Forwards Rev 2 to Security Plan for Long Term Defueled Condition,Fuel Storage in Spent Fuel Pool,Amended Security Training & Rev 6 to Qualification Plan.Encls Withheld (Ref 10CFR73.21)
ML20045E901
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 07/01/1993
From: Leslie Hill
LONG ISLAND POWER AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LSNRC-2083, NUDOCS 9307060196
Download: ML20045E901 (2)


Text

i sgnunBS NOMON .

Long Zuham muclear Power St tion ,

Island P.O. Box 628 Power North Country Road '

=l Authority Wading River, N.Y.11792

)

JUL 011993 LSNRC-2083 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 (1) SNPS Security Plan for Long Term  ;

Defueled Condition, Fuel Storage in the Spent Fuel Pool; (2) Safeguards Contingency Plan; (3) Security Training and Qualification-Plan Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322 4

Gentlemen:

In accordance with the requirements of Title 10 of the Code of Federal Regulations, Parts 50.4 and 50.54(p), the Long Island Power Authority (LIPA) hereby submits the original and three copies to the USNRC Document Control Desk and two copies to U.S.

NRC Region 1 of: Revision 2 to the Shoreham Nuclear Power Station Security Plan for Long Term Defueled Condition, Fuel Storage in the Spent Fuel Pool; the amended Safeguards Contingency Plan, ,

Revision 6; and the amended Security Training and Qualification Plan, Revision 6. The revision to the Security Plan was prepared to reflect changes in the plant configuration which have resulted .

from decommissioning activities. The revision to the Safeguards Contingency Plan and Security Training and Qualification Plan'was prepared to conform with the Security Plan revision. LIPA has determined that these revisions do not decrease the effectiveness of the plans; therefore, these revisions will be.made effective July 15, 1993.

A description of the changes associated with the revised plans is provided as Attachment 1 to each plan. All safeguards

-capabilities specified in the plans are available and functional; conforming revisions to detailed procedures were developed; and 9 appropriate personnel have been trained to respond to safeguards f #q incidents as outlined in the revised plans and as specified in ' s/

the revised detailed procedures. 2

\

ENCLO5URE CONTAINS SAFEGU ARDS INFORMATION.

SAFEUATiDS INF0FJ!ATION veON 3tp3 RATION 1 sis g7o PAGE 15 !WC($dTROLI.ID F pg2 --

~

w auuns mo n nan i LSNRC-2083 i Page 2  ;

The SNPS Security Plan for Long Term Defueled Condition, Fuel Storage in the Spent Fuel Pool, and the Safeguards Contingency Plan contain. Safeguards Information and must be protected in ,

accordance with 10CFR73.21. ,

Should you have any questions concerning these revisions, please i contact Mr. A. Downs, Division Manager, Nuclear Security and Training at (516) 929-3287.

Very truly yours, Ib M. Hill t Resident Manager

  • Shoreham Station LMH/AFD/jm:ab Attachments cc: L. Bell C. L. Pittiglio i T. T. Martin R. Nimitz E. McPeak  ;

-h P

s

)

t ENCLOSURE CONTAINS

$AFEGUARDS INf 0RMAM gg StpAR ATION WIS PAGg ts DCCONTROMD SAFESUARDS INFORMADON

.