Forwards Rev 2 to Performance Testing Procedure PT-340, Acceptance Criteria. Procedure Submitted in Response to NRC Request for Voltage Dip Data from Most Recent Integrated Engineered Safeguards Actuation Test
ML20045D376
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/16/1993
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045D377 List:
References
3F0693-10, 3F693-10, NUDOCS 9306280302
Download: ML20045D376 (1)


Text

.- . , - . ,

4 ese e

S  %

18 0 e e

ese Florida Power C o R PO R AT ION Crystal River Unit 3 Dockat No. 50-302 June 16, 1993 3F0693-10 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

Emergency Diesel Generator Voltage Dips '

Dear Sir:

In a recent conversation .with the NRR Project Manager for Crystal River 3, Florida Power Corporation was requested to submit the voltage dip data from the most recent integrated engineered safeguards actuation test of the diesel ,'

generators. The attachment to this letter satisfies that. request.

Sincerely,

. . Beard, Jr. .

Senior Vice President Nuclear Operations j PMB/AEF:

Attachment xc: Regional Administrator, Region II l NRR Project Manager Senior Resident inspector L. '

(

f00G{

l GENERAL OFFICE: 3201 Thirty-fourth _. Street South e P.O. Box 14042 *

'\\

St. Petert, burg, Florida 33733 * (813) 866-5151 02 P . P DR -

._ _