ML20045G460

From kanterella
Jump to navigation Jump to search
Forwards Rev 19 to FSAR for Crystal River,Unit 3,revising Sections 1.7 to Reflect Organizational Changes Made to Nuclear Operations & 2.2.2 & 2.2.7.1 to Reflect Installation of Blockade at Bulkhead Line of Site Discharge Canal
ML20045G460
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/01/1993
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045G461 List:
References
3F0793-01, 3F793-1, NUDOCS 9307140008
Download: ML20045G460 (3)


Text

r; >

/-

Florida Power COf4PORATION

$$N July 1, 1993 3F0793-01 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

Subject:

Final Safety Analysis Report, Revision 19

Dear Sir:

Florida Power Corporation (FPC) is submitting one (1) signed original and ten (10) copies of Revision 19 to the Crystal River Unit 3 Final Safety Analysis Report (FSAR). This revision is submitted in accordance with the requirements given in 10 CFR 50.71(e). Included in this FSAR Revision are the following:

o Section 1.7 was revised to reflect the organizational changes made to Nuclear Operations. ,

o Sections 2.2.2 and 2.2.7.1 were revised to reflect installation of a blockade at the bulkhead line of the site discharge canal.

o Section 4.2.3.8 was revised to reflect installation of an additional sample point for Radiation Monitor RM-A6.

o Chapters 5, 6, 9, and 14 were revised to reflect replacement of the sodium hydroxide system with passive trisodium phosphate baskets, o Sections 8.2.2 and 8.2.3 were revised to reflect the installation of the backup E.S. transformer.

o Section 10.6 was revised to reflect the addition' of the Auxiliary Feedwater (AFW) Pump, FWP-7, and associated equipment.

o Additicaal minor administrative changes.

140001 {)

GENERAL OFFICE: 3201 Thirty-fourth Street South . P.O. Box 14042 St. Petersburg, Florida 33733 * (813) 866-5151 930714000B 930701 i A Florida Progress Company PDR K

ADOCK 05000302 PDR

}Qi g

p U. S. Nuclear Reg'Jiatory Commission 3F0793-01' Page 2 o Appendices 2B and 2C are being removed from the updated FSAR because they were deleted from the operating license FSAR in Amendment 28, dated August 1, 1973. Through an administrative error in compiling the updated FSAR, these appendices were inadvertently included.

The copy of the FSAR revision required by 10 CFR 50.4 for the NRC Resident Inspector will be provided to our Senior Resident Inspector through FPC's internal controlled documentation distribution system.

Sincerely, f j' cru wl P. M/ Beard, Jr.

Senior Vice President Nuclear Operations Attachments PMB/GMF:ff xc: Regional Administrator, Region 11 Senior Resident Inspector NRR Project Manager i

l l

p  %

4 U. S. Nuclear Regulatory Commission 3F0793-01 Page 3 STATE OF FLORIDA COUNTY OF CITRUS P. M. Beard, Jr. states that he is the Senior Vice President, Nuclear Operations for Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.

I P. M. Beard, Jr.

Senior Vice President Nuclear Operations Subscribed and sworn to b fore me, a Notary Public in and for the State and County above named, this. ay of July, 1993.

b YAlblV $. $Mf 77l LL. - -

Notary Public (print) Notary Public (signature)

Notary Public, State of Florida at Large, Notary Publ6c. State of Florida et Large My Commission Expires Dec. 18,1995 My Commission Expire #"d'd 'h'u Asent's Netary erokerage l

. - .