SNRC-1740, Application for Amend to License NPF-82,revising Tech Specs Re Defueled SAR

From kanterella
(Redirected from ML20058N539)
Jump to navigation Jump to search
Application for Amend to License NPF-82,revising Tech Specs Re Defueled SAR
ML20058N539
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 08/10/1990
From: Leonard J
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058N542 List:
References
SNRC-1740, NUDOCS 9008140188
Download: ML20058N539 (2)


Text

~

mw g >

h-(

_M 4

,v i .n. \

qj 9 _

1

[ bid ] f

y_
mme '

y.

d,g LONG_ ISLAND LIGHTING COMPANY f:

~'

'{- r i SHOREHAM NUCLEAR POWER STATION P.0, BOX M4, NORTH COUNTRY ROAD

  • WADING RIVER, N.Y.11792 -

ae JdT) D. Isratd, Jr. i n IVloe Ptmident Office of Oxpcrate Services . l

{ w; ed Office of Mr.ler y y L SNRC-1740. l L AUG 101990 -

y -l U. S. Nuclear _ Regulatory Commission' i ATTN: Socument Control Desk .

Washington, D.C. 20555 ]

Revision to Defueled Safety Analysis Report N Shoreham Nuclear Power' Station.- Unit 1 Docket No. 50-322 j l !

r Gentlemen:

, .On January 5, 1990, Long Island Lighting Company (LILCO) .I submitted;a' request-to. amend Facility' Operating License NPF-82

-(see W. : E.J Steiger to . NRC, SNRC-1644) . Included inisupport of- Ji'

, ;that appl ~ication (as Attachment 3) was the Shoreham Defueled Safety Analysis Report :(DSAR) . .

ELI$COhereby. submits. revision"ItotheDSARwhichensuresthe

~

DSAR text-accurately' reflects the plant configuration under the

-J 4 Shoreham Layup Implementation Program (SLIP)-and deletes noble

l Revisions are inc]uded'-in DSARLSections 7.1,:

gastmonitoring.

9f2, 9.4,-10.4, . 11.1, and 11.6.

In the early 1980s',.when the pre-operational REMP was being .

~

formul~ted, a it was decided to include noble-gases in the sampling

. program. This decision, even though a prudent and technically correct one, was.not required by NRC regulations. The sampling  ;

- for' noble gases continued'through the pre-operational and .

.operationaliphases.of REMP, but late in 1989, LILCO decided'to

' change the operational'REMP. The defueled condition of the -

planti then and now, makes noble gas monitoring technically

unnecessary.

Pages without revision bars are those for which the text contained'on the page has been relocated but there is no change in the text itself. l 0(

9 p .

o188 900810

.h81jDOCK05000322 > h\

PDC

?' .

r.

  • =
  • f ; , _t '

,9

,3 c,.

^

q

'i.i t

[ ,' y E\ ' c '

SNRC-1740;

'l L Pagel-2.

c 5

5 7 i fIf you.have any questions regarding this;submittali please:doinot .

hesitate._to_ contact my office forfurtheriinformation.. LILCO' Lstands; ready.to. assist the_ NRC in'any appropriate way in itsi

~ review of=the'e'nclosed materials. y i

Very truly yours,;

_i 4

i

) .,

9 . l )  ;,

e h

g,  ;

I hn D.-. Leonard,_Jr., . , .. ...

Vice resident,0ffice of orporate Services

~

and ffice of Nuclear PGP/ap- , ,,

t cc t. S. Brown -j

'T.;T..' Martin B. Norris. 'i I

k l5 If L

?

5

)

h 4

L f

i g h' '

4 j

i I

ki '