Memorandum & Order (Motion for Extension of Time).* San Luis Obispo Mothers for Peace 931018 Request for two-wk Extension of Time to File Proposed Findings of Fact & Conclusions of Law Granted.W/Certificate of Svc.Served on 931029
ML20059E893
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/28/1993
From: Bechhoefer C
Atomic Safety and Licensing Board Panel
To:
SAN LUIS OBISPO MOTHERS FOR PEACE
References
CON-#493-14428 93-669-03-OLA-2, 93-669-3-OLA-2, OLA-2, NUDOCS 9311040030
Download: ML20059E893 (4)


Text

, .. . . . .-

//f 9b28 ,

en _

'-hrL 93 DCI 29 li'.i :14 -

UNITED STATES OF AMERICA

  • NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

Charles Bechhoefer, Chairman Dr. Jerry R. Kline Frederick J. Shon In the Matter* of Docket Nos. 50-275-OLA-2 50-323-OLA-2 PACIFIC GAS AND ELECTRIC COMPANY ASLBP No. 92-669-03-OLA-2 (Diablo Canyon Nuclear Power Plant, Units 1 and 2) (Construction Period  !

Recovery)

Facility Operating Licenses No. DPR-80 and DPR-82 October 28, 1993 MEMORANDUM AND ORDER (Motig for Extension of Time)

On October 18, 1993, San Luis Obispo Mothers for Peace (MFP) filed a motion seeking a two-week extension of time within which to file its proposed findings of fact and conclusions of law, which are currently scheduled for filing on November 5, 1993. MFP justified its request by citing the complex nature of the record, limitations on the resources available to it, and the substantial time before the proposed amendments are to take effect.

1 9311040030 931020' PDR 9

ADDCK 05000275 PDR 7,, l

'9 5

I

~

l

]

l 1

By our Memorandum and Order (Responses to Motion for  !

Extension of Time), dated October 19, 1993, we established response dates for PG&E and the NRC Staff. We also noted that,Ron its face, MFP's request appeared reasonable and that we would need compelling reasons to deny it. Further, we noted a revised schedule for filing proposed findings 1

were the extension to be granted, affording the Staff and l PG&E equivalent extensions for their filings. )

In timely responses dated October 25, 1993 and October 27, 1993, respectively, PG&E and the Staff noted  ;

some reservations about the adequacy of the reasons advanced by MFP but did not oppose granting the extension. ,

Accordingly, MFP's requested extension of time is aranted.

The resulting schedule will result in a filing date of Friday, November 19, 1993, for MFP; Friday, December 10, 1993 for the NRC Staff's proposed findings of fact / conclusions of law; and Monday, December 20, 1993 for PG&E's reply.

IT IS SO ORDERED.

For the Atomic Safety and Licensing Board 1 o ffIEN / ,

Charles Bechhoefer, phairman l ADMINISTRATIVE JUDGE

-1 Bethesda, Maryland October 28, 1993

?

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of PACIFIC GAS AND ELECTRIC COMPANY Docket No.(s) 50-275/323-OLA-2 :

(Diablo Canyon Nuclear Power Plant, Unit Nos. I and 2)  ;

I CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing LB M&O (MOTION FR EXT OF' TIME).

have been served upon the following persons by U.S. mail, first class, except as otherwise noted and in accordance with the requirements of 10 CFR Sec. 2.712.'

i Office of Commission Appellate Administrative Judge Adjudication Charles Bechhoefer, Chairman U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board. ,

Washington, DC 20555 U.S. Nuclear Regulatory Commission Washington, DC 20555 Administrative Judge Administrative Judge Jerry R. Kline Frederick J. Shon Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission ,

Washington, DC .20555 Washington, DC 20555 Ann P. Hodgdon, Esq. C. J. Warner, Esq.  ;

Office of the General Counsel Richard F. Locke, Esq.

U.S. Nuclear Regulatory Commission Pacific Gas & Electric Company Washington, DC 20555 77 Beale Street San Francisco, CA 94106 j

Robert R. Wellington, Esq. Joseph B. Knotts,'Jr., Esq. ,

Diablo Canyon Independent Safety David A. Repka, Esq. t Committee Winston & Strawn ,

B57 Cass Street, Suite D 1400 L Street, N.W. l Monterey, CA 93940 Washington, DC 20005 >

f i

i l

1

)

)

4 Docket No.(s)50-275/323-0LA-2 i LB M&O (MOTION FR EXT OF TIME)  ;

't Truman Burns Peter G. Fairchild, Esq.

Robert Kinosian California Public Utilities Commission  ;

California Public Utilities Commission 505 Van Ness Avenue  :

505 Van Ness, Room 4103 San Francisco, CA 94102 ,

San Francisco, CA 94102 Nancy Culver, President Diane Curran, Esq. .

Board of Directors Counsel for SLOMFP t Mothers for Peace c/o IEER .  ;

P. O. Box 164 6935 Laurel Avenue, Suite 204 Pismo Beach, CA 93448 Takoma Park, MD 20912 i i

i Dated at Rockville, Md. this 29 day of October.1993 -