Responds to NRC Bulletin 93-002, Debris Plugging in ECC Suction Strainers. Two Ventilation Sys Trains Located within Reactor Bldg Contain Fiberglass Media in Filters.Mods Made to Preclude Movement of Filter Media During Operation
ML20045B246
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/07/1993
From: Beard P, Boldt G
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0693-01, 3F693-1, IEB-93-002, IEB-93-2, NUDOCS 9306170020
Download: ML20045B246 (3)


Text

  • .

b -

Florida Power CORPORATION Crystal hvor Unit 3 man June 7, 1993 ,

3F0693-01 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

Subject:

Response to NRC Bulletin 93-02

Reference:

NRC to FPC letter, 3N0593-03, dated May 11, 1993

Dear Sir:

Florida Power Corporation (FPC) is submitting this letter as the response required by Action Item I of NRC Bulletin 93-02, " Debris Plugging of Emergency Core Cooling Suction Strainers." FPC has determined that Crystal River Unit 3 (CR-3) has two ventilation system trains within the Reactor Building (RB) that contains fiberglass media in the filters. These ventilation filters are identified as AHFL-10A and AHFL-108, which are part of the Reactor Building Cavity Cooling System (XB). No other fibrous material is temporarily stored in the RB.

The Bulletin directed that immediate compensatory measures be taken to assore the functional capability of the ECCS. FPC's compensatory measures are comprised of two steps which assures that the ECCS remains functional. First, modifications were made in 1990 to preclude movement of the filter media during normal operation. When the frames which hold the 18 filters in place were observed to be suffering from reduced structural integrity due to corrosion, FPC installed new stainless steel racks and secured the upstream face access with %" stainless steel screen to preclude an event from blowing the filters out. Since the filter frames have not been designed to withstand LOCA forces, they will be removed as discusse.d later.

150100 i

GENERAL OFFICE: 3201 TNrty-fourth street south . P.O. Box 14D42 . St. Petersburg, Florida 33733 (813) 866-5151 9306170020 930607 g PDR ADOCK 05000302 .

O PDR (/

i

~ U. S. Nuclear Regulatory Commission  :

3F0693-01  !

Page 2 Second, before the completion of the midcycle maintenance outage which ended on April 26,1993, Reactor Building inspections by Nuclear Operators were performed to assure that no loose debris (trash, rags, clothing, or other material) was present which could be transported to the RB emergency sump and cause restriction :

of the LPI pump suction during LOCA conditions. The RB inspectors were directed specifically to look for debris in the RB sump and look for loose debris on the - '

RB floor. No debris was found which could impact ECCS performance.

FPC has determined that these filters may be removed while CR-3 is at power.

However, prudent planning is required to minimize the personnel exposure to radiation and heat stress. That planning has already started. FPC will remove  ;

filters AHFL-10A & AHFL-10B no later than September 7,'1993 in accordance with i the Bulletin guidance. FPC expects the filters will be removed before this date.  ;

In accordance with Bulletin Action Item 2, FPC will advise the NRC within 30 days after the completion of the filter removal.

Sincerely,

/ h G. L. B61dt for .

P. M. Beard, Jr.

Senior Vice President Nuclear Operations PMB/JWT:ff xt: Regional _ Administrator, Region II Senior Resident Inspector NRR Project Manager

I 4 STATE OF FLORIDA COUNTY OF CITRUS G. L. Boldt states that he is the Vice President, Nuclear Production for Florida Power Corporation; that he is authorized on the part of said company ,

to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth  ;

therein are true and correct to the best of his knowledge, information, and belief.

kduYW /

G. L. Boldt  :

Vice President Nuclear Production Subscribed and sworn to before me, a Notary Public in and for the State and '

County above named, this r/dday of June,1993.

i BMES&nivi ,whdow?.

p .-

Notary Public (print) Notary Public (signature)

Notary Public, State g[,Jylpgga44,(prgy,,,t,,,,

s IAy Commission Empires Dec. 18,1995 My Commission Expires sonoco snru agent's watery erokeres.

I e