenance requirement review (number: CP3.ID2-DC1). ,
l l
l l
l l
I l
I
~
! yucttAR REGULATDW c0MM n tt '
"-~'"~
. ecmma C ~
- Statt _
> w =w -- -- -
.: .y , L_.. . -,- - - -
g7 0^
n, i n52ht/Nk __
Other ---
Reprior I 93NCRWP\93TNN006.KAB/JXC Page l'.of // ..
l 9311190142 930023 "7
- PDR ADOCK 05000275!
_ 800g,H15DN!!'l-33X3WOdd LP t 21: CG. C2 OflW .
4 l
l e i F DCO-93-TN-N006
. August 23, 1993 l
DCO-93-TN-N006 DCM MAINTENANCE AND TESTING REQUIREMENTS l I. Plant Conditions l
l Plant conditions are not applicable (N/A) to chis nonconformance.
II. Descriotion of Event A. Summary:
As described in AR A0274400 (ref. 1) and QE Q0010165 (ref. 2), Audit 92038I was performed to determine the adherence of the maintenance program to its administrative requirements.
During Atalt 92038I, QPEA identified a generic problem regarding implementation of Design Criteria Memorandum Category I maintenance and testing requirements. This condition is considered a nonconformance in accordance with QAP-15.B, "Nonconformances."
B.
Background:
To be determined (TBD).
C. Event
Description:
Reference 2 describes that contrary to the requirements of NECS E3.2 (ref. 3) and DOM S-21 (ref. 4), no test exists to provide verification of the emergency dies.' . ,
generator fuel oil day
- tank low level eWitch transfer "" '
pump start signal actuation. There is_a concern, i specifically and generically, that other DCM functional l requirements MAI not be addressed in existing i surveillance / maintenance requirements.
D. Inoperable Structures, Components, or Systems that j Contributed to the Event: !
l N/A.
E. Dates and Approximate Times for Major Occurrences:
- 1. August 25, 1992: Reference 1 documents the Audit 92038I plan.
- 2. October 22, 1992: Reference 2 documents the concern regarding EDG fuel oil 93NCRWP\93TNN006.KAB/JXC Page 2 of //-
C00*390d 80073 HIS DNin 33X3 WOH3 LP:21.CG, C2 900
e i
DCO-93-TN-N006 August 23, 1993 day tank level switch surveillance testing.
l 3. January 27, 1993: NCR DCO-93-TN-N006 initiated to investigate the concerns documented in Reference 2.
i l F. Other Systems or Secondary Functions'Affected: '
l None.
i G. Method of Discovery:
Utility personnel, during the performance of an audit activity, identified the problem.
H. Operator Actions: ,
i None required.
l I. Safety System. Responses:
None required.
III. Cause of the Event l
l l
A. Immediate Cause: <
To be determined (TBD). l B. Determination of Cause:
- 1. Human Factors:
- a. Communications: TBD.
- b. Procedures: TBD.
- c. Training
- TBD.
t i
- d. Human Factors: TBD.
1
- e. Management System: TBD. I 2._ Equipment / Material:
- a. Material Degradation: N/A.
l b. Design: N/A.
93NCRWP\93TNN006.XAB/JXC Page 3 of /['
f k
l- 900'396d 80013 HIS 9N!n133X3 WOdd- LP: 21 C6. C2f900 ,.
6 F
DCO-93-TN-N006 August 23, 1993:
- c. Installation: N/A.
- d. Manufacturing: N/A.
- e. Preventive Maintenance: N/A.
- f. Testing: N/A. ,
- g. End-of-life failure: N/A.
C. Root Cause:
Proposed: Lack of programmatic guidance for plant.
review of DCMs for surveillance and maintenance requirements.
D. Contribueory Cause:
TBD. t IV. Analysis of the Event A. Safety Analysis: ;
To be provided later. ,
B. Reportability:
- 1. Reviewed under QAP-15.B, "Noaconformances," and ,
determined to be non-conforming in accordance with Section 2.1.1.
- 2. "leviewed under 10T FR 50.72 and:10CFR 50.73.per.
NUREG 1022 and determined to not be reportable. '
- 3. This problem will not require a 10 CFR 21 report.
- 4. This problem will not be reported.via an INPO ,
Nuclear Network entry.
- 5. Reviewed under 10_CFR 50.9 and determined the event ;
was not reportable. ;
- 6. Reviewed under the criteria of administrative '
procedure (AP) C-29, " Operability Evaluation,'
requiring the issue and approval of an OE and ;
determinad that an OE is not required. '
93NCRWP\93TNN006.KAB/JXC Page. 4 of 'lljj i
500'3Ded _ __
80013-HIS DNinJ 3X31WOdd _8P: 21'CS,.iC2iDn0 _ ,_ ;
i DCO-93-TN-N006 August 23, 1993 l
V. Corrective Actions Immediate Corrective Actions:
A.
