ML20043B920
| ML20043B920 | |
| Person / Time | |
|---|---|
| Issue date: | 11/30/1988 |
| From: | Speis T NRC |
| To: | Stello V NRC |
| Shared Package | |
| ML20042C963 | List:
|
| References | |
| FRN-53FR49886, RULE-PR-CHP1 NUDOCS 9006010045 | |
| Download: ML20043B920 (1) | |
Text
p *= %_
y g'i NOV 3 01988 i
NOTE FOR: Vic Stello-
- FROM:
Themis Speis o Enclosed are (1) a Comission paper providing the basis for a schedule extension beyond that requested by the Comission for develoaing a BRC policy statement and (2) a FRN on a
- public wor kshop to receive public coments on a proposed BRC policy statement.
l following the workshop written public coments will be received o
for two weeks.
On many issues a Federal Register notice such as this would o
be signed out within RES.
However, because of your interest in this topic and the high.
o visibility it receives from-the Comission, we have prepared the FRN for your signature, j
o Given that we have already held the International Workshop, a single additional workshop should be sufficient.
The combination of the workshop and the brief public comment.
o period serves as the approximate equivalent of an advance notice.
An alternative plan,-which would accelerate the development of a o
final policy, would involve extending the date of the written coment period on the current draft policy statement (perhaps to 60 days). and developing a final policy based on coments received.
4
.l l
(-
900601caSS 891130 h1hFR49886 PDC
.~
,w a
-- -- - -