- 1. Prepare a desktop procedure for the process of reviewing Category I DCM maintenance and testing requirements, and distribute to' applicable ,
department contacts.
! RESPONSIBILITY: M. Burgess DEPAR' DENT: System Engineering-TRACKING AR: A0291937, 'AE #03 STATUS: Assigned ECD: 6/10/93
- 2. Complete the review of the S/MRR forms identified for DCMs with category I maintenance and testing.
requirements.
RESPONSIBILITY: M. Burgess DEPAR'INENT: Systems Engineering TRACKING AR: A0291937, AE #04 STATUS: ASSIGNED ECD:10/4/93 .
B. Investigative Actions: i
- 1. Assign NES_ individuals to review the list of-DCMs I to determine their " completeness" and readiness for Plant Engineering review.
]
RESPONSIBILITY: R. Breed /D. Spaulding I DEPARTMENT: "*3 ' (NCEX)
TRACKING AR:- A0291937, AE #01 STATUS: . Returned !
- 2. Investigate and develop a tracking program for review of Category I DCM maintenance and. testing requirements.
RESPONSIBILITY: Anastasio DEPARTMENT: PTED TRACKING AR: A0291937, AE #02 STATUS: Assigned i ECD: 3/8/93 l
- 3. Assemble a package of all S/MRR forms',-submitted to l date, in order to facilitate review by DCPP- ,
personnel. H 93NCRWP\93TNN006.KAB/JXC Page' 5 of //
900*390d - . , - . .
80013 His DNin ~)3X3 ' WOdd -.8 P : 21 C6. C2 000-
DCO-93-TN-N006:
August'23, 1993 RESPONSIBILITY: R. Breed DEPARTMENT: NECSEM ,
TRACKING AR: A0291937, AE #01 STATUS: . Assigned- ,
ECD: 7/12/93 Note: AE#1 has been supplemented with this action. >
- 2. Update IDAP CF3.ID2 to include instructions for i processing DCM S/MRR for1ns.
RESPONSIBILITY: R.. Breed i DEPARTMENT: Systems' Engineering TRACKING AR: A0291937, AE #04 ,
STATUS: ASSIGNED- .
ECD: 11/15/93 C. Correct ve Actions to Prevent' Recurrence:
TBD.
D. Prudent Actions . (not required for NCR closure) : >
TBD.
VI. Additional Infor1 nation ,
A. Failed Components: ,
None. ;
B. Previous Similar Events:
n a n n.
TBD.
C. Operating Experience Review:
- 1. 'NPRDS: l l 1 i N/A.
- 2. NRC Infortnation Notices, Bulletins, Generic _
Letters:
TBD.
- 3. INPO SOERs and SERs:
TBD.
93NCRWP\93TNN006.KAB/JXC Page; 6 Lofi/[
t.00
- 390d 80013 HIS DN!n.")3X3 WO8d_
_ _ _ -._ _... 6_P:21 _C6i
. C 2 D.n d._
l' lh l
DCO-93-TN-N006 I
August 23, 1993 i
l D. Trend Code:
TBD.
E. Corrective Action Tracking:
- 1. The tracking action request is A0291937
- 2. Corrective actions are not outage related.
i l P. Footnotes and Special Comments:
None.
I
- G.
References:
l
- 1. AR A0274400.
l
- 2. QE QOO10165.
I
- 3. NECS E3.2.
- 4. DCM S-21.
H. TRG Meeting Minutes:
- 1. On February 3, 1993, at 4: 00 pm PST in room 604 of the administration building, the TP.G met for the first time to discuss the basis of this nonconformance. A review of DCMD Lo determine what maintenance and testing requirements are identified and which of those are fulfilled by existing procedures arraars necessary. Investigative actions as noted herein were assigned. The TRG plans to reconvene on or about February 23, 1993 with attendance by Maintenance and Operations personnel.
- 2. On May 3, 1993, the TRG reconvened and ciscussed the following:
A possible root cause is that the p1 Ant has no program for DCM review. NECS Procedure E3.2 does not coordinate the DCM program with the plant.
Hence, a possible corrective action would be to develop a procedure for a plant DCM program. It was noted that an IDAP to replace NECS E3.2 has been drafted and is currently in the review process.
-93NCRWP\93TNN006.KAB/JXC Page 7 of /I 800*3DOd 80073 H15 DNIM 33X3 WOdd SP221 CS, CB Dnd
P DCO-93-TN-N006 August 23, 1993 The question was posed as to what specifically is PG&E's commitment to the NRC regarding the DCM program. PG&E uses the DCM program to meet the NRC's requirement to have a description of the plant design basis. It was believed that there is no single document that contains PG&E's commitments to the NRC regarding this matter. Some of these commitments were made in presentations. It was suggested that a CMD search be requested.
It was reported that Investigative ~ Action 1, to categorize DCM's needing review, is complete.
Regarding Investigative Action 2, to develop a tracking program for Category I DCM requirements, System Engineering will coordinate the reviews at E the plant.
It was clarified that these reviews are for requirements that are not governed by TS, but are mandated by NES. .
The TRG agreed to reconvene on May 20, 1993, to discuss the IDAP. Maintenance representation would be requested.
- 3. On May 20, 1993, the TRG reconvened with maintenance representatives attending, and discussed the following:
System Engineering will be responsible for identifying DCM reviewers and routing the DCNW for review. The signed review forms will be RMS'LC.
Upon review of 1PDCM, an AR will'Only be written if' it is discovered that the testing / maintenance i requirements are not currently satisfied. An action was assigned to develop a desktop procedure, or work guideline for reviewing the current backlog of DCMs.
The proposed root cause is lack of programmatic guidance for reviewing DCN's-for testing and maintenance requirements. However, no root cause analysis has been performed.
- 4. The TRG reconvened on June 23, 1993. The TRG reviewed and discussed the investigative actions.
R. Breed presented desktop instruction; DCM -
Surveillance and maintenance requirement review (number: CF3.ID2-DC1). This desktop instruction 93NCRWP\93TNN006.KAS/JXC Page 8 of /l 600'3Ddd 80073 H19 DNin 33X3 WOB3- GP: 21 C6. C2 Dnd
1 i
- DCO-93-TN-N006 j August 23, 1993
- outlines the process for conducting reviews'of- [
selected plant procedures to. assure that they are-consistent with the design basis. This desktop. :
procedure will also implemement the requirements' related to DCMs established within PD CF3 and NECS-E3.2. And lastly, the procedure will provide guidance to plant personnel for reviewing SMRR, forms pending the issue of IDAP'CF3.ID2. ,
The TRG assigned the'follcwing investigative action:
Assemble a package of all>S/MRR forms, submitted to date, in order to facilitate review by DCPP personnel. I RESPONSIBILITY: R. Breed j The TRG agreed on the following schedule: j 1
- 1. July 7 transmit S/NRR forms to DCPP -
- 2. July 7 to July 12 DCPPl review S/MRR forms.- ,
- 3. July 13 R. Breed to~ meet with System Engineering and I&C personnel to discuss tho'S/MRR forms. <
The chairman identified one concern that he had' i with the desktop procedure. The chairman's concern was with section 3.5 and'the use of "Surveillances".- The author-may need to clarify l the definition of "Surveillances".
The TRG agreed that the. desktop. procedure should have a procedure history tracking sheet and that I all affected directors should review and sign the l procedure.
THE TENTATIVE RECONVENE DATE FOR THE TRG IS' AUGUST 4, 1993.
I 93NCRWP\93TNN006.KAB/JXC Page 9 ' of f // -
O!O*39Bd 80073 HIS 9Nin 33X3 WOMd '0G221 CG.EC2 906 j
1 8 DCO-93-TN-N006 August 23, 1993
- 5. On August 18, 1993, the TRG reconvened and discussed the following:
The TRG agreed that the ccope of the NCR is to ensure that a program exists for the review of DCM's related to surveillance and maintenance requirements.
Individual discrepancies will be addressed on AR's. An AR should be initiated when problems are' identified.
Systems and maintenance engineering will review the latest version of CF3ED2-DC1 by 9/15/93.
The TRG chairman determined that the IDAP CF3.ID2 draft should eventually include the Desktop Instructions.
Some departments (i.e. NES-EE) have already reviewed and identified existing plant procedures chat satisfy the rLquirements. The procedures needs DCPP concurrence. DCPP must also concur with the categorization (I,II,III) of the surveillance /
maintenance requirements.
Only 41 DOM's have surveillance / maintenance requirements. Other DCM's don't have surveillance / maintenance requirements or are unresolved in open items. Reviews for the 41 DCM's and associated-S/MRR forms are in progress.
System Teams will coordinate the S/MRR review through the system engineers.
The TRG developed the following immediate correcti.e actions:
- 1. Complete the review of the S/MRR forms identified for DCMs with category I maintenance and testing requirements.
RESPONSIBILITY: M. Burgess DEPARTMENT: Systems Engineering TRACKING AR: A0291937, AE #04 STATUS: ASSIGNED ECD:10/4/93 The TRG developed the following corrective action:
- 1. Update IDAP CF3.ID2 to include instructione for l processing DCM S/MRR forms. )
RESPONSIBILITY: R. Breed 93NCRWP\93TNN006.KAB/JXC Page 10 of . // '
It0'390d 80013 H1G DNIn 33X3 WOdd 05:21 CG. C2 900 J
i e <
l
.- i
(- +* 210*3DWd 1W101 ++
DCO-93-TN-N006 August 23, 1991 DEPARTMENT: Systems Engineering TRACKING AK:'A0291937 AE #04 STATUS: ASSIGNED ECD: 11/15/93 TRG will reconvene on 9/30/93 to oign off the NCR.-
I. Remarks:
None.
J. Attachment (s) :
None